Included study
Analysis of Packaging Machine Effectiveness with Overall Equipment Effectiveness and Six Big Losses : Analisis Efektivitas Mesin Packaging Menggunakan Metode Overall Equipment Effectiveness dan Six Big Losses
1Bibliographic record
- Authors
- Nurardisa, Acyuta Intan, Winursito, Yekti Condro
- Year
- 2025
- Venue
- JATI EMAS (Jurnal Aplikasi Teknik dan Pengabdian Masyarakat)
- DOI
- —
- Country
- Indonesia
- Segment
- Bakery and pasta
- Process family
- Filling and packaging line
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · — lines · 1 machines
- Observation period
- 46 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Perusahaan ini memiliki fokus dalam memproduksi biskuit. Dalam melakukan pengemasan produk menggunakan mesin packaging. Mesin yang digunakan oleh adalah jenis semi otomatis.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Tabel 6)Berdasarkan Tabel 6, rata-rata OEE bulan September-oktober 2024 adalah 74,21. | none | OEE | 74.2 % | Single extractor |
—Show verbatim quote (Tabel 3)Berdasarkan Tabel 3, nilai rata-rata untuk avaibility ratio dari periode September-oktober adalah 86,79%. | none | Availability | 86.8 % | Single extractor |
—Show verbatim quote (Tabel 4)Berdasarkan Tabel 4, nilai rata-rata periode September-Oktober adalah 87,22%. | none | Performance | 87.2 % | Single extractor |
—Show verbatim quote (Tabel 5)Berdasarkan Tabel 5, nilai rata-rata periode September-oktober adalah 98,03%. | none | Quality | 98.0 % | Single extractor |
—Show verbatim quote (Tabel 7)Rata-Rata 3,87 2,11 3,87 12,78 1,72 0,00 | Equipment failure (breakdowns) | Share of planned time | 3.87 % | Single extractor |
—Show verbatim quote (Tabel 7)Rata-Rata 3,87 2,11 3,87 12,78 1,72 0,00 | Setup and adjustments | Share of planned time | 2.11 % | Single extractor |
—Show verbatim quote (Tabel 7)Rata-Rata 3,87 2,11 3,87 12,78 1,72 0,00 | Idling and minor stops (micro-stops) | Share of planned time | 3.87 % | Single extractor |
—Show verbatim quote (Tabel 7)Rata-Rata 3,87 2,11 3,87 12,78 1,72 0,00 | Reduced speed | Share of planned time | 12.8 % | Single extractor |
—Show verbatim quote (Tabel 7)Rata-Rata 3,87 2,11 3,87 12,78 1,72 0,00 | Process defects (scrap and rework) | Share of planned time | 1.72 % | Single extractor |
—Show verbatim quote (Tabel 7)Rata-Rata 3,87 2,11 3,87 12,78 1,72 0,00 | Start-up losses (reduced yield) | Share of planned time | 0 % | Single extractor |
—Show verbatim quote (Tabel 2)9–13 Sep 2024 2100 37 87 272 | Equipment failure (breakdowns) | Lost time | 87.0 menit | Single extractor |
—Show verbatim quote (Tabel 2)9–13 Sep 2024 2100 37 87 272 | Setup and adjustments | Lost time | 37.0 menit | Single extractor |
Down timeShow verbatim quote (Tabel 2)9–13 Sep 2024 2100 37 87 272 | Not classifiable from the report | Lost time | 272 menit | Single extractor |
—Show verbatim quote (Tabel 2)19–23 Sep 2024 2100 39 86 306 | Equipment failure (breakdowns) | Lost time | 86.0 menit | Single extractor |
—Show verbatim quote (Tabel 2)19–23 Sep 2024 2100 39 86 306 | Setup and adjustments | Lost time | 39.0 menit | Single extractor |
Down timeShow verbatim quote (Tabel 2)19–23 Sep 2024 2100 39 86 306 | Not classifiable from the report | Lost time | 306 menit | Single extractor |
—Show verbatim quote (Tabel 2)1–5 Okt 2024 2100 43 76 269 | Equipment failure (breakdowns) | Lost time | 76.0 menit | Single extractor |
—Show verbatim quote (Tabel 2)1–5 Okt 2024 2100 43 76 269 | Setup and adjustments | Lost time | 43.0 menit | Single extractor |
Down timeShow verbatim quote (Tabel 2)1–5 Okt 2024 2100 43 76 269 | Not classifiable from the report | Lost time | 269 menit | Single extractor |
—Show verbatim quote (Tabel 2)21–25 Okt 2024 2100 58 76 263 | Setup and adjustments | Lost time | 58.0 menit | Single extractor |
Down timeShow verbatim quote (Tabel 2)21–25 Okt 2024 2100 58 76 263 | Not classifiable from the report | Lost time | 263 menit | Single extractor |
Observation units
- Mesin packaging (packaging machine), PT XYZ · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline