Included study

Reliability and maintainability analysis to improve the operation of the limoncello production line

Open source

1Bibliographic record

Authors
Panagiotis Tsarouhas, Ioannis Sotirios Arvanitoyannis
Year
2012
Venue
International Journal of Food Science & Technology
Country
—
Segment
Brewing, wine and spirits
Process family
Filling and packaging line
Study type
Reliability analysis
Extraction scope
Abstract only
Size
1 plants · 1 lines · — machines
Observation period
240 days
Data collection
not_reported
Intervention
Show the setting as described by the study
The reliability, maintainability, failure rate and repair rate models of a limoncello automated production line for a period of 8 months at machine and entire line level were carried out.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Abstract)
the real operating time of the limoncello production line (LPL) is 89.35%, whereas for the rest 10.65%, the LPL is under repair
noneAvailability89.4 %Both extractors agreed
under repair
Show verbatim quote (Abstract)
whereas for the rest 10.65%, the LPL is under repair
Equipment failure (breakdowns)Share of lost time10.7 %Single extractor
—
Show verbatim quote (Summary)
whereas for the rest 10.65%, the LPL is under repair
Equipment failure (breakdowns)Share of planned time10.7 %Single extractor

Observation units

  • limoncello production line (LPL) · Whole line or unspecified equipment · Baseline