Miscellaneous and unclassified losses
In short
It appears in about 10 of every 100 lines studied.
When it appears, it takes on average about 59 % of the line's lost time. Reported by 35 of the 127 studies that could observe it (strong evidence).
What happens
This bucket groups heterogeneous stoppage and loss reasons that operators or analysts log under generic residual labels such as other, general, trial, or shift end rather than a specific technical root cause. The underlying events are physically unrelated (minor jams, broken parts, product defects, meal or shift breaks, external utility faults) and are merged only because the original reporting system lacked a finer category for them.
What is done about it
Review and refine the loss reporting taxonomy with operators and reliability engineers so that events currently logged as other or general are reassigned to specific equipment, defect, or organizational causes. Introduce mandatory free-text or structured sub-reason fields at the point of data entry to reduce the size of the residual category over time.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 10% [5–17%]
- Expected share of lost time
- 6.0% [3.1–10.0%]
- Share of lost time when present
- 59% [51–67%]
- Studies / units
- 127 / 161
- Evidence grade
- A
Grade A: 10 or more studies and 10 or more distinct lines, with a 95% credible interval narrower than 0.20.
2Probability by segment
- Dairy products7.3% [1.9–16.9%]13 studies
- Soft drinks, bottled water and juices17% [8–29%]26 studies
- Brewing, wine and spirits12% [4–26%]11 studies
- Bakery and pasta21% [10–35%]24 studies
- Meat, poultry and seafood9.9% [2.8–22.1%]9 studies
- Fruit and vegetable processing14% [5–31%]7 studies
- Grain and oilseed milling15% [4–32%]6 studies
- Sugar and confectionery12% [4–26%]9 studies
- Snacks, coffee, tea and other foods13% [4–29%]5 studies
- Animal feed and pet food7.9% [1.9–19.3%]7 studies
- Food manufacturing (unspecified or mixed)10% [3–23%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThis bucket groups heterogeneous stoppage and loss reasons that operators or analysts log under generic residual labels such as other, general, trial, or shift end rather than a specific technical root cause. The underlying events are physically unrelated (minor jams, broken parts, product defects, meal or shift breaks, external utility faults) and are merged only because the original reporting system lacked a finer category for them.
How it looks in SCADA data
Engineering guidanceIn SCADA or MES loss logs this appears as a residual or other code accumulating counts and durations with no consistent correlation to a specific machine state, alarm, or sensor signal. The entries show irregular, non-repeating patterns across shifts and lines, unlike equipment-specific stop codes which cluster around a fixed asset or alarm tag.
Countermeasure
Engineering guidanceReview and refine the loss reporting taxonomy with operators and reliability engineers so that events currently logged as other or general are reassigned to specific equipment, defect, or organizational causes. Introduce mandatory free-text or structured sub-reason fields at the point of data entry to reduce the size of the residual category over time.
4Sources
- Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT (2022)Open sourceLost time: 0.730 menit · as reported: “QC IQF”
Show verbatim quote
QC IQF 0,73 ✔ NNVA
- Analysis of Packaging Machine Effectiveness with Overall Equipment Effectiveness and Six Big Losses : Analisis Efektivitas Mesin Packaging Menggunakan Metode Overall Equipment Effectiveness dan Six Big Losses (2025)Open sourceLost time: 272 menit · as reported: “Down time”
Show verbatim quote
9–13 Sep 2024 2100 37 87 272
- Analysis of Packaging Machine Effectiveness with Overall Equipment Effectiveness and Six Big Losses : Analisis Efektivitas Mesin Packaging Menggunakan Metode Overall Equipment Effectiveness dan Six Big Losses (2025)Open sourceLost time: 306 menit · as reported: “Down time”
Show verbatim quote
19–23 Sep 2024 2100 39 86 306
- Analysis of Packaging Machine Effectiveness with Overall Equipment Effectiveness and Six Big Losses : Analisis Efektivitas Mesin Packaging Menggunakan Metode Overall Equipment Effectiveness dan Six Big Losses (2025)Open sourceLost time: 269 menit · as reported: “Down time”
Show verbatim quote
1–5 Okt 2024 2100 43 76 269
- Analysis of Packaging Machine Effectiveness with Overall Equipment Effectiveness and Six Big Losses : Analisis Efektivitas Mesin Packaging Menggunakan Metode Overall Equipment Effectiveness dan Six Big Losses (2025)Open sourceLost time: 263 menit · as reported: “Down time”
Show verbatim quote
21–25 Okt 2024 2100 58 76 263
- Applying Lean Manufacturing tools to minimize waste in a mass consumption food company (2022)Open sourceShare of lost time: 35.0 % · as reported: “downtime”
Show verbatim quote
For the downtime that generates 35% of the waste in the production of type D biscuits, the TPM tool will be used since these downtimes are reflected in machine breakdowns, unplanned stops and minor stoppages.
- Enhancing operational efficiency in craft beer production: implementation of lean manufacturing and TPM methodologies in SMES (2025)Open sourceLost time: 74.0 min · as reported: “Downtime of the process”
Show verbatim quote
Process downtime decreased from 74 to 22.75 minutes, a 69% reduction.
- Enhancing operational efficiency in craft beer production: implementation of lean manufacturing and TPM methodologies in SMES (2025)Open sourceLost time: 22.8 min · as reported: “Downtime of the process”
Show verbatim quote
Process downtime decreased from 74 to 22.75 minutes, a 69% reduction.
- Investigation on a multiscale sustainable manufacturing approach to production changeover complexity reduction and its implementation through smart surfaces and process optimization (2022)Open sourceLost time: 1.00 min · as reported: “Trial”
Show verbatim quote
Trial 1 0 1
- Investigation on a multiscale sustainable manufacturing approach to production changeover complexity reduction and its implementation through smart surfaces and process optimization (2022)Open sourceLost time: 297 min · as reported: “Plant total down time”
Show verbatim quote
Plant total down time 155 142 297
- Number of events: 161 events · as reported: “Diğer”
Show verbatim quote
Arıza Sayısına Göre Pareto Diyagramı 105 44 37 25 23 17 15 161 0 50 100 150 200 3 6 5 1 2 4 7 8
- Lost time: 10,768 min · as reported: “Diğer”
Show verbatim quote
Arıza Süresine Göre Pareto Diyagramı 4727 2495 2249 2246 1408 943 638 10768 0 2000 4000 6000 8000 10000 12000 3 5 1 6 2 7 4 8
- Usulan Penurunan Tingkat Kecacatan Produk Sosis Ayam di PT Charoen Pokphand Indonesia (2015)Open sourceDefect rate: 0.0400 % · as reported: “fungus”
Show verbatim quote
Chicken sausages have several types of defects like wrinkled (0,9%), fungus (0,04%), and reject cooking (0,34%).
- Usulan Penurunan Tingkat Kecacatan Produk Sosis Ayam di PT Charoen Pokphand Indonesia (2015)Open sourceDefect rate: 0.900 % · as reported: “wrinkled”
Show verbatim quote
Chicken sausages have several types of defects like wrinkled (0,9%), fungus (0,04%), and reject cooking (0,34%).
- Share of lost time: 34.0 % · as reported: “Outros”
Show verbatim quote
verificou-se que as paradas do equipamento Klockner representa 30% de todos estes desperdício e que 36 % estão relacionadas com set ups e 34% são relativas a outro problemas.
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 14,174 menit · as reported: “Total Downtime”
Show verbatim quote
Juli 1.025 8.963 14.174
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 16,715 menit · as reported: “Total Downtime”
Show verbatim quote
Agustus 1.120 6.057 16.715
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 9,943 menit · as reported: “Total Downtime”
Show verbatim quote
September 1.768 12.412 9.943
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 15,131 menit · as reported: “Total Downtime”
Show verbatim quote
Oktober 1.687 8.213 15.131
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 9,670 menit · as reported: “Total Downtime”
Show verbatim quote
November 788 12.512 9.670
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 9,307 menit · as reported: “Total Downtime”
Show verbatim quote
Desember 986 9.274 9.307
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 929 menit · as reported: “Total Downtime”
Show verbatim quote
Januari 1.278 13.731 929
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 1,098 menit · as reported: “Total Downtime”
Show verbatim quote
Februari 2.051 10.424 1.098
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 1,707 menit · as reported: “Total Downtime”
Show verbatim quote
Maret 1.957 14.278 1.707
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 5,376 menit · as reported: “Total Downtime”
Show verbatim quote
April 1.599 8.680 5.376
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 4,452 menit · as reported: “Total Downtime”
Show verbatim quote
Mei 980 6.341 4.452
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 6,164 menit · as reported: “Total Downtime”
Show verbatim quote
Juni 992 2.171 6.164
- Share of lost time: 30.9 % · as reported: “Geral”
Show verbatim quote
Geral 30,9%
- Share of lost time: 48.0 % · as reported: “dez principais paradas”
Show verbatim quote
representam cerca de 48% do total de tempo perdido e as demais foram agrupadas
- Number of events: 5.00 events · as reported: “Trancou uma Gaiola”
Show verbatim quote
Trancou uma Gaiola 5
- Number of events: 4.00 events · as reported: “Troca de bicos”
Show verbatim quote
Troca de bicos 4
- Share of lost time: 57.0 % · as reported: “Micro downtime”
Show verbatim quote
with an average of 57%, the principal cause is micro downtime. This means that the 57% of the line inefficiency (in terms of minutes of production lost) is caused by micro downtimes.
- Micro downtime: Data collection, analysis and impact on OEE in bottling lines the San Benedetto case study (2018)Open sourceShare of lost time: 57.0 % · as reported: “micro downtime”
Show verbatim quote
Micro downtime (downtime lower than 15 minutes) covers 57 percent of inefficiency.
- Share of lost time: 16.8 % · as reported: “Paragens”
Show verbatim quote
2009 50,62% 16,80% 32,60% 52,34% 18,85% 27,13%
- Defect rate: 32.6 % · as reported: “Quebras”
Show verbatim quote
2009 50,62% 16,80% 32,60% 52,34% 18,85% 27,13%
- Share of lost time: 13.6 % · as reported: “Paragens”
Show verbatim quote
Jan-2010 59,83% 13,58% 29,32% 55,19% 16,13% 28,38%
- Defect rate: 29.3 % · as reported: “Quebras”
Show verbatim quote
Jan-2010 59,83% 13,58% 29,32% 55,19% 16,13% 28,38%
- Share of lost time: 18.9 % · as reported: “Paragens”
Show verbatim quote
2009 50,62% 16,80% 32,60% 52,34% 18,85% 27,13%
- Defect rate: 27.1 % · as reported: “Quebras”
Show verbatim quote
2009 50,62% 16,80% 32,60% 52,34% 18,85% 27,13%
- Share of lost time: 16.1 % · as reported: “Paragens”
Show verbatim quote
Jan-2010 59,83% 13,58% 29,32% 55,19% 16,13% 28,38%
- Defect rate: 28.4 % · as reported: “Quebras”
Show verbatim quote
Jan-2010 59,83% 13,58% 29,32% 55,19% 16,13% 28,38%
- Lost time: 22.0 min · as reported: “paradas não planejadas”
Show verbatim quote
µ 1 = (TPP – TPnP)/TPP µ 1 = (360 - 22) / 360 µ 1 = 93,88 %
- Lost time: 45.0 min · as reported: “paradas não planejadas”
Show verbatim quote
µ 1 = (TPP – TPnP)/TPP µ 1 = (360 - 45) / 360 µ 1 = 87,50 %
- Lost time: 37.0 min · as reported: “paradas não planejadas”
Show verbatim quote
µ 1 = (TPP – TPnP)/TPP µ 1 = (360 - 37) / 360 µ 1 = 89,72 %
- Penerapan Metode Total Productive Maintenance untuk Mereduksi Downtime pada Lini Produksi Botol 1 di PT. Grahamas Intitirta (2020)Open sourceLost time: 394 hours · as reported: “downtime”
Show verbatim quote
This can reduce Filling 1 downtime from 393.78 hours to 67.62 hours and Blowing 1 from 91.35 hours to 14.75 hours.
- Lost time: 108 h · as reported: “setup losses”
Show verbatim quote
Considering the same period of time analysed, the setup losses constitute 107.5 hours and the setting losses approximately 93.2 hours.
- Lost time: 93.2 h · as reported: “setting losses”
Show verbatim quote
Considering the same period of time analysed, the setup losses constitute 107.5 hours and the setting losses approximately 93.2 hours.
- Specific energy: 275 Wh/1000 Bottles · as reported: “Total”
Show verbatim quote
Total 4694.0 274.8 621.2
- Lost time: 0 Sec/shift · as reported: “Labor”
Show verbatim quote
Average wasted time Per Shift (Sec/shift) 0 - 152 116
- Lost time: 1,712 Sec/shift · as reported: “Labor”
Show verbatim quote
Average wasted time Per Shift (Sec/shift) 1712
- Peningkatan Efektivitas Mesin Susu Kental Manis dengan Metode Overall Equipment Effectiveness dan Diagram Ishikawa (2021)Open sourceLost time: 98.7 jam · as reported: “Planned downtime”
Show verbatim quote
Planned downtime = 98.7 jam
- Pengukuran Efektifitas Mesin Chenyueh menggunakan Pendekatan Overall Equipment Effectiveness (OEE) dan Six Big Losses pada CV. AABI Surabaya (2022)Open sourceShare of lost time: 58.0 % · as reported: “downtime loss”
Show verbatim quote
faktor yang memberikan kontribusi terbesar dalam penurunan efektifitas mesin chenyueh adalah downtime loss yang memiliki presentase sebesar 58%
- Production Model Based on Lean Manufacturing, MRP, MPS and TPM to Reduce Losses in a MSE in the Bakery Sector (2023)Open sourceShare of lost time: 35.3 % · as reported: “Downtime rate”
Show verbatim quote
The downtime rate: This decreased from 35.26% to 10%, using the 5S methodology, this was reduced thanks to the implementation of cleanliness and order in the plant
- Production Model Based on Lean Manufacturing, MRP, MPS and TPM to Reduce Losses in a MSE in the Bakery Sector (2023)Open sourceShare of lost time: 10.0 % · as reported: “Downtime rate”
Show verbatim quote
The downtime rate: This decreased from 35.26% to 10%, using the 5S methodology, this was reduced thanks to the implementation of cleanliness and order in the plant
- Application of mixed methodologies to increase the productivity of an agro-industrial company (2023)Open sourceLost time: 2.14 hours per day · as reported: “downtime”
Show verbatim quote
an average downtime of 2.14 hours per day would give us a total cost of USD 161,784.00 per campaign generated by downtime alone.
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 1.00 min · as reported: “Accident”
Show verbatim quote
Accident 0 0 0 1 0 0 0 0 0 2 0 0
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 2.00 min · as reported: “Accident”
Show verbatim quote
Accident 0 0 0 1 0 0 0 0 0 2 0 0
- Enhancing Operational Efficiency in Craft Beer Production: Implementation of Lean Manufacturing and TPM Methodologies in SMEs (2024)Open sourceLost time: 74.0 min · as reported: “downtime of the process”
Show verbatim quote
Process downtime decreased from 74 to 22.75 minutes, a 69% reduction.
- Enhancing Operational Efficiency in Craft Beer Production: Implementation of Lean Manufacturing and TPM Methodologies in SMEs (2024)Open sourceLost time: 22.8 min · as reported: “downtime of the process”
Show verbatim quote
Process downtime decreased from 74 to 22.75 minutes, a 69% reduction.
- The implementation of an integrated Lean Management-HACCP model: application in the food industry in Casablanca,Morocco (2025)Open sourceLost time: 60.0 min · as reported: “Touch-ups”
Show verbatim quote
the time of touch-ups to 60 minutes
- The implementation of an integrated Lean Management-HACCP model: application in the food industry in Casablanca,Morocco (2025)Open sourceLost time: 90.0 min · as reported: “Touch-ups”
Show verbatim quote
Touch-ups 90 min
- The implementation of an integrated Lean Management-HACCP model: application in the food industry in Casablanca,Morocco (2025)Open sourceLost time: 30.0 min · as reported: “Meals”
Show verbatim quote
Meals 30 min
- A Lean Manufacturing Case Study: Enhancing Efficiency and Reducing Waste in Latin American Food Production (2024)Open sourceShare of lost time: 20.0 % · as reported: “elevated unproductive times”
Show verbatim quote
At the first level, three main reasons were identified: a high rate of decline (55%), a high rate of defective products (25%), and elevated unproductive times (20%).
- Lean-TPM Production Model for Efficiency and Quality Enhancement in the Brewing Industry: Insights from a Peruvian Case Study (2025)Open sourceLost time: 21.0 min · as reported: “downtime”
Show verbatim quote
Likewise, downtime decreased by 72%, dropping from 74 to 21 minutes, demonstrating greater operational availability of the equipment.
- Lean-TPM Production Model for Efficiency and Quality Enhancement in the Brewing Industry: Insights from a Peruvian Case Study (2025)Open sourceLost time: 74.0 min · as reported: “downtime”
Show verbatim quote
Likewise, downtime decreased by 72%, dropping from 74 to 21 minutes, demonstrating greater operational availability of the equipment.
- ANALISIS EFEKTIVITAS MESIN PRODUKSI GULA UNTUK MINIMALISASI PEMBOROSAN PADA PABRIK GULA PANDJIE SITUBONDO (2025)Open sourceLost time: 110 menit · as reported: “Non Productive Time”
Show verbatim quote
2017 967,20 1.550,40 469,20 25,20 0,00 109,80
- ANALISIS EFEKTIVITAS MESIN PRODUKSI GULA UNTUK MINIMALISASI PEMBOROSAN PADA PABRIK GULA PANDJIE SITUBONDO (2025)Open sourceLost time: 76.2 menit · as reported: “Non Productive Time”
Show verbatim quote
2018 3.553,20 916,80 6.285,00 271,20 37,80 76,20
- ANALISIS EFEKTIVITAS MESIN PRODUKSI GULA UNTUK MINIMALISASI PEMBOROSAN PADA PABRIK GULA PANDJIE SITUBONDO (2025)Open sourceLost time: 215 menit · as reported: “Non Productive Time”
Show verbatim quote
2019 3.949,80 96,00 234,00 40,20 0,00 214,80
- ANALISIS EFEKTIVITAS MESIN PRODUKSI GULA UNTUK MINIMALISASI PEMBOROSAN PADA PABRIK GULA PANDJIE SITUBONDO (2025)Open sourceLost time: 390 menit · as reported: “Non Productive Time”
Show verbatim quote
2020 1.045,80 54,00 0,00 217,20 0,00 390,00
- ANALISIS EFEKTIVITAS MESIN PRODUKSI GULA UNTUK MINIMALISASI PEMBOROSAN PADA PABRIK GULA PANDJIE SITUBONDO (2025)Open sourceLost time: 2,172 menit · as reported: “Non Productive Time”
Show verbatim quote
2021 1.281,00 0,00 1.096,80 0,00 0,00 2.172,00
- Reliability-Centered Maintenance Model to Improve OEE in a Mass-Consumption Food Company: A Case Study from Peru (2025)Open sourceShare of lost time: 23.5 % · as reported: “Failure Downtime Rate”
Show verbatim quote
Failure Downtime Rate % 23.53% 12% 13.86% -41.10%
- Reliability-Centered Maintenance Model to Improve OEE in a Mass-Consumption Food Company: A Case Study from Peru (2025)Open sourceShare of lost time: 13.9 % · as reported: “Failure Downtime Rate”
Show verbatim quote
Failure Downtime Rate % 23.53% 12% 13.86% -41.10%
- Analisis Efektivitas Total Productive Maintenance (TPM) Dengan Menggunakan Metode Overall Equipment Effectiveness pada Mesin Hidrolik di SMK SMTI Makassar (2025)Open sourceShare of lost time: 34.8 % · as reported: “total kerugian produksi (six big losses)”
Show verbatim quote
Analisis Six Big Losses mengidentifikasi bahwa total kerugian produksi mencapai 34,80%, dengan penyebab dominan berupa reduced speed losses sebesar 24,67%.
- Lost time: 60.0 menit · as reported: “Downtime mesin”
Show verbatim quote
Downtime mesin: 1 jam (60 menit).
- Innovation in Smart Maintenance: An IoT-Based Strategy to Improve Packaging Machine Availability in a SME (2025)Open sourceShare of planned time: 21.5 % · as reported: “unplanned downtime”
Show verbatim quote
High rate of unplanned downtime 21.49% 6.63% 8.45%
- Innovation in Smart Maintenance: An IoT-Based Strategy to Improve Packaging Machine Availability in a SME (2025)Open sourceLost time: 445 h · as reported: “unplanned downtime”
Show verbatim quote
unplanned downtime was reduced by 68.68%, from 445 hours to 139.4 hours, due to the incorporation of scheduled downtime for the execution of periodic maintenance activities
- Share of lost time: 10.0 % · as reported: “machine downtime”
Show verbatim quote
60% of work time produced results but 30% was lost because materials needed to wait for 40% of the time and 10% stemmed from machine downtime where 50% resulted from equipment mechanical issues.
- Share of planned time: 10.0 % · as reported: “machine downtime”
Show verbatim quote
10% stemmed from machine downtime
- Optimalisasi Maintenance Sebagai Upaya Meningkatkan Nilai Overall Performance Indicator (OPI) dengan Metode Kaizen pada PT. XYZ (2025)Open sourceLost time: 131 jam · as reported: “Total Downtime”
Show verbatim quote
1 Okt-23 3,83 14,88 112,65 131,36
- Optimalisasi Maintenance Sebagai Upaya Meningkatkan Nilai Overall Performance Indicator (OPI) dengan Metode Kaizen pada PT. XYZ (2025)Open sourceLost time: 126 jam · as reported: “Total Downtime”
Show verbatim quote
2 Nov-23 3,88 6,68 115,68 126,24
- Optimalisasi Maintenance Sebagai Upaya Meningkatkan Nilai Overall Performance Indicator (OPI) dengan Metode Kaizen pada PT. XYZ (2025)Open sourceLost time: 94.0 jam · as reported: “Total Downtime”
Show verbatim quote
3 Des-23 4,93 18,68 70,42 94,03
- Optimalisasi Maintenance Sebagai Upaya Meningkatkan Nilai Overall Performance Indicator (OPI) dengan Metode Kaizen pada PT. XYZ (2025)Open sourceLost time: 113 jam · as reported: “Total Downtime”
Show verbatim quote
4 Jan-24 5,77 20,07 87,25 113,09
- Optimalisasi Maintenance Sebagai Upaya Meningkatkan Nilai Overall Performance Indicator (OPI) dengan Metode Kaizen pada PT. XYZ (2025)Open sourceLost time: 108 jam · as reported: “Total Downtime”
Show verbatim quote
5 Feb-24 2,33 30,23 75,26 107,82
- Lost time: 30.0 min · as reported: “bad pieces”
Show verbatim quote
-Lost time doing bad pieces: 30 minutes
- Propuesta de mejora para incrementar el rendimiento de la línea de salsas usando SMED, Kanban, Industria 4.0 y 5S en una empresa del sector alimenticio (2026)Open sourceShare of lost time: 1.25 % · as reported: “Otros”
Show verbatim quote
Otros 289.87 1.25% 100.00%
- Propuesta de mejora para incrementar el rendimiento de la línea de salsas usando SMED, Kanban, Industria 4.0 y 5S en una empresa del sector alimenticio (2026)Open sourceLost time: 290 min · as reported: “Otros”
Show verbatim quote
Otros 289.87 1.25% 100.00%
- Waste Management and Operational Efficiency Improvement in Cake and Pastry Factory Through Adapting DMAIC Methodology (2026)Open sourceLost time: 106 h · as reported: “downtime”
Show verbatim quote
total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units.
- Waste Management and Operational Efficiency Improvement in Cake and Pastry Factory Through Adapting DMAIC Methodology (2026)Open sourceLost time: 244 h · as reported: “downtime”
Show verbatim quote
total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units.
- Waste Management and Operational Efficiency Improvement in Cake and Pastry Factory Through Adapting DMAIC Methodology (2026)Open sourceShare of planned time: 13.5 % · as reported: “non-productive activities”
Show verbatim quote
Based on January 2025 performance, 86.5% of planned production time was used effectively, while 13.5% was lost to non-productive activities, including setup, changeover, machine downtime, and maintenance.
- Analisis Pengendalian Kualitas Produk Roti untuk Menurunkan Reject Rate Menggunakan Metode DMAIC dan Poka Yoke (Studi Kasus: Toko Roti Tous Les Jours) (2026)Open sourceShare of loss events: 37.0 % · as reported: “Donut”
Show verbatim quote
65% dari permasalahan cacat produk penyebab utamanya adalah kategori produk yaitu donut 37%) dan regular bread 29%.
- Analisis Pengendalian Kualitas Produk Roti untuk Menurunkan Reject Rate Menggunakan Metode DMAIC dan Poka Yoke (Studi Kasus: Toko Roti Tous Les Jours) (2026)Open sourceNumber of events: 2,341 pcs · as reported: “Donut”
Show verbatim quote
Jumlah 133.573 1.822 918 2.341 607 695 6.383
- Analisis Pengendalian Kualitas Produk Roti untuk Menurunkan Reject Rate Menggunakan Metode DMAIC dan Poka Yoke (Studi Kasus: Toko Roti Tous Les Jours) (2026)Open sourceNumber of events: 695 pcs · as reported: “Pastry”
Show verbatim quote
Jumlah 133.573 1.822 918 2.341 607 695 6.383
- Share of lost time: 15.3 % · as reported: “paradas programadas”
Show verbatim quote
las paradas programadas (15.31%) atribuidas al mantenimiento de equipos, limpieza de la línea y los refrigerios del personal
- Share of lost time: 15.1 % · as reported: “paradas rutinarias”
Show verbatim quote
las paradas rutinarias (15.14%) asociadas a los cambios de formato de las diferentes presentaciones del Plan de producción
- Share of lost time: 7.63 % · as reported: “paradas organizacionales”
Show verbatim quote
las paradas organizacionales (7.63%) por algún evento fuera del control de la empresa (un movimiento sísmico) o el incumplimiento en el servicio asignado a alguna de las empresas subcontratados
- Lost time: 7,122 min · as reported: “paradas rutinarias (formato 3030 ml)”
Show verbatim quote
Respecto a las paradas rutinarias del formato 3030 ml de la línea PET estas totalizaron 7,122 en el año 2023.
- Розроблення заходів операційного вдосконалення виробничих процесів виготовлення вермішелі швидкого приготування “Reeva зі смаком гострої курки” для оператора ринку ТОВ «Евро Фуд Сервіс» (2025)Open sourceLost time: 419 h · as reported: “непередбачені зупинки, спричинені порушеннями у зовнішньому енергозабезпеченні або збоями окремих вузлів обладнання”
Show verbatim quote
Водночас додатково зафіксовано 419 годин непередбачених зупинок, спричинених порушеннями у зовнішньому енергозабезпеченні або збоями окремих вузлів обладнання.
- Розроблення заходів операційного вдосконалення виробничих процесів виготовлення вермішелі швидкого приготування “Reeva зі смаком гострої курки” для оператора ринку ТОВ «Евро Фуд Сервіс» (2025)Open sourceLost time: 416 h · as reported: “регламентовані зупинки для мийки та сервісного обслуговування”
Show verbatim quote
Плановий виробничий час підприємства у 2024 році становив 8224 години, з яких 416 годин було виділено на регламентовані зупинки для мийки та сервісного обслуговування, що відбувається щотижня.
- Lost time: 1,088 min · as reported: “Operational losses”
Show verbatim quote
Operational losses (min) 278 494 106 53 157 1088 48
- Share of lost time: 48.0 % · as reported: “Operational losses”
Show verbatim quote
Operational losses (min) 278 494 106 53 157 1088 48
- Lost time: 1,015 min · as reported: “Equipment losses”
Show verbatim quote
Equipment losses (min) 420 364 24 55 152 1015 44.8
- Share of lost time: 44.8 % · as reported: “Equipment losses”
Show verbatim quote
Equipment losses (min) 420 364 24 55 152 1015 44.8
- Lost time: 2,263 min · as reported: “Total Losses”
Show verbatim quote
Total Losses(min) 698 1018 130 108 309 2263
- Lost time: 1,018 min · as reported: “Total Losses”
Show verbatim quote
Total Losses(min) 698 1018 130 108 309 2263
- Share of lost time: 45.0 % · as reported: “Total Losses”
Show verbatim quote
% of Losses 30.8 45 5.8 4.8 13.7
- Lost time: 3.00 min · as reported: “Desentupir canos”
Show verbatim quote
Desentupir canos 2 24 21,96 € 3
- Number of events: 2.00 events · as reported: “Desentupir canos”
Show verbatim quote
Desentupir canos 2 24 21,96 € 3
- Lost time: 17.0 min · as reported: “Arame partido”
Show verbatim quote
Arame partido 4 82 120,73 € 17
- Number of events: 4.00 events · as reported: “Arame partido”
Show verbatim quote
Arame partido 4 82 120,73 € 17
- Lost time: 8.00 min · as reported: “Fim de turno”
Show verbatim quote
Fim de turno 1 80 64,26 € 8
- Number of events: 1.00 events · as reported: “Fim de turno”
Show verbatim quote
Fim de turno 1 80 64,26 € 8
- Lost time: 1.00 min · as reported: “Fim turno”
Show verbatim quote
Fim turno 1 3 3,78 € 1
- Number of events: 1.00 events · as reported: “Fim turno”
Show verbatim quote
Fim turno 1 3 3,78 € 1
- Determining Mocaf Production Quantity Using Sugeno's Fuzzy Model: Analyzing Slicing Machine Effectiveness and Raw Material Forecasting in SMEs (2025)Open sourceLost time: 180 Minutes · as reported: “Planned Downtime”
Show verbatim quote
Total 17507,14 2880 180,00 237 1,32 1,98 2700 2463
- Determining Mocaf Production Quantity Using Sugeno's Fuzzy Model: Analyzing Slicing Machine Effectiveness and Raw Material Forecasting in SMEs (2025)Open sourceLost time: 237 Minutes · as reported: “Unplanned Downtime”
Show verbatim quote
Total 17507,14 2880 180,00 237 1,32 1,98 2700 2463