Non-value-added time within washing cycle
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 64 % of the line's lost time. Reported by 1 of the 80 studies that could observe it (sparse evidence).
What happens
The washing equipment's actual cycle time includes waiting, manual handling, indexing or dwell steps that do not add cleaning value, so the effective cycle is longer than the technically achievable (optimized) cycle. This stretches the time per batch or per container beyond the ideal rate without the line stopping outright.
What is done about it
Perform a time-and-motion or value-stream analysis of the washing cycle to identify and remove non-value-added steps, re-sequence loading/unloading and indexing, and retune cycle parameters so the operating cycle approaches the optimized reference time.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.8% [0.2–2.2%]
- Expected share of lost time
- 0.5% [0.1–1.4%]
- Share of lost time when present
- 64% [50–76%]
- Studies / units
- 80 / 102
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.9% [0.1–3.5%]10 studies
- Soft drinks, bottled water and juices1.1% [0.1–3.5%]27 studies
- Brewing, wine and spirits0.9% [0.1–3.1%]12 studies
- Bakery and pasta1.0% [0.1–3.7%]0 studies
- Meat, poultry and seafood1.0% [0.1–3.6%]4 studies
- Fruit and vegetable processing0.9% [0.1–3.4%]4 studies
- Grain and oilseed milling1.0% [0.1–3.8%]3 studies
- Sugar and confectionery0.9% [0.1–3.5%]3 studies
- Snacks, coffee, tea and other foods0.9% [0.1–3.4%]4 studies
- Animal feed and pet food0.9% [0.1–3.5%]4 studies
- Food manufacturing (unspecified or mixed)0.9% [0.1–3.4%]9 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe washing equipment's actual cycle time includes waiting, manual handling, indexing or dwell steps that do not add cleaning value, so the effective cycle is longer than the technically achievable (optimized) cycle. This stretches the time per batch or per container beyond the ideal rate without the line stopping outright.
How it looks in SCADA data
Engineering guidanceMES/SCADA records show washing cycle duration consistently above the theoretical or best-demonstrated cycle time, with internal sub-state logs revealing idle, waiting or non-productive segments inside the cycle rather than discrete fault alarms. Throughput per hour for the washer is below its rated capacity even though no stop events are flagged.
Countermeasure
Engineering guidancePerform a time-and-motion or value-stream analysis of the washing cycle to identify and remove non-value-added steps, re-sequence loading/unloading and indexing, and retune cycle parameters so the operating cycle approaches the optimized reference time.
4Sources
- Integrating Lean Manufacturing and TPM for Production Efficiency Improvement: A Peruvian Case Study in the Bottled Water Industry (2024)Open sourceLost time: 13.8 hours · as reported: “washing process cycle time including non-value-added activities”
Show verbatim quote
the total process time for washing was calculated at 13.81 hours, with a production rate of 74.05 botellones per hour.
- Integrating Lean Manufacturing and TPM for Production Efficiency Improvement: A Peruvian Case Study in the Bottled Water Industry (2024)Open sourceLost time: 7.07 hours · as reported: “optimized washing process cycle time”
Show verbatim quote
the process time was reduced from 13.81 hours to 7.07 hours, representing a time reduction of 48.79%.