foratvise
Get Started
Included study

Analysis of Packaging Machine Effectiveness with Overall Equipment Effectiveness and Six Big Losses : Analisis Efektivitas Mesin Packaging Menggunakan Metode Overall Equipment Effectiveness dan Six Big Losses

Open source

1Bibliographic record

Authors
Nurardisa, Acyuta Intan, Winursito, Yekti Condro
Year
2025
Venue
JATI EMAS (Jurnal Aplikasi Teknik dan Pengabdian Masyarakat)
DOI
—
Country
Indonesia
Segment
Bakery and pasta
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · — lines · 1 machines
Observation period
46 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
Perusahaan ini memiliki fokus dalam memproduksi biskuit. Dalam melakukan pengemasan produk menggunakan mesin packaging. Mesin yang digunakan oleh adalah jenis semi otomatis.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Tabel 6)
Berdasarkan Tabel 6, rata-rata OEE bulan September-oktober 2024 adalah 74,21.
noneOEE74.2 %Single extractor
—
Show verbatim quote (Tabel 3)
Berdasarkan Tabel 3, nilai rata-rata untuk avaibility ratio dari periode September-oktober adalah 86,79%.
noneAvailability86.8 %Single extractor
—
Show verbatim quote (Tabel 4)
Berdasarkan Tabel 4, nilai rata-rata periode September-Oktober adalah 87,22%.
nonePerformance87.2 %Single extractor
—
Show verbatim quote (Tabel 5)
Berdasarkan Tabel 5, nilai rata-rata periode September-oktober adalah 98,03%.
noneQuality98.0 %Single extractor
—
Show verbatim quote (Tabel 7)
Rata-Rata 3,87 2,11 3,87 12,78 1,72 0,00
Equipment failure (breakdowns)Share of planned time3.87 %Single extractor
—
Show verbatim quote (Tabel 7)
Rata-Rata 3,87 2,11 3,87 12,78 1,72 0,00
Setup and adjustmentsShare of planned time2.11 %Single extractor
—
Show verbatim quote (Tabel 7)
Rata-Rata 3,87 2,11 3,87 12,78 1,72 0,00
Idling and minor stops (micro-stops)Share of planned time3.87 %Single extractor
—
Show verbatim quote (Tabel 7)
Rata-Rata 3,87 2,11 3,87 12,78 1,72 0,00
Reduced speedShare of planned time12.8 %Single extractor
—
Show verbatim quote (Tabel 7)
Rata-Rata 3,87 2,11 3,87 12,78 1,72 0,00
Process defects (scrap and rework)Share of planned time1.72 %Single extractor
—
Show verbatim quote (Tabel 7)
Rata-Rata 3,87 2,11 3,87 12,78 1,72 0,00
Start-up losses (reduced yield)Share of planned time0 %Single extractor
—
Show verbatim quote (Tabel 2)
9–13 Sep 2024 2100 37 87 272
Equipment failure (breakdowns)Lost time87.0 menitSingle extractor
—
Show verbatim quote (Tabel 2)
9–13 Sep 2024 2100 37 87 272
Setup and adjustmentsLost time37.0 menitSingle extractor
Down time
Show verbatim quote (Tabel 2)
9–13 Sep 2024 2100 37 87 272
Not classifiable from the reportLost time272 menitSingle extractor
—
Show verbatim quote (Tabel 2)
19–23 Sep 2024 2100 39 86 306
Equipment failure (breakdowns)Lost time86.0 menitSingle extractor
—
Show verbatim quote (Tabel 2)
19–23 Sep 2024 2100 39 86 306
Setup and adjustmentsLost time39.0 menitSingle extractor
Down time
Show verbatim quote (Tabel 2)
19–23 Sep 2024 2100 39 86 306
Not classifiable from the reportLost time306 menitSingle extractor
—
Show verbatim quote (Tabel 2)
1–5 Okt 2024 2100 43 76 269
Equipment failure (breakdowns)Lost time76.0 menitSingle extractor
—
Show verbatim quote (Tabel 2)
1–5 Okt 2024 2100 43 76 269
Setup and adjustmentsLost time43.0 menitSingle extractor
Down time
Show verbatim quote (Tabel 2)
1–5 Okt 2024 2100 43 76 269
Not classifiable from the reportLost time269 menitSingle extractor
—
Show verbatim quote (Tabel 2)
21–25 Okt 2024 2100 58 76 263
Setup and adjustmentsLost time58.0 menitSingle extractor
Down time
Show verbatim quote (Tabel 2)
21–25 Okt 2024 2100 58 76 263
Not classifiable from the reportLost time263 menitSingle extractor

Observation units

  • Mesin packaging (packaging machine), PT XYZ · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline