Reduced speed

Non-value-added time within washing cycle

Reduced speedPerformanceContainer washing and rinsing

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 64 % of the line's lost time. Reported by 1 of the 80 studies that could observe it (sparse evidence).

What happens

The washing equipment's actual cycle time includes waiting, manual handling, indexing or dwell steps that do not add cleaning value, so the effective cycle is longer than the technically achievable (optimized) cycle. This stretches the time per batch or per container beyond the ideal rate without the line stopping outright.

What is done about it

Perform a time-and-motion or value-stream analysis of the washing cycle to identify and remove non-value-added steps, re-sequence loading/unloading and indexing, and retune cycle parameters so the operating cycle approaches the optimized reference time.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.8% [0.2–2.2%]
Expected share of lost time
0.5% [0.1–1.4%]
Share of lost time when present
64% [50–76%]
Studies / units
80 / 102
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.9% [0.1–3.5%]10 studies
  • Soft drinks, bottled water and juices
    1.1% [0.1–3.5%]27 studies
  • Brewing, wine and spirits
    0.9% [0.1–3.1%]12 studies
  • Bakery and pasta
    1.0% [0.1–3.7%]0 studies
  • Meat, poultry and seafood
    1.0% [0.1–3.6%]4 studies
  • Fruit and vegetable processing
    0.9% [0.1–3.4%]4 studies
  • Grain and oilseed milling
    1.0% [0.1–3.8%]3 studies
  • Sugar and confectionery
    0.9% [0.1–3.5%]3 studies
  • Snacks, coffee, tea and other foods
    0.9% [0.1–3.4%]4 studies
  • Animal feed and pet food
    0.9% [0.1–3.5%]4 studies
  • Food manufacturing (unspecified or mixed)
    0.9% [0.1–3.4%]9 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The washing equipment's actual cycle time includes waiting, manual handling, indexing or dwell steps that do not add cleaning value, so the effective cycle is longer than the technically achievable (optimized) cycle. This stretches the time per batch or per container beyond the ideal rate without the line stopping outright.

How it looks in SCADA data

Engineering guidance

MES/SCADA records show washing cycle duration consistently above the theoretical or best-demonstrated cycle time, with internal sub-state logs revealing idle, waiting or non-productive segments inside the cycle rather than discrete fault alarms. Throughput per hour for the washer is below its rated capacity even though no stop events are flagged.

Countermeasure

Engineering guidance

Perform a time-and-motion or value-stream analysis of the washing cycle to identify and remove non-value-added steps, re-sequence loading/unloading and indexing, and retune cycle parameters so the operating cycle approaches the optimized reference time.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 13.8 hours · as reported: “washing process cycle time including non-value-added activities”
    Show verbatim quote
    the total process time for washing was calculated at 13.81 hours, with a production rate of 74.05 botellones per hour.
  2. Lost time: 7.07 hours · as reported: “optimized washing process cycle time”
    Show verbatim quote
    the process time was reduced from 13.81 hours to 7.07 hours, representing a time reduction of 48.79%.