Included study
Application of Lean Manufacturing Tools in the Food and Beverage Industries
1Bibliographic record
- Authors
- Rui Borges Lopes, Filipa Freitas, Inês Sousa
- Year
- 2015
- Venue
- Journal of technology management & innovation
- Country
- Portugal
- Segment
- Food manufacturing (unspecified or mixed)
- Process family
- Filling and packaging line
- Study type
- Multiple case study
- Extraction scope
- Full text
- Size
- 2 plants · 6 lines · 50 machines
- Observation period
- —
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
The case studies concern two Portuguese companies, whose names will be dissimulated for confidentiality reasons, and occurred during 2013-2015.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
changeoverShow verbatim quote (page 7, Application of SMED (Company A))Machines operating the line had, on average, 15 changeovers/month, each taking significant times. | Setup and adjustments | Number of events | 15.0 changeovers/month | Single extractor |
changeoverShow verbatim quote (page 8, Case study: Company B, application of SMED)The number of machines in lines 1, 2, 3 and 4/5 was respectively 5, 10, 9 and 12, while changeovers per month in the same lines were on average 19, 28, 22 and 35. | Setup and adjustments | Number of events | 19.0 changeovers/month | Single extractor |
changeoverShow verbatim quote (page 8, Case study: Company B, application of SMED)The number of machines in lines 1, 2, 3 and 4/5 was respectively 5, 10, 9 and 12, while changeovers per month in the same lines were on average 19, 28, 22 and 35. | Setup and adjustments | Number of events | 28.0 changeovers/month | Single extractor |
changeoverShow verbatim quote (page 8, Case study: Company B, application of SMED)The number of machines in lines 1, 2, 3 and 4/5 was respectively 5, 10, 9 and 12, while changeovers per month in the same lines were on average 19, 28, 22 and 35. | Setup and adjustments | Number of events | 22.0 changeovers/month | Single extractor |
changeoverShow verbatim quote (page 8, Case study: Company B, application of SMED)The number of machines in lines 1, 2, 3 and 4/5 was respectively 5, 10, 9 and 12, while changeovers per month in the same lines were on average 19, 28, 22 and 35. | Setup and adjustments | Number of events | 35.0 changeovers/month | Single extractor |
Observation units
- Glass bottle filling line (Company A) · Whole line or unspecified equipment · Baseline
- Line 1 (Company B) · Whole line or unspecified equipment · Baseline
- Line 2 (Company B) · Whole line or unspecified equipment · Baseline
- Line 3 (Company B) · Whole line or unspecified equipment · Baseline
- Lines 4/5 (Company B) · Whole line or unspecified equipment · Baseline

