PLANT MAINTENANCE STRATEGY FOR IMPROVED PRODUCTION IN THE FOOD AND BEVERAGE INDUSTRIES

Open source

1Bibliographic record

Authors
Onyejaka, Chidi Maurice
Year
2024
Venue
—
Country
Nigeria
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Multiple case study
Extraction scope
Full text
Size
3 plants · — lines · 5 machines
Observation period
1,825 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
Table 4.1 shows that the Filler machine – Benin Plant was purchased in 2008 and the type of maintenance approaches carried out were preventive and usage-based maintenance. The machine has a capacity of 1650CPH – (CPH: Cases Per Hour).

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%.0 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—Filler machine
Show verbatim quote (Table 4.5)
Year five (2021) 99.9
noneQuality99.9 %Both extractors agreed
—Filler machine
Show verbatim quote (Table 4.4)
Year Five (2021) 113.63%
nonePerformance114 %Both extractors agreed
—Filler machine
Show verbatim quote (Table 4.4)
Year Four (2020) 66.23%
nonePerformance66.2 %Both extractors agreed
—Filler machine
Show verbatim quote (Table 4.4)
Year Three(2019) 129.32%
nonePerformance129 %Both extractors agreed
—Filler machine
Show verbatim quote (Table 4.4)
Year Two (2018) 108.25%
nonePerformance108 %Both extractors agreed
—Filler machine
Show verbatim quote (Table 4.4)
Year One (2017) 104.11%
nonePerformance104 %Both extractors agreed
—Filler machine
Show verbatim quote (Table 4.3)
Year Five (2021) 96.9
noneAvailability96.9 %Both extractors agreed
—Filler machine
Show verbatim quote (Table 4.3)
Year Four (2020) 92.5
noneAvailability92.5 %Both extractors agreed
—Filler machine
Show verbatim quote (Table 4.3)
Year Three(2019) 96.0
noneAvailability96.0 %Both extractors agreed
—Filler machine
Show verbatim quote (Table 4.3)
Year Two (2018) 95.6
noneAvailability95.6 %Both extractors agreed
—Filler machine
Show verbatim quote (Table 4.3)
Year One (2017) 94.8
noneAvailability94.8 %Both extractors agreed
machine breakdownFiller machine
Show verbatim quote (Table 4.2)
Total number of hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
Equipment failure (breakdowns)Lost time124 hoursSingle extractor
machine breakdownFiller machine
Show verbatim quote (Table 4.2)
Total number of hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
Equipment failure (breakdowns)Lost time107 hoursSingle extractor
machine breakdownFiller machine
Show verbatim quote (Table 4.2)
Total number of hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
Equipment failure (breakdowns)Lost time146 hoursSingle extractor
machine breakdownFiller machine
Show verbatim quote (Table 4.2)
Total number of hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
Equipment failure (breakdowns)Lost time153 hoursSingle extractor
machine breakdownFiller machine
Show verbatim quote (Table 4.2)
Total number of hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
Equipment failure (breakdowns)Lost time109 hoursSingle extractor

Observation units

  • Filler Machine - NBC Benin Plant · Filling · Baseline