Included study

Evaluation of maintenance management through the overall equipment effectiveness of a yogurt production line in a medium-sized Italian company

Open source

1Bibliographic record

Authors
Panagiotis Tsarouhas
Year
2015
Venue
International Journal of Productivity and Quality Management
Country
Italy
Segment
Dairy products
Process family
Fermentation
Study type
Single case study
Extraction scope
Abstract only
Size
1 plants · 1 lines · — machines
Observation period
900 days
Data collection
not_reported
Intervention
Show the setting as described by the study
The aim of this paper is to study the overall effectiveness equipment (OEE) as a metric for evaluating the progress of TPM of a yogurt production line in a medium-sized Italian company.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (abstract)
the availability of the production line is 97.32%, whereas the maintenance time ratio is 0.02746
noneAvailability97.3 %Both extractors agreed
—
Show verbatim quote (abstract)
the overall OEE performance of the line is 92.086% and therefore falls in word-class firms
noneOEE92.1 %Both extractors agreed
failure
Show verbatim quote (abstract)
in the production line there is a failure every 190 minutes that needs about five minutes to repair
Equipment failure (breakdowns)Time between events190 minBoth extractors agreed
—
Show verbatim quote (ABSTRACT)
whereas the maintenance time ratio is 0.02746
Planned downtime (scheduled maintenance, breaks, no demand)Share of planned time0.0275 ratioSingle extractor

Observation units

  • yogurt production line · Fermentation · Baseline
  • yogurt production line · Whole line or unspecified equipment · Baseline