foratvise
Get Started
Included study

The impact of Quality Maintenance Pillar of TPM on manufacturing performance

Open source

1Bibliographic record

Authors
Sachit Vardhan, Pardeep Gupta, Vaibhav Gangwar
Year
2015
Venue
International Conference on Industrial Engineering and Operations Management (IEOM)
Country
—
Segment
Snacks, coffee, tea and other foods
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Abstract only
Size
1 plants · — lines · — machines
Observation period
—
Data collection
not_reported
Intervention
Show the setting as described by the study
a food industry manufacturing potato chips

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 4High risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
leakage problems
Show verbatim quote (abstract)
leakage problems reduced from 1.20% to 0.27%
Process defects (scrap and rework)Defect rate0.270 %Both extractors agreed
leakage problems
Show verbatim quote (abstract)
leakage problems reduced from 1.20% to 0.27%
Process defects (scrap and rework)Defect rate1.20 %Both extractors agreed

Observation units

  • potato chips production line · Packaging (forming, sealing, wrapping, case packing, palletizing) · After intervention
  • potato chips production line · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline