foratvise
Get Started
Equipment failure (breakdowns)

Unplanned equipment breakdown

Equipment failure (breakdowns)AvailabilityWhole line or unspecified equipment

In short

It appears in about 11 of every 100 lines studied.

When it appears, it takes on average about 56 % of the line's lost time. Reported by 30 of the 127 studies that could observe it (strong evidence).

What happens

A mechanical, electrical, pneumatic, hydraulic or control-system component on the line loses or degrades its function, forcing the machine to stop until a technician diagnoses and repairs the fault. The failure is unplanned and requires maintenance intervention rather than simple operator clearance.

What is done about it

Implement condition-based and preventive maintenance with monitoring of critical parameters to detect degradation before failure, maintain spare-parts availability for high-risk components, and apply root-cause failure analysis with corrective action tracking to reduce recurrence.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
11% [6–18%]
Expected share of lost time
6.3% [3.4–10.3%]
Share of lost time when present
56% [48–63%]
Studies / units
127 / 161
Evidence grade
A

Grade A: 10 or more studies and 10 or more distinct lines, with a 95% credible interval narrower than 0.20.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    15% [5–30%]13 studies
  • Soft drinks, bottled water and juices
    9.8% [3.8–18.4%]26 studies
  • Brewing, wine and spirits
    15% [5–31%]11 studies
  • Bakery and pasta
    19% [9–32%]24 studies
  • Meat, poultry and seafood
    13% [4–28%]9 studies
  • Fruit and vegetable processing
    9.3% [2.1–22.3%]7 studies
  • Grain and oilseed milling
    12% [4–27%]6 studies
  • Sugar and confectionery
    16% [5–33%]9 studies
  • Snacks, coffee, tea and other foods
    14% [4–32%]5 studies
  • Animal feed and pet food
    11% [3–24%]7 studies
  • Food manufacturing (unspecified or mixed)
    17% [6–35%]10 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

A mechanical, electrical, pneumatic, hydraulic or control-system component on the line loses or degrades its function, forcing the machine to stop until a technician diagnoses and repairs the fault. The failure is unplanned and requires maintenance intervention rather than simple operator clearance.

How it looks in SCADA data

Engineering guidance

SCADA/MES logs a long machine-down or fault state with a maintenance work order or breakdown code, often preceded by abnormal sensor trends (vibration, current, pressure) and followed by starvation or blocking alarms on upstream and downstream stations. Downtime counters accumulate against an unplanned-stop or breakdown category rather than a minor-stop code.

Countermeasure

Engineering guidance

Implement condition-based and preventive maintenance with monitoring of critical parameters to detect degradation before failure, maintain spare-parts availability for high-risk components, and apply root-cause failure analysis with corrective action tracking to reduce recurrence.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of planned time: 0.0993 % · as reported: “Breakdown Losses”
    Show verbatim quote
    Rata-Rata 0,099271 9,29814 30,74813 0,00000 0,00000 0,13414
  2. Share of lost time: 46.9 % · as reported: “process shutdowns due to machine failures”
    Show verbatim quote
    Among the main causes identified, errors in the conduct of operations accounted for 39.20%, reprocessing constituted 13.95%, and process shutdowns due to machine failures covered 46.85%.
  3. Lost time: 16.0 min · as reported: “Machine Issue”
    Show verbatim quote
    Machine Issue 11 5 16
  4. Share of loss events: 12.2 % · as reported: “Breakdowns in the Machinery”
    Show verbatim quote
    Breakdowns in the Machinery | 12.20% | 39.25%
  5. Lost time: 666 h · as reported: “Falla de máquina”
    Show verbatim quote
    Falla de máquina 666 666 67.7% 67.7%
  6. Share of lost time: 67.7 % · as reported: “Falla de máquina”
    Show verbatim quote
    Falla de máquina 666 666 67.7% 67.7%
  7. Lost time: 10.0 h · as reported: “Notificaciones tardías”
    Show verbatim quote
    Notificaciones tardías 10 951 1.0% 96.7%
  8. Share of lost time: 1.00 % · as reported: “Notificaciones tardías”
    Show verbatim quote
    Notificaciones tardías 10 951 1.0% 96.7%
  9. Number of events: 120 events · as reported: “breakdown”
    Show verbatim quote
    Dari hasil laporan bulan Desember 2012, terlihat bahwa frekuensi breakdown pada line 3 sebanyak 56 kali, line 4 sebanyak 40 kali, line 5 sebanyak 64 kali dan line 8 sebanyak 120 kali.
  10. Share of loss events: 53.5 % · as reported: “bread machine, cooling tower machine, and volumetric-divider machine failures”
    Show verbatim quote
    the 53.5% of all failures occurred at the bread machine, cooling tower machine, and volumetric-divider machine
  11. Share of lost time: 66.4 % · as reported: “set-up and failures”
    Show verbatim quote
    Analysis showed the distribution of the losses with set-up and failures being the predominant with 66.4% of total lost time, followed by defects participating with 19.9% and reduced speed and minor stoppage contributing with 13.7%.
  12. Speed ratio: 86.0 % · as reported: “equipment failures”
    Show verbatim quote
    We found that the efficiency of a typical line (the ratio of the effective processing rate to the nominal processing rate) was 86 percent because of equipment failures.
  13. Number of events: 5.00 times/month · as reported: “machine breakdown”
    Show verbatim quote
    the machine breakdown rate has been significantly decreased from 12 times per monthto 5 times per month
  14. Number of events: 12.0 times/month · as reported: “machine breakdown”
    Show verbatim quote
    the machine breakdown rate has been significantly decreased from 12 times per monthto 5 times per month
  15. Share of loss events: 70.0 % · as reported: “Klockner equipment failures”
    Show verbatim quote
    70% das paradas de linha estavam relacionadas a problemas no equipamento da Klockner, 16% por problemas de fornecimento de energia e 9% por problemas na máquina de injetora de tinta
  16. Lost time: 10,184 hours · as reported: “Planned stoppages”
    Show verbatim quote
    It is clear from the chart that the most important were planned stoppages with total time 10184 hours.
  17. Share of lost time: 61.0 % · as reported: “Planned stoppages”
    Show verbatim quote
    Plates fall into planned stoppages, accounting for 61% of all stoppages of the company.
  18. Number of events: 151 events · as reported: “breakdown (PM01)”
    Show verbatim quote
    Kejadian break down masih terjadi sejumlah 151 kejadian dengan durasi rata-rata 5,5 jam dalam periode tersebut.
  19. Mean event duration: 5.50 jam · as reported: “breakdown (PM01)”
    Show verbatim quote
    Kejadian break down masih terjadi sejumlah 151 kejadian dengan durasi rata-rata 5,5 jam dalam periode tersebut.
  20. Share of lost time: 9.49 % · as reported: “Breakdowns losses”
    Show verbatim quote
    Breakdowns losses 31,42 9,49 94,89
  21. Lost time: 31.4 jam · as reported: “Breakdowns losses”
    Show verbatim quote
    Breakdowns losses 31,42 9,49 94,89
  22. Share of lost time: 11.2 % · as reported: “kerusakan mesin”
    Show verbatim quote
    Downtime yang terjadi di PT XYZ selama 2014 sampai Oktober 2015 rata-rata per bulan sebesar 11,21% atau 43,05 jam.
  23. Lost time: 43.1 jam/bulan · as reported: “kerusakan mesin”
    Show verbatim quote
    Downtime yang terjadi di PT XYZ selama 2014 sampai Oktober 2015 rata-rata per bulan sebesar 11,21% atau 43,05 jam.
  24. Share of planned time: 25.0 % · as reported: “machine breakdowns”
    Show verbatim quote
    Changeovers consumed 536 hours (28%), while machine breakdowns totalled 485 hours (25%).
  25. Lost time: 485 h · as reported: “machine breakdowns”
    Show verbatim quote
    Changeovers consumed 536 hours (28%), while machine breakdowns totalled 485 hours (25%).
  26. Share of lost time: 0.0993 % · as reported: “Breakdown Losses”
    Show verbatim quote
    Rata-Rata 0,099271 9,29814 30,74813 0,00000 0,00000 0,13414
  27. Lost time: 117 h · as reported: “machine breakdown time”
    Show verbatim quote
    The loss in production in this year is (116.5 + 160) hour 4300bot/hour = 1,188,950 bottles which is 12.46% of the total product.
  28. Lost time: 160 h · as reported: “machine breakdown time”
    Show verbatim quote
    The loss in production in this year is (116.5 + 160) hour 4300bot/hour = 1,188,950 bottles which is 12.46% of the total product.
  29. Share of planned time: 12.5 % · as reported: “machine breakdown time”
    Show verbatim quote
    The loss in production in this year is (116.5 + 160) hour 4300bot/hour = 1,188,950 bottles which is 12.46% of the total product.
  30. Lost time: 590 min · as reported: “Equipment Failures”
    Show verbatim quote
    590 Equipment Failures
  31. Lost time: 14.0 h · as reported: “lost production time (late start-ups and work stoppages)”
    Show verbatim quote
    For a 26-week period prior to starting the project, a cumulative 14 hours of lost production time was observed.
  32. Share of lost time: 0.0480 % · as reported: “breakdown losses”
    Show verbatim quote
    Rata-rata kerugian yang terjadi pada setiap mesin yaitu breakdown losses 0,048%, setup and adjustment losses 0,159%, idle and minor stoppages 12,127%, dan reduced speed losses 11,749%.
  33. Lost time: 25,398 min · as reported: “Equipment Failures/Breakdown”
    Show verbatim quote
    Equipment Failures/Breakdown 25398 24.26 65.08
  34. Share of lost time: 24.3 % · as reported: “Equipment Failures/Breakdown”
    Show verbatim quote
    Equipment Failures/Breakdown 25398 24.26 65.08
  35. Share of loss events: 57.5 % · as reported: “bottling machine and heat exchanger/pasteuriser machine failures”
    Show verbatim quote
    both bottling machine and heat exchanger/pasteuriser machine had 57.5% of all the failures that presented on the production line
  36. Share of lost time: 48.0 % · as reported: “Machine failure”
    Show verbatim quote
    Machine failure: This indicator decreased from 48% to 15%, thanks to the implementation of the TPM, thanks to this the company was able to have better productivity.
  37. Share of lost time: 15.0 % · as reported: “Machine failure”
    Show verbatim quote
    Machine failure: This indicator decreased from 48% to 15%, thanks to the implementation of the TPM, thanks to this the company was able to have better productivity.
  38. Mean event duration: 7.14 h · as reported: “machine failure (repair time)”
    Show verbatim quote
    the machine repair time was calculated by the difference between the technician arrival time and his departure time after subtracting the machine emptying time, obtaining an MTTR of. 7.14 hours.
  39. Lost time: 12.1 h · as reported: “time of failures in machinery”
    Show verbatim quote
    it was possible that the time of failures in machinery was reduced from 12.09 hours to 4.50 hours, obtaining a reduction of 62.78%.
  40. Lost time: 20.8 min · as reported: “machine set-up (15 tasks to initialize the machine)”
    Show verbatim quote
    Currently the set-up is done by means of 15 tasks each time a shift is started to initialize the machine where the 15 times were considered individually and then once added up, the current set up time was obtained, i.e., 20.83 minutes.
  41. Lost time: 17,318 min · as reported: “Machine”
    Show verbatim quote
    Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
  42. Lost time: 18,216 min · as reported: “Machine”
    Show verbatim quote
    Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
  43. Lost time: 17,571 min · as reported: “Machine”
    Show verbatim quote
    Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
  44. Lost time: 21,811 min · as reported: “Machine”
    Show verbatim quote
    Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
  45. Lost time: 20,811 min · as reported: “Machine”
    Show verbatim quote
    Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
  46. Lost time: 15,516 min · as reported: “Machine”
    Show verbatim quote
    Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
  47. Lost time: 18,061 min · as reported: “Machine”
    Show verbatim quote
    Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
  48. Lost time: 18,691 min · as reported: “Machine”
    Show verbatim quote
    Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
  49. Lost time: 16,236 min · as reported: “Machine”
    Show verbatim quote
    Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
  50. Lost time: 15,852 min · as reported: “Machine”
    Show verbatim quote
    Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
  51. Lost time: 17,666 min · as reported: “Machine”
    Show verbatim quote
    Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
  52. Lost time: 18,584 min · as reported: “Machine”
    Show verbatim quote
    Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
  53. Share of planned time: 1.70 % · as reported: “Breakdown Losses”
    Show verbatim quote
    𝐵𝑟𝑒𝑎𝑘𝑑𝑜𝑤𝑛 𝐿𝑜𝑠𝑠𝑒𝑠= 1,704 %
  54. Share of loss events: 12.2 % · as reported: “Breakdowns in the Machinery”
    Show verbatim quote
    Breakdowns in the Machinery 12.20%
  55. Share of lost time: 46.9 % · as reported: “process shutdowns due to machine failures”
    Show verbatim quote
    errors in the conduct of operations accounted for 39.20%, reprocessing constituted 13.95%, and process shutdowns due to machine failures covered 46.85%.
  56. Lost time: 50.0 min · as reported: “Breakdowns”
    Show verbatim quote
    This implies a waste of 50 minutes.
  57. Number of events: 5.00 events · as reported: “Breakdowns”
    Show verbatim quote
    We can see how 5 machines break down with a 10 minute stoppage for every 8 hours worked.
  58. Mean event duration: 10.0 min · as reported: “Breakdowns”
    Show verbatim quote
    We can see how 5 machines break down with a 10 minute stoppage for every 8 hours worked.
  59. Number of events: 2.00 events · as reported: “Breakdowns”
    Show verbatim quote
    the breakdowns were reduced to 2 machines/8 hours
  60. Lost time: 120 s · as reported: “Karyawan menyiapkan wadah untuk ragi”
    Show verbatim quote
    Karywan dapat menempatkan wadah ragi pada stasiun pembuatan adonan untuk mempersingkat waktu yang waktu awalnya sebesar 240 detik menjadi 120 detik
  61. Lost time: 2.46 h/week · as reported: “unplanned stoppages”
    Show verbatim quote
    the total downtime due to unplanned stoppages was reduced from 3.79 hours to 2.46 hours per week, representing a reduction of 35.09%.
  62. Lost time: 3.79 h/week · as reported: “unplanned machine stoppages”
    Show verbatim quote
    The bottleneck analysis revealed that unplanned machine stoppages accounted for a total downtime of 3.79 hours per week, which had a direct impact on the overall production capacity and efficiency of the plant.
  63. Share of lost time: 46.0 % · as reported: “high machine shutdowns due to failure”
    Show verbatim quote
    At Level 2, the root causes of unproductive times were mainly attributed to high machine shutdowns due to failure (45.98%) and frequent setup stops (29.02%).
  64. Share of lost time: 49.2 % · as reported: “production line stoppages”
    Show verbatim quote
    The analysis revealed three main reasons contributing to this issue: production line stoppages accounted for 49.2% of the problem, followed by low operational performance with a contribution of 46.5%, and a smaller share of 4.3% attributed to defective products.
  65. Number of events: 9.00 events · as reported: “spur gear failure”
    Show verbatim quote
    December 26.4 9
  66. Mean event duration: 26.4 h · as reported: “spur gear failure”
    Show verbatim quote
    December 26.4 9
  67. Number of events: 4.00 events · as reported: “spur gear failure”
    Show verbatim quote
    October 11.2 4
  68. Mean event duration: 11.2 h · as reported: “spur gear failure”
    Show verbatim quote
    October 11.2 4
  69. Number of events: 7.00 events · as reported: “spur gear failure”
    Show verbatim quote
    January 14.8 7
  70. Mean event duration: 14.8 h · as reported: “spur gear failure”
    Show verbatim quote
    January 14.8 7
  71. Lost time: 2,008 h · as reported: “spur gear failure”
    Show verbatim quote
    Total 106 2007.5 10000
  72. Number of events: 11.0 events · as reported: “spur gear failure”
    Show verbatim quote
    September 16.7 11
  73. Mean event duration: 16.7 h · as reported: “spur gear failure”
    Show verbatim quote
    September 16.7 11
  74. Number of events: 13.0 events · as reported: “spur gear failure”
    Show verbatim quote
    November 21.1 13
  75. Mean event duration: 21.1 h · as reported: “spur gear failure”
    Show verbatim quote
    November 21.1 13
  76. Number of events: 10.0 events · as reported: “spur gear failure”
    Show verbatim quote
    February 17.1 10
  77. Mean event duration: 17.1 h · as reported: “spur gear failure”
    Show verbatim quote
    February 17.1 10
  78. Number of events: 8.00 events · as reported: “spur gear failure”
    Show verbatim quote
    March 14.6 8
  79. Mean event duration: 14.6 h · as reported: “spur gear failure”
    Show verbatim quote
    March 14.6 8
  80. Lost time: 184 h · as reported: “spur gear failure”
    Show verbatim quote
    September 16.7 11 183.7 1040 75.4
  81. Number of events: 12.0 events · as reported: “spur gear failure”
    Show verbatim quote
    August 17.8 12
  82. Mean event duration: 17.8 h · as reported: “spur gear failure”
    Show verbatim quote
    August 17.8 12
  83. Number of events: 5.00 events · as reported: “spur gear failure”
    Show verbatim quote
    July 15.3 5
  84. Mean event duration: 15.3 h · as reported: “spur gear failure”
    Show verbatim quote
    July 15.3 5
  85. Number of events: 6.00 events · as reported: “spur gear failure”
    Show verbatim quote
    June 18.6 6
  86. Mean event duration: 18.6 h · as reported: “spur gear failure”
    Show verbatim quote
    June 18.6 6
  87. Mean event duration: 18.0 h · as reported: “spur gear failure”
    Show verbatim quote
    April 18 5
  88. Lost time: 274 h · as reported: “spur gear failure”
    Show verbatim quote
    November 21.1 13 274.3 1230 91.5
  89. Lost time: 238 h · as reported: “spur gear failure”
    Show verbatim quote
    December 26.4 9 237.6 850 100
  90. Lost time: 214 h · as reported: “spur gear failure”
    Show verbatim quote
    August 17.8 12 213.6 1130 65
  91. Lost time: 104 h · as reported: “spur gear failure”
    Show verbatim quote
    January 14.8 7 103.6 660 6.6
  92. Number of events: 106 events · as reported: “spur gear failure”
    Show verbatim quote
    Total 106
  93. Lost time: 171 h · as reported: “spur gear failure”
    Show verbatim quote
    February 17.1 10 171 940 16
  94. Lost time: 44.8 h · as reported: “spur gear failure”
    Show verbatim quote
    October 11.2 4 44.8 380 79.2
  95. Lost time: 117 h · as reported: “spur gear failure”
    Show verbatim quote
    March 14.6 8 116.8 750 23.5
  96. Lost time: 112 h · as reported: “spur gear failure”
    Show verbatim quote
    June 18.6 6 111.6 570 49
  97. Lost time: 384 h · as reported: “spur gear failure”
    Show verbatim quote
    May 24 16 384 1510 43.3
  98. Lost time: 76.5 h · as reported: “spur gear failure”
    Show verbatim quote
    July 15.3 5 76.5 470 53.7
  99. Lost time: 90.0 h · as reported: “spur gear failure”
    Show verbatim quote
    April 18 5 90 470 28.2
  100. Share of loss events: 660 % · as reported: “spur gear failure”
    Show verbatim quote
    January 14.8 7 103.6 660 6.6
  101. Share of loss events: 940 % · as reported: “spur gear failure”
    Show verbatim quote
    February 17.1 10 171 940 16
  102. Share of loss events: 750 % · as reported: “spur gear failure”
    Show verbatim quote
    March 14.6 8 116.8 750 23.5
  103. Share of loss events: 470 % · as reported: “spur gear failure”
    Show verbatim quote
    April 18 5 90 470 28.2
  104. Share of loss events: 1,510 % · as reported: “spur gear failure”
    Show verbatim quote
    May 24 16 384 1510 43.3
  105. Share of loss events: 570 % · as reported: “spur gear failure”
    Show verbatim quote
    June 18.6 6 111.6 570 49
  106. Share of loss events: 1,130 % · as reported: “spur gear failure”
    Show verbatim quote
    August 17.8 12 213.6 1130 65
  107. Share of loss events: 1,040 % · as reported: “spur gear failure”
    Show verbatim quote
    September 16.7 11 183.7 1040 75.4
  108. Share of loss events: 380 % · as reported: “spur gear failure”
    Show verbatim quote
    October 11.2 4 44.8 380 79.2
  109. Share of loss events: 1,230 % · as reported: “spur gear failure”
    Show verbatim quote
    November 21.1 13 274.3 1230 91.5
  110. Share of loss events: 850 % · as reported: “spur gear failure”
    Show verbatim quote
    December 26.4 9 237.6 850 100
  111. Share of lost time: 29.8 % · as reported: “Averías mecánicas y de software”
    Show verbatim quote
    Averías mecánicas y de software 29.80% 8.42% 21.38%
  112. Share of lost time: 4.55 % · as reported: “Averías en las máquinas”
    Show verbatim quote
    Averías en las máquinas 1056.48 4.55% 90.13%
  113. Lost time: 1,056 min · as reported: “Averías en las máquinas”
    Show verbatim quote
    Averías en las máquinas 1056.48 4.55% 90.13%
  114. Lost time: 950 horas · as reported: “averías”
    Show verbatim quote
    podemos notar que el tiempo de averías es de 950.35 horas lo cual es mayor en comparación a las demás paradas como las de tipo rutinarias operacionales programada
  115. Share of planned time: 3.03 % · as reported: “breakdowns”
    Show verbatim quote
    Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist.
  116. Lost time: 205 h · as reported: “breakdowns”
    Show verbatim quote
    Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist.
  117. Number of events: 187 events · as reported: “breakdowns”
    Show verbatim quote
    Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist.
  118. Defect rate: 61.7 % · as reported: “breakdown waste”
    Show verbatim quote
    It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%.
  119. Number of events: 200 events · as reported: “breakdown events”
    Show verbatim quote
    Analysis of 200 breakdown events by shift (Day: 6 AM - 6 PM, Night: 6 PM - 6 AM), Figure 5 showed a higher concentration of incidents during the night shift, particularly in the late evening and early morning hours.
  120. Defect rate: 46.5 % · as reported: “depanning failures”
    Show verbatim quote
    The depanning failures, representing approximately 46.5% of production waste, were identified as the most significant contribution.
  121. Defect rate: 13.9 % · as reported: “topping and panning failures”
    Show verbatim quote
    Similarly, topping and panning failures (13.9% combined) occurred when dough balls were misaligned in pans or when glazing and sesame seeds were applied unsuccessfully.
  122. Share of lost time: 46.5 % · as reported: “depanning failures”
    Show verbatim quote
    The depanning failures, representing approximately 46.5% of production waste, were identified as the most significant contribution.
  123. Share of lost time: 13.9 % · as reported: “panning and topping failures”
    Show verbatim quote
    Similarly, topping and panning failures (13.9% combined) occurred when dough balls were misaligned in pans or when glazing and sesame seeds were applied unsuccessfully.
  124. Share of lost time: 13.7 % · as reported: “equipment failure rate”
    Show verbatim quote
    equipment failure rates declined from 13.67% to 4.59%
  125. Share of lost time: 3.33 % · as reported: “breakdown losses”
    Show verbatim quote
    Sementara itu, breakdown losses sebesar 3,33%, setup & adjustment losses sebesar 0,73%, dan process defect losses sebesar 2,5% tergolong rendah, sehingga tidak menjadi faktor dominan dalam penurunan kinerja mesin.
  126. Lost time: 3.00 jam · as reported: “Breakdown”
    Show verbatim quote
    1 05/01/2026 07/01/26 21,2 40 3,00 5,67 38660
  127. Lost time: 0.830 jam · as reported: “Breakdown”
    Show verbatim quote
    2 07/01/2026 09/01/26 21,2 40 0,83 4,67 42884
  128. Lost time: 2.25 jam · as reported: “Breakdown”
    Show verbatim quote
    3 12/01/2026 14/01/26 21,2 40 2,25 4,00 40930
  129. Lost time: 3.13 jam · as reported: “Breakdown”
    Show verbatim quote
    4 14/01/2026 16/01/26 21,2 40 3,13 5,52 39181
  130. Lost time: 0.670 jam · as reported: “Breakdown”
    Show verbatim quote
    5 19/01/2026 21/01/26 21,2 40 0,67 4,00 44438
  131. Lost time: 1.17 jam · as reported: “Breakdown”
    Show verbatim quote
    6 21/01/2026 23/01/26 21,2 40 1,17 3,65 42747
  132. Lost time: 0.420 jam · as reported: “Breakdown”
    Show verbatim quote
    7 26/01/2026 28/01/26 21,2 40 0,42 5,25 43266
  133. Lost time: 0.920 jam · as reported: “Breakdown”
    Show verbatim quote
    8 28/01/2026 30/01/26 21,2 40 0,92 5,50 42312
  134. Share of lost time: 35.4 % · as reported: “equipment breakdowns”
    Show verbatim quote
    Esta situación fue originada por cuatro causas raíz: averías en equipos (35.41%), elevados tiempos de setup (17.38%), producto final golpeado (32.69%) y etiquetado incorrecto (14.52%)
  135. Share of planned time: 18.0 % · as reported: “Breakdowns and Malfunctions Time (BMT)”
    Show verbatim quote
    Although breakdown and malfunction losses (18.04%) are greater in aggregate than changeover and ramp-up losses (≈7.2%), they are not the focus of this study.
  136. Share of lost time: 61.9 % · as reported: “inoperatividad de los equipos”
    Show verbatim quote
    Estas se debían a la inoperatividad de los equipos (61.93%) por fallas mecánicas y eléctricas del equipamiento que obligaban al reemplazo de repuestos
  137. Number of events: 33.0 events · as reported: “breakdown”
    Show verbatim quote
    The median number of breakdowns is 33, with an interquartile range between 26 (Q1) and 38 (Q3) occurrences.
  138. Mean event duration: 26.9 min · as reported: “breakdown”
    Show verbatim quote
    The median MTTR is 23.51 minutes, while the mean of 26.87 minutes indicates right skewness due to several high-duration repair events.
  139. Mean event duration: 23.5 min · as reported: “breakdown”
    Show verbatim quote
    The median MTTR is 23.51 minutes, while the mean of 26.87 minutes indicates right skewness due to several high-duration repair events.
  140. Lost time: 832 min · as reported: “breakdown”
    Show verbatim quote
    The median breakdown time is 747 minutes, while the mean of 831.7 minutes indicates a right-skewed distribution influenced by days with unusually high breakdown durations.
  141. Lost time: 747 min · as reported: “breakdown”
    Show verbatim quote
    The median breakdown time is 747 minutes, while the mean of 831.7 minutes indicates a right-skewed distribution influenced by days with unusually high breakdown durations.
  142. Lost time: 214 min · as reported: “breakdown”
    Show verbatim quote
    The minimum breakdown duration of 214 minutes represents highly stable operating days, whereas the maximum of 1,799 minutes highlights rare but severe downtime events.
  143. Lost time: 1,799 min · as reported: “breakdown”
    Show verbatim quote
    The minimum breakdown duration of 214 minutes represents highly stable operating days, whereas the maximum of 1,799 minutes highlights rare but severe downtime events.
  144. Mean event duration: 6.11 min · as reported: “breakdown”
    Show verbatim quote
    The minimum MTTR of 6.11 minutes corresponds to rapid corrective interventions, whereas the maximum value of 81.45 minutes represents infrequent but prolonged repairs.
  145. Mean event duration: 81.5 min · as reported: “breakdown”
    Show verbatim quote
    The minimum MTTR of 6.11 minutes corresponds to rapid corrective interventions, whereas the maximum value of 81.45 minutes represents infrequent but prolonged repairs.
  146. Number of events: 9.00 events · as reported: “breakdown”
    Show verbatim quote
    The minimum value of 9 occurrences reflects exceptionally stable days, while the maximum of 63 occurrences indicates periods of heightened equipment instability.
  147. Number of events: 63.0 events · as reported: “breakdown”
    Show verbatim quote
    The minimum value of 9 occurrences reflects exceptionally stable days, while the maximum of 63 occurrences indicates periods of heightened equipment instability.
  148. Lost time: 25.0 min · as reported: “Máquina 2”
    Show verbatim quote
    Máquina 2 4 168 145,59 € 25
  149. Number of events: 4.00 events · as reported: “Máquina 2”
    Show verbatim quote
    Máquina 2 4 168 145,59 € 25
  150. Lost time: 47.0 min · as reported: “Máquina 1”
    Show verbatim quote
    Máquina 1 7 390 450,65 € 47
  151. Number of events: 7.00 events · as reported: “Máquina 1”
    Show verbatim quote
    Máquina 1 7 390 450,65 € 47