foratvise
Get Started
Equipment failure (breakdowns)

Equipment down under repair

Equipment failure (breakdowns)AvailabilityWhole line or unspecified equipment

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 56 % of the line's lost time. Reported by 2 of the 127 studies that could observe it (limited evidence).

What happens

A machine or line has failed and remains stopped while maintenance technicians diagnose and repair the fault; the duration of the stop depends on fault complexity, spare parts availability and technician response time rather than on the original failure itself. Extended repair durations occur when diagnosis is difficult, parts must be sourced, or multiple sub-systems are affected.

What is done about it

Apply structured root-cause diagnosis tools and maintain critical spare parts inventory to shorten repair cycles, and track mean time to repair by fault type to identify and address recurring bottlenecks in the repair process.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.8% [0.2–2.0%]
Expected share of lost time
0.4% [0.1–1.1%]
Share of lost time when present
56% [45–66%]
Studies / units
127 / 161
Evidence grade
C

Grade C: 2 to 4 studies, or an interval wider than 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.9% [0.1–2.9%]13 studies
  • Soft drinks, bottled water and juices
    1.1% [0.1–3.2%]26 studies
  • Brewing, wine and spirits
    1.3% [0.2–4.4%]11 studies
  • Bakery and pasta
    0.8% [0.1–2.5%]24 studies
  • Meat, poultry and seafood
    0.9% [0.1–3.2%]9 studies
  • Fruit and vegetable processing
    0.9% [0.1–3.2%]7 studies
  • Grain and oilseed milling
    0.9% [0.1–3.1%]6 studies
  • Sugar and confectionery
    0.9% [0.1–3.1%]9 studies
  • Snacks, coffee, tea and other foods
    0.9% [0.1–3.1%]5 studies
  • Animal feed and pet food
    0.9% [0.1–3.1%]7 studies
  • Food manufacturing (unspecified or mixed)
    0.9% [0.1–3.1%]10 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

A machine or line has failed and remains stopped while maintenance technicians diagnose and repair the fault; the duration of the stop depends on fault complexity, spare parts availability and technician response time rather than on the original failure itself. Extended repair durations occur when diagnosis is difficult, parts must be sourced, or multiple sub-systems are affected.

How it looks in SCADA data

Engineering guidance

SCADA/MES shows a sustained machine-down or fault state with no cycling of actuators, often tagged with a maintenance-call or work-order event; the stop duration counter extends well beyond typical fault-clear times, and upstream/downstream equipment shows blocking or starvation states for the same period.

Countermeasure

Engineering guidance

Apply structured root-cause diagnosis tools and maintain critical spare parts inventory to shorten repair cycles, and track mean time to repair by fault type to identify and address recurring bottlenecks in the repair process.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of lost time: 10.7 % · as reported: “under repair”
    Show verbatim quote
    whereas for the rest 10.65%, the LPL is under repair
  2. Share of lost time: 3.90 % · as reported: “down or under repair”
    Show verbatim quote
    the availability for the milk production line was 96.13% and the line was down or under repair for 3.9%
  3. Share of lost time: 34.0 % · as reported: “protracted repair durations”
    Show verbatim quote
    Detailed decomposition of the shortfall reveals that parasitic machine velocity losses exert a 47% share on ineffective output, protracted repair durations 34%, and the necessity for product reprocessing 19%.