Equipment failure (breakdowns)

Filler equipment breakdown (unspecified failure mode)

Equipment failure (breakdowns)AvailabilityFilling

In short

It appears in about 4 of every 100 lines studied.

When it appears, it takes on average about 58 % of the line's lost time. Reported by 17 of the 120 studies that could observe it (strong evidence).

What happens

The filling machine stops unexpectedly due to a mechanical, electrical, pneumatic or control fault that degrades or interrupts its function, and the line cannot resume normal operation until maintenance personnel diagnose and repair the fault. The primary records only report the event as a generic breakdown without identifying the specific failed component or subsystem.

What is done about it

Apply root-cause failure analysis supported by condition monitoring and detailed fault logging to identify the specific failing component, then implement targeted preventive or predictive maintenance, spare-parts readiness and operator fault-detection training to reduce repair time and recurrence.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
3.7% [1.4–7.5%]
Expected share of lost time
2.2% [0.8–4.4%]
Share of lost time when present
58% [48–66%]
Studies / units
120 / 162
Evidence grade
A

Grade A: 10 or more studies and 10 or more distinct lines, with a 95% credible interval narrower than 0.20.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    5.5% [1.3–13.0%]18 studies
  • Soft drinks, bottled water and juices
    6.1% [2.4–11.6%]44 studies
  • Brewing, wine and spirits
    3.1% [0.7–7.9%]16 studies
  • Bakery and pasta
    4.4% [0.8–13.1%]0 studies
  • Meat, poultry and seafood
    5.0% [1.1–13.9%]6 studies
  • Fruit and vegetable processing
    4.0% [0.7–11.6%]4 studies
  • Grain and oilseed milling
    3.8% [0.7–10.8%]6 studies
  • Sugar and confectionery
    4.0% [0.7–11.8%]3 studies
  • Snacks, coffee, tea and other foods
    5.0% [1.0–13.5%]6 studies
  • Animal feed and pet food
    4.0% [0.7–11.5%]4 studies
  • Food manufacturing (unspecified or mixed)
    6.5% [1.5–17.3%]13 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The filling machine stops unexpectedly due to a mechanical, electrical, pneumatic or control fault that degrades or interrupts its function, and the line cannot resume normal operation until maintenance personnel diagnose and repair the fault. The primary records only report the event as a generic breakdown without identifying the specific failed component or subsystem.

How it looks in SCADA data

Engineering guidance

SCADA/MES logs show the filler entering a fault or down state with a stop duration exceeding the minor-stop threshold, often with a generic or unspecific alarm code, no cycling of the filling heads, and starvation downstream while upstream buffers fill or block, until a maintenance work order closes the event.

Countermeasure

Engineering guidance

Apply root-cause failure analysis supported by condition monitoring and detailed fault logging to identify the specific failing component, then implement targeted preventive or predictive maintenance, spare-parts readiness and operator fault-detection training to reduce repair time and recurrence.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 124 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
  2. Lost time: 107 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
  3. Lost time: 146 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
  4. Lost time: 153 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
  5. Lost time: 109 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
  6. Lost time: 120 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 120 130 217.5 386 114.5
  7. Lost time: 130 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 120 130 217.5 386 114.5
  8. Lost time: 218 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 120 130 217.5 386 114.5
  9. Lost time: 386 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 120 130 217.5 386 114.5
  10. Lost time: 115 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 120 130 217.5 386 114.5
  11. Lost time: 124 hours · as reported: “machine breakdown”
    Show verbatim quote
    Total number of hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
  12. Lost time: 107 hours · as reported: “machine breakdown”
    Show verbatim quote
    Total number of hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
  13. Lost time: 146 hours · as reported: “machine breakdown”
    Show verbatim quote
    Total number of hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
  14. Lost time: 153 hours · as reported: “machine breakdown”
    Show verbatim quote
    Total number of hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
  15. Lost time: 109 hours · as reported: “machine breakdown”
    Show verbatim quote
    Total number of hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
  16. Lost time: 20.0 min · as reported: “ABIBUS fault filler”
    Show verbatim quote
    ABIBUS fault filler 0 0 0 0 20 0 20 1.37
  17. Share of lost time: 1.37 % · as reported: “ABIBUS fault filler”
    Show verbatim quote
    ABIBUS fault filler 0 0 0 0 20 0 20 1.37
  18. Lost time: 20.0 min · as reported: “ABIBUS fault filler”
    Show verbatim quote
    1 | ABIBUS fault filler | 0 | 0 | 0 | 0 | 20 | 0 | 20 | 1.37
  19. Lost time: 386 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 120 130 217.5 386 114.5
  20. Lost time: 130 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 120 130 217.5 386 114.5
  21. Lost time: 120 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 120 130 217.5 386 114.5
  22. Lost time: 124 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
  23. Lost time: 115 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 120 130 217.5 386 114.5
  24. Lost time: 218 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 120 130 217.5 386 114.5
  25. Lost time: 109 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
  26. Lost time: 153 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
  27. Lost time: 146 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
  28. Lost time: 107 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 123.66 107.33 146.33 153.4 108.5
  29. Lost time: 20.0 min · as reported: “case filler”
    Show verbatim quote
    case filler 2 20 109 3248 97.32 92.37
  30. Number of events: 2.00 events · as reported: “case filler”
    Show verbatim quote
    case filler 2 20 109 3248 97.32 92.37
  31. Number of events: 44.0 events · as reported: “Problem in the filler (code 6003)”
    Show verbatim quote
    The code 6003, referring to downtimes caused by problems with the filler, consumed 473 minutes, having occurred 44 times during the period assessed in this work (Figure 3).
  32. Lost time: 473 min · as reported: “Problem in the filler (code 6003)”
    Show verbatim quote
    The code 6003, referring to downtimes caused by problems with the filler, consumed 473 minutes, having occurred 44 times during the period assessed in this work (Figure 3).
  33. Lost time: 67.6 h · as reported: “breakdown loss”
    Show verbatim quote
    This can reduce Filling 1 downtime from 393.78 hours to 67.62 hours and Blowing 1 from 91.35 hours to 14.75 hours.
  34. Time between events: 38,693 not reported · as reported: “Filling Roller”
    Show verbatim quote
    Waktu Kerusakan Weibull MTTF 38693,38
  35. Time between events: 22,079 not reported · as reported: “Pegas Tiang Filler”
    Show verbatim quote
    Waktu Kerusakan Weibull MTTF 22078,51
  36. Share of lost time: 69.1 % · as reported: “Breakdown Losses”
    Show verbatim quote
    Breakdown Losses 22.049,83 69,12 1
  37. Lost time: 22,050 min · as reported: “Breakdown Losses”
    Show verbatim quote
    Breakdown Losses 22.049,83 69,12 1
  38. Mean event duration: 197 not reported · as reported: “Pegas Tiang Filler”
    Show verbatim quote
    Waktu Perbaikan Weibull MTTR 197
  39. Mean event duration: 211 not reported · as reported: “Filling Roller”
    Show verbatim quote
    Waktu Perbaikan Weibull MTTR 211
  40. Lost time: 60.0 min · as reported: “Lunch”
    Show verbatim quote
    Lunch (L) 1 times per 60 min. – 60 min.
  41. Lost time: 5.20 h · as reported: “Prepared”
    Show verbatim quote
    Prepared 4.6 12.4 5.2 8.1 3.5 3.3
  42. Specific energy: 8.10 Wh/1000 Bottles · as reported: “Prepared”
    Show verbatim quote
    Prepared 4.6 12.4 5.2 8.1 3.5 3.3
  43. Lost time: 0 h · as reported: “Lack”
    Show verbatim quote
    Lack 0.1 1.3 0.0 0.0 4.6 4.4
  44. Specific energy: 0 Wh/1000 Bottles · as reported: “Lack”
    Show verbatim quote
    Lack 0.1 1.3 0.0 0.0 4.6 4.4
  45. Lost time: 7.80 h · as reported: “Tailback”
    Show verbatim quote
    Tailback 6.8 145.8 7.8 9.9 4.8 4.6
  46. Specific energy: 9.90 Wh/1000 Bottles · as reported: “Tailback”
    Show verbatim quote
    Tailback 6.8 145.8 7.8 9.9 4.8 4.6
  47. Lost time: 4.90 h · as reported: “Equipment failure”
    Show verbatim quote
    Equipment failure 8.1 195.6 4.9 6.5 2.5 2.2
  48. Specific energy: 6.50 Wh/1000 Bottles · as reported: “Equipment failure”
    Show verbatim quote
    Equipment failure 8.1 195.6 4.9 6.5 2.5 2.2
  49. Lost time: 33.0 h · as reported: “Held”
    Show verbatim quote
    Held 29.2 48.7 33 37.4 31.7 25.2
  50. Specific energy: 37.4 Wh/1000 Bottles · as reported: “Held”
    Show verbatim quote
    Held 29.2 48.7 33 37.4 31.7 25.2
  51. Lost time: 97.2 jam · as reported: “Failure”
    Show verbatim quote
    Failure = 97.2 Jam Setup & adjustment = 6.6 jam Downtime = 103.8 jam
  52. Share of lost time: 3.00 % · as reported: “meals or break”
    Show verbatim quote
    The next is 34% of cleaning inspection and lubrication process, 19% of operational stoppages, 3% of meals or break, 2% of change over time, and the last 1% of planned maintenance.
  53. Lost time: 3,835 min · as reported: “Equipment Failure”
    Show verbatim quote
    the Equipment Failure factor (52.7%), or equivalent,t to 3,835 minutes
  54. Share of lost time: 52.7 % · as reported: “Equipment Failure”
    Show verbatim quote
    the Equipment Failure factor (52.7%), or equivalent,t to 3,835 minutes
  55. Lost time: 12.1 jam · as reported: “Equipment Failure Losses”
    Show verbatim quote
    Equipment Failure Losses 12,13 39,23 77,67%
  56. Lost time: 0 mnt · as reported: “Breakdown”
    Show verbatim quote
    1 Breakdow n 0 0 0
  57. Lost time: 0 mnt · as reported: “Breakdown”
    Show verbatim quote
    1 Breakdow n 0 0 0
  58. Lost time: 0 mnt · as reported: “Breakdown”
    Show verbatim quote
    1 Breakdow n 0 0 0
  59. Lost time: 0 mnt · as reported: “Breakdown”
    Show verbatim quote
    Breakdown 0 mnt 0 mnt
  60. Lost time: 0 mnt · as reported: “Breakdown”
    Show verbatim quote
    Breakdown 0 mnt 0 mnt
  61. Share of lost time: 55.8 % · as reported: “filling machine break down often”
    Show verbatim quote
    The first reason had a lot of problems that caused the filling machine to break down often (55.8% of the problems) and setup time delays (44.2% of the inefficiencies).
  62. Time between events: 5.03 h · as reported: “averías de la máquina de envasado”
    Show verbatim quote
    el MTBF es de 5.03 horas y el MTTR es de 1.69 horas, afectando estas la disponibilidad del equipo
  63. Mean event duration: 1.69 h · as reported: “averías de la máquina de envasado”
    Show verbatim quote
    el MTBF es de 5.03 horas y el MTTR es de 1.69 horas, afectando estas la disponibilidad del equipo
  64. Share of lost time: 41.1 % · as reported: “averías/reparaciones”
    Show verbatim quote
    los motivos son las averías / reparaciones, reprocesos, cambios de formato y otros donde estas representan el 41.1%, 35.7% y 23.3% respectivamente
  65. Share of lost time: 35.7 % · as reported: “reprocesos”
    Show verbatim quote
    los motivos son las averías / reparaciones, reprocesos, cambios de formato y otros donde estas representan el 41.1%, 35.7% y 23.3% respectivamente
  66. Share of planned time: 7.38 % · as reported: “Averías/Paros”
    Show verbatim quote
    Preparación de línea Averías / Paros Reprocesos en envasado 1,15% 7,38% 6,35%
  67. Share of planned time: 4.62 % · as reported: “Regulaciones”
    Show verbatim quote
    Regulaciones 4,62%
  68. Share of planned time: 1.90 % · as reported: “Limpieza”
    Show verbatim quote
    Limpieza 1,90%
  69. Share of planned time: 5.10 % · as reported: “Tiempos de inactividad”
    Show verbatim quote
    Tiempos de inactividad 5,10%
  70. Share of planned time: 3.70 % · as reported: “Alimentación”
    Show verbatim quote
    Alimentación 3,70%
  71. Time between events: 13.3 hr · as reported: “averías de la máquina de envasado”
    Show verbatim quote
    MTBF 5,03 hr 13.32 hr 15,00 hr
  72. Time between events: 3.33 min · as reported: “averías de la máquina de envasado”
    Show verbatim quote
    MTBF 12,67 14,62 12,67 3.33
  73. Mean event duration: 0.200 min · as reported: “averías de la máquina de envasado”
    Show verbatim quote
    MTTR 0,80 0,77 0,80 0,20
  74. Share of planned time: 1.00 % · as reported: “Averías/Paros”
    Show verbatim quote
    Preparación de línea Averías / Paros ELIMINADO 1,15% 1,00%
  75. Share of planned time: 1.30 % · as reported: “Regulaciones”
    Show verbatim quote
    Regulaciones 1,30% REDUCIDO
  76. Share of planned time: 1.90 % · as reported: “Limpieza”
    Show verbatim quote
    Limpieza 1,90%
  77. Share of planned time: 1.50 % · as reported: “Tiempos de inactividad”
    Show verbatim quote
    Tiempos de inactividad 1,50% REDUCIDO
  78. Share of planned time: 3.70 % · as reported: “Alimentación”
    Show verbatim quote
    Alimentación 3,70%
  79. Share of planned time: 9.39 % · as reported: “machine damage”
    Show verbatim quote
    losses due to machine damage with a losses value of 9.389%
  80. Lost time: 160 min · as reported: “Filler”
    Show verbatim quote
    Planned losses (min) | 0 | 160 | 0 | 0 | 0 | 160 | 7
  81. Lost time: 494 min · as reported: “Filler”
    Show verbatim quote
    Operational losses (min) | 278 | 494 | 106 | 53 | 157 | 1088 | 48
  82. Lost time: 364 min · as reported: “Filler”
    Show verbatim quote
    Equipment losses (min) | 420 | 364 | 24 | 55 | 152 | 1015 | 44.8