Reduction and control of loss time in a process by preventive maintenance

Open source

1Bibliographic record

Authors
Wipas Jirapas, Jittra Rukijkanpanich
Year
2000
Venue
Chula Digiverse
Country
—
Segment
Snacks, coffee, tea and other foods
Process family
Whole plant or unspecified
Study type
Before/after intervention
Extraction scope
Abstract only
Size
1 plants · 1 lines · — machines
Observation period
600 days
Data collection
not_reported
Intervention
Show the setting as described by the study
the machine breakdown of critical machine in the fish snack production line

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 7High risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
machine breakdowncritical machine
Show verbatim quote (abstract)
the machine breakdown rate has been significantly decreased from 12 times per monthto 5 times per month
Equipment failure (breakdowns)Number of events5.00 times/monthBoth extractors agreed
machine breakdowncritical machine
Show verbatim quote (abstract)
the machine breakdown rate has been significantly decreased from 12 times per monthto 5 times per month
Equipment failure (breakdowns)Number of events12.0 times/monthBoth extractors agreed

Observation units

  • critical machine · Whole line or unspecified equipment · After intervention
  • critical machine · Whole line or unspecified equipment · Baseline