Integrating Lean Manufacturing and TPM for Production Efficiency Improvement: A Peruvian Case Study in the Bottled Water Industry

Open source

1Bibliographic record

Authors
Salvatore Balza Tassara-Chumbiauca, Mateo Rodrigo Gordillo-Egúsquiza
Year
2024
Venue
International Conference on Industrial Engineering and Operations Management (IEOM)
Country
Peru
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
180 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
This case study concerns a company involved in the bottling of table water in 20-litre containers, including polyethylene, polycarbonate and polypropylene drums.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
material shortages
Show verbatim quote (Section 4.3, Inventory Management Improvements)
The downtime caused by material shortages was reduced by 80%, from 15,558 hours to 3,111 hours.
Organizational or external stops (material or personnel shortage, utilities outage)Lost time3,111 hBoth extractors agreed
unplanned stoppages
Show verbatim quote (Section 4.3, Implementation of Total Productive Maintenance (TPM))
the total downtime due to unplanned stoppages was reduced from 3.79 hours to 2.46 hours per week, representing a reduction of 35.09%.
Equipment failure (breakdowns)Lost time2.46 h/weekBoth extractors agreed
material shortages
Show verbatim quote (Section 4.3, Inventory Management Improvements)
the lack of proper inventory management was responsible for 15,558 hours of downtime due to material shortages, resulting in a financial loss of S/33,760.86.
Organizational or external stops (material or personnel shortage, utilities outage)Lost time15,558 hBoth extractors agreed
unplanned machine stoppages
Show verbatim quote (Section 4.3, Implementation of Total Productive Maintenance (TPM))
The bottleneck analysis revealed that unplanned machine stoppages accounted for a total downtime of 3.79 hours per week, which had a direct impact on the overall production capacity and efficiency of the plant.
Equipment failure (breakdowns)Lost time3.79 h/weekBoth extractors agreed
—
Show verbatim quote (Table 1, Results of validation of the proposed model)
Real production rate bottels/hr 74.06 99.60 92.93 25.48%
noneThroughput74.1 bottels/hrBoth extractors agreed
—
Show verbatim quote (Table 1, Results of validation of the proposed model)
Quality rate % 96.87% 99% 99% 2.20%
noneQuality99.0 %Both extractors agreed
—
Show verbatim quote (Table 1, Results of validation of the proposed model)
Quality rate % 96.87% 99% 99% 2.20%
noneQuality96.9 %Both extractors agreed
—
Show verbatim quote (Table 1, Results of validation of the proposed model)
Performance rate % 76.83% 95% 94% 22.35%
nonePerformance94.0 %Both extractors agreed
—
Show verbatim quote (Table 1, Results of validation of the proposed model)
Performance rate % 76.83% 95% 94% 22.35%
nonePerformance76.8 %Both extractors agreed
—
Show verbatim quote (Section 4.3, Standardization of the Washing Process)
The production rate increased from 74.05 to 92.37 botellones per hour, which resulted in a substantial improvement in overall plant efficiency.
noneThroughput92.4 botellones/hBoth extractors agreed
—
Show verbatim quote (Section 4.3, Implementation of Total Productive Maintenance (TPM))
The plant's OEE increased from 54.67% to 71%, reflecting the gains in efficiency achieved through the implementation of TPM.
noneOEE71.0 %Both extractors agreed
—
Show verbatim quote (Section 4.3, Implementation of Total Productive Maintenance (TPM))
The plant's OEE increased from 54.67% to 71%, reflecting the gains in efficiency achieved through the implementation of TPM.
noneOEE54.7 %Both extractors agreed
—
Show verbatim quote (Section 4.3, Implementation of Total Productive Maintenance (TPM))
This led to a significant improvement in the availability of equipment, which increased from 73.45% to 76%, allowing the plant to operate at higher efficiency levels.
noneAvailability73.5 %Both extractors agreed
—
Show verbatim quote (Section 4.3, Standardization of the Washing Process)
the total process time for washing was calculated at 13.81 hours, with a production rate of 74.05 botellones per hour.
noneThroughput74.1 botellones/hSingle extractor
—
Show verbatim quote (Section 4.3, Standardization of the Bottling Process)
The overall equipment effectiveness (OEE) in this process increased from 54.67% to 68.19%, reflecting the substantial gains in efficiency achieved through the implementation of the standardization procedures.
noneOEE54.7 %Single extractor
non-value-added tasks (manual inspection, placement of caps, storage of finished products)
Show verbatim quote (Section 4.3, Standardization of the Bottling Process)
The analysis showed that these inefficiencies resulted in an excessive time consumption of about 2.59 hours in non-value-added tasks.
Not classifiable from the reportLost time2.59 hSingle extractor
—
Show verbatim quote (Section 4.3, Standardization of the Bottling Process)
The production yield increased from 76.83% to 94.02%, and the quality of the final product improved from 96.87% to 99.22%, bringing it closer to world-class standards.
noneYield94.0 %Single extractor
—
Show verbatim quote (Section 4.3, Standardization of the Bottling Process)
The production yield increased from 76.83% to 94.02%, and the quality of the final product improved from 96.87% to 99.22%, bringing it closer to world-class standards.
noneQuality99.2 %Single extractor
—
Show verbatim quote (Section 4.3, Standardization of the Bottling Process)
The overall equipment effectiveness (OEE) in this process increased from 54.67% to 68.19%, reflecting the substantial gains in efficiency achieved through the implementation of the standardization procedures.
noneOEE68.2 %Single extractor
discards
Show verbatim quote (Table 1, Results of validation of the proposed model)
Discards rate % 3.13% 2% 0.96% -69.33%
Process defects (scrap and rework)Defect rate3.13 %Single extractor
—
Show verbatim quote (Section 4.3, Implementation of Total Productive Maintenance (TPM))
This led to a significant improvement in the availability of equipment, which increased from 73.45% to 76%, allowing the plant to operate at higher efficiency levels.
noneAvailability76.0 %Single extractor
—
Show verbatim quote (Table 1, Results of validation of the proposed model)
Real production rate bottels/hr 74.06 99.60 92.93 25.48%
noneThroughput92.9 bottels/hrSingle extractor
discards
Show verbatim quote (Table 1, Results of validation of the proposed model)
Discards rate % 3.13% 2% 0.96% -69.33%
Process defects (scrap and rework)Defect rate0.960 %Single extractor
product defects
Show verbatim quote (Table 1, page 118)
Discards rate | % | 3.13% | 2% | 0.96% | -69.33%
Process defects (scrap and rework)Defect rate3.13 %Single extractor
washing process cycle time including non-value-added activitieswashing equipment
Show verbatim quote (Section 4.3 Standardization of the Washing Process, page 108)
the total process time for washing was calculated at 13.81 hours, with a production rate of 74.05 botellones per hour.
Not classifiable from the reportLost time13.8 hoursSingle extractor
product defects
Show verbatim quote (Table 1, page 118)
Discards rate | % | 3.13% | 2% | 0.96% | -69.33%
Process defects (scrap and rework)Defect rate0.960 %Single extractor
optimized washing process cycle timewashing equipment
Show verbatim quote (Section 4.3 Standardization of the Washing Process, page 108)
the process time was reduced from 13.81 hours to 7.07 hours, representing a time reduction of 48.79%.
Not classifiable from the reportLost time7.07 hoursSingle extractor
optimized bottling process cycle timebottling and packaging equipment
Show verbatim quote (Section 4.3 Standardization of the Bottling Process, page 115)
the cycle time decreased from 5.10 hours to 2.51 hours, representing a 50.78% reduction in time.
Not classifiable from the reportLost time2.51 hoursSingle extractor

Observation units

  • Plant (whole bottling plant) · Whole line or unspecified equipment · After intervention
  • Plant (whole bottling plant) · Whole line or unspecified equipment · Baseline
  • Washing process · Container washing and rinsing · After intervention
  • Washing process · Container washing and rinsing · Baseline
  • Bottling process · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • Bottling process · Packaging (forming, sealing, wrapping, case packing, palletizing) · After intervention
  • Bottled water packaging line · Whole line or unspecified equipment · Baseline
  • Bottled water packaging line · Whole line or unspecified equipment · After intervention