Application of Lean Manufacturing Tools in the Food and Beverage Industries

Open source

1Bibliographic record

Authors
Rui Borges Lopes, Filipa Freitas, Inês Sousa
Year
2015
Venue
Journal of technology management & innovation
Country
Portugal
Segment
Food manufacturing (unspecified or mixed)
Process family
Filling and packaging line
Study type
Multiple case study
Extraction scope
Full text
Size
2 plants · 6 lines · 50 machines
Observation period
—
Data collection
manual_logs
Intervention
Show the setting as described by the study
The case studies concern two Portuguese companies, whose names will be dissimulated for confidentiality reasons, and occurred during 2013-2015.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
changeover
Show verbatim quote (page 7, Application of SMED (Company A))
Machines operating the line had, on average, 15 changeovers/month, each taking significant times.
Setup and adjustmentsNumber of events15.0 changeovers/monthSingle extractor
changeover
Show verbatim quote (page 8, Case study: Company B, application of SMED)
The number of machines in lines 1, 2, 3 and 4/5 was respectively 5, 10, 9 and 12, while changeovers per month in the same lines were on average 19, 28, 22 and 35.
Setup and adjustmentsNumber of events19.0 changeovers/monthSingle extractor
changeover
Show verbatim quote (page 8, Case study: Company B, application of SMED)
The number of machines in lines 1, 2, 3 and 4/5 was respectively 5, 10, 9 and 12, while changeovers per month in the same lines were on average 19, 28, 22 and 35.
Setup and adjustmentsNumber of events28.0 changeovers/monthSingle extractor
changeover
Show verbatim quote (page 8, Case study: Company B, application of SMED)
The number of machines in lines 1, 2, 3 and 4/5 was respectively 5, 10, 9 and 12, while changeovers per month in the same lines were on average 19, 28, 22 and 35.
Setup and adjustmentsNumber of events22.0 changeovers/monthSingle extractor
changeover
Show verbatim quote (page 8, Case study: Company B, application of SMED)
The number of machines in lines 1, 2, 3 and 4/5 was respectively 5, 10, 9 and 12, while changeovers per month in the same lines were on average 19, 28, 22 and 35.
Setup and adjustmentsNumber of events35.0 changeovers/monthSingle extractor

Observation units

  • Glass bottle filling line (Company A) · Whole line or unspecified equipment · Baseline
  • Line 1 (Company B) · Whole line or unspecified equipment · Baseline
  • Line 2 (Company B) · Whole line or unspecified equipment · Baseline
  • Line 3 (Company B) · Whole line or unspecified equipment · Baseline
  • Lines 4/5 (Company B) · Whole line or unspecified equipment · Baseline