In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 59 % of the line's lost time. Reported by 1 of the 127 studies that could observe it (sparse evidence).
What happens
The loss record only states that production was observed to be delayed or interrupted somewhere in the process, without identifying the equipment, operation or physical cause responsible for the stop. The underlying mechanism cannot be inferred from the available description.
What is done about it
Improve the granularity of downtime reporting by requiring operators to select a structured cause code and affected asset at the moment of logging, and retrain staff on standardized loss-recording procedures so that future events can be classified into a specific category.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.5% [0.1–1.4%]
- Expected share of lost time
- 0.3% [0.1–0.9%]
- Share of lost time when present
- 59% [48–69%]
- Studies / units
- 127 / 161
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.6% [0.1–2.1%]13 studies
- Soft drinks, bottled water and juices0.6% [0.1–1.9%]26 studies
- Brewing, wine and spirits0.6% [0.1–2.3%]11 studies
- Bakery and pasta0.6% [0.1–2.0%]24 studies
- Meat, poultry and seafood0.6% [0.1–2.3%]9 studies
- Fruit and vegetable processing0.7% [0.1–2.4%]7 studies
- Grain and oilseed milling0.6% [0.1–2.4%]6 studies
- Sugar and confectionery0.6% [0.1–2.1%]9 studies
- Snacks, coffee, tea and other foods0.6% [0.1–2.3%]5 studies
- Animal feed and pet food0.6% [0.1–2.4%]7 studies
- Food manufacturing (unspecified or mixed)0.9% [0.1–3.6%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe loss record only states that production was observed to be delayed or interrupted somewhere in the process, without identifying the equipment, operation or physical cause responsible for the stop. The underlying mechanism cannot be inferred from the available description.
How it looks in SCADA data
Engineering guidanceIn SCADA/MES logs this appears as a generic downtime or delay entry with a vague free-text comment, lacking a specific machine state, alarm code or fault tag, and often not linked to a particular line segment or asset.
Countermeasure
Engineering guidanceImprove the granularity of downtime reporting by requiring operators to select a structured cause code and affected asset at the moment of logging, and retrain staff on standardized loss-recording procedures so that future events can be classified into a specific category.
4Sources
- Implementation of TPM total productive maintenance methodology to improve productivity in a frozen food company (2023)Open sourceShare of loss events: 44.0 % · as reported: “OBS. EN PROCESO”
Show verbatim quote
OBS. EN PROCESO 44%
- Implementation of TPM total productive maintenance methodology to improve productivity in a frozen food company (2023)Open sourceShare of loss events: 66.0 % · as reported: “Retrasos en Procesos”