Transport/conveying system changeover adjustment
In short
It appears in fewer than 1 of every 100 lines studied.
When it appears, it takes on average about 55 % of the line's lost time. Reported by 0 of the 60 studies that could observe it (sparse evidence).
What happens
When switching to a different product or pan format on the baking line, the conveying and transfer elements (belts, transfer bars, lane guides, pan carriers) must be mechanically repositioned, exchanged or recalibrated to match the new product geometry. This mechanical reconfiguration and the subsequent trial runs to confirm smooth product handover between stages consume time between the last good unit of the previous run and the first good unit of the new run.
What is done about it
Apply SMED principles to the transport subsystem: pre-stage format-specific guide rails, transfer bars and pan carriers on quick-release mounts, use tool-less adjustment mechanisms with pre-set reference marks, and prepare changeover kits and checklists in advance so the mechanical reconfiguration is standardized and performed off-line wherever possible.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.4% [0.1–1.3%]
- Expected share of lost time
- 0.2% [0.0–0.7%]
- Share of lost time when present
- 55% [41–66%]
- Studies / units
- 60 / 73
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.5% [0.0–2.1%]5 studies
- Soft drinks, bottled water and juices0.5% [0.0–2.1%]1 study
- Brewing, wine and spirits0.5% [0.0–2.2%]0 studies
- Bakery and pasta0.5% [0.0–1.6%]27 studies
- Meat, poultry and seafood0.5% [0.0–2.1%]2 studies
- Fruit and vegetable processing0.5% [0.0–2.2%]2 studies
- Grain and oilseed milling0.5% [0.0–2.2%]0 studies
- Sugar and confectionery0.5% [0.0–1.9%]8 studies
- Snacks, coffee, tea and other foods0.5% [0.0–2.0%]4 studies
- Animal feed and pet food0.5% [0.0–2.0%]4 studies
- Food manufacturing (unspecified or mixed)0.5% [0.0–2.0%]7 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceWhen switching to a different product or pan format on the baking line, the conveying and transfer elements (belts, transfer bars, lane guides, pan carriers) must be mechanically repositioned, exchanged or recalibrated to match the new product geometry. This mechanical reconfiguration and the subsequent trial runs to confirm smooth product handover between stages consume time between the last good unit of the previous run and the first good unit of the new run.
How it looks in SCADA data
Engineering guidanceMES/SCADA logs show the line or conveyor segment in a changeover or manual-adjustment state with no product flow, often accompanied by repeated manual jog commands on conveyor drives, guide-rail position changes, and intermittent start/stop cycles before the line stabilizes at target speed and the first good-unit count increments.
Countermeasure
Engineering guidanceApply SMED principles to the transport subsystem: pre-stage format-specific guide rails, transfer bars and pan carriers on quick-release mounts, use tool-less adjustment mechanisms with pre-set reference marks, and prepare changeover kits and checklists in advance so the mechanical reconfiguration is standardized and performed off-line wherever possible.
4Sources
- Modelo propuesto para la implementación de la metodología SMED en una empresa de alimentos de Santiago de Cali (2017)Open sourceNumber of events: 21.0 events · as reported: “Transports”
Show verbatim quote
Transportes 21 28:21