Unplanned equipment breakdown
In short
It appears in about 11 of every 100 lines studied.
When it appears, it takes on average about 56 % of the line's lost time. Reported by 30 of the 127 studies that could observe it (strong evidence).
What happens
A mechanical, electrical, pneumatic, hydraulic or control-system component on the line loses or degrades its function, forcing the machine to stop until a technician diagnoses and repairs the fault. The failure is unplanned and requires maintenance intervention rather than simple operator clearance.
What is done about it
Implement condition-based and preventive maintenance with monitoring of critical parameters to detect degradation before failure, maintain spare-parts availability for high-risk components, and apply root-cause failure analysis with corrective action tracking to reduce recurrence.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 11% [6–18%]
- Expected share of lost time
- 6.3% [3.4–10.3%]
- Share of lost time when present
- 56% [48–63%]
- Studies / units
- 127 / 161
- Evidence grade
- A
Grade A: 10 or more studies and 10 or more distinct lines, with a 95% credible interval narrower than 0.20.
2Probability by segment
- Dairy products15% [5–30%]13 studies
- Soft drinks, bottled water and juices9.8% [3.8–18.4%]26 studies
- Brewing, wine and spirits15% [5–31%]11 studies
- Bakery and pasta19% [9–32%]24 studies
- Meat, poultry and seafood13% [4–28%]9 studies
- Fruit and vegetable processing9.3% [2.1–22.3%]7 studies
- Grain and oilseed milling12% [4–27%]6 studies
- Sugar and confectionery16% [5–33%]9 studies
- Snacks, coffee, tea and other foods14% [4–32%]5 studies
- Animal feed and pet food11% [3–24%]7 studies
- Food manufacturing (unspecified or mixed)17% [6–35%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceA mechanical, electrical, pneumatic, hydraulic or control-system component on the line loses or degrades its function, forcing the machine to stop until a technician diagnoses and repairs the fault. The failure is unplanned and requires maintenance intervention rather than simple operator clearance.
How it looks in SCADA data
Engineering guidanceSCADA/MES logs a long machine-down or fault state with a maintenance work order or breakdown code, often preceded by abnormal sensor trends (vibration, current, pressure) and followed by starvation or blocking alarms on upstream and downstream stations. Downtime counters accumulate against an unplanned-stop or breakdown category rather than a minor-stop code.
Countermeasure
Engineering guidanceImplement condition-based and preventive maintenance with monitoring of critical parameters to detect degradation before failure, maintain spare-parts availability for high-risk components, and apply root-cause failure analysis with corrective action tracking to reduce recurrence.
4Sources
- Analisis Efektivitas Mesin pada Divisi Pengalengan Jamur Di PT XYZ Menggunakan Metode Overall Equipment Effectiveness (2019)Open sourceShare of planned time: 0.0993 % · as reported: “Breakdown Losses”
Show verbatim quote
Rata-Rata 0,099271 9,29814 30,74813 0,00000 0,00000 0,13414
- Enhancing operational efficiency in craft beer production: implementation of lean manufacturing and TPM methodologies in SMES (2025)Open sourceShare of lost time: 46.9 % · as reported: “process shutdowns due to machine failures”
Show verbatim quote
Among the main causes identified, errors in the conduct of operations accounted for 39.20%, reprocessing constituted 13.95%, and process shutdowns due to machine failures covered 46.85%.
- Investigation on a multiscale sustainable manufacturing approach to production changeover complexity reduction and its implementation through smart surfaces and process optimization (2022)Open sourceLost time: 16.0 min · as reported: “Machine Issue”
Show verbatim quote
Machine Issue 11 5 16
- Enhancing Machinery Availability in a Food Company: An Integrated Approach Using TPM, SMED, and RCM Methodologies (2024)Open sourceShare of loss events: 12.2 % · as reported: “Breakdowns in the Machinery”
Show verbatim quote
Breakdowns in the Machinery | 12.20% | 39.25%
- Lost time: 666 h · as reported: “Falla de máquina”
Show verbatim quote
Falla de máquina 666 666 67.7% 67.7%
- Share of lost time: 67.7 % · as reported: “Falla de máquina”
Show verbatim quote
Falla de máquina 666 666 67.7% 67.7%
- Lost time: 10.0 h · as reported: “Notificaciones tardías”
Show verbatim quote
Notificaciones tardías 10 951 1.0% 96.7%
- Share of lost time: 1.00 % · as reported: “Notificaciones tardías”
Show verbatim quote
Notificaciones tardías 10 951 1.0% 96.7%
- PENGUKURAN NILAI OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN USULAN PERBAIKAN DENGAN METODE 5S PADA LINE 8 PT. COCA COLA BOTTLING INDONESIA CENTRAL JAVA (2014)Open sourceNumber of events: 120 events · as reported: “breakdown”
Show verbatim quote
Dari hasil laporan bulan Desember 2012, terlihat bahwa frekuensi breakdown pada line 3 sebanyak 56 kali, line 4 sebanyak 40 kali, line 5 sebanyak 64 kali dan line 8 sebanyak 120 kali.
- Share of loss events: 53.5 % · as reported: “bread machine, cooling tower machine, and volumetric-divider machine failures”
Show verbatim quote
the 53.5% of all failures occurred at the bread machine, cooling tower machine, and volumetric-divider machine
- Share of lost time: 66.4 % · as reported: “set-up and failures”
Show verbatim quote
Analysis showed the distribution of the losses with set-up and failures being the predominant with 66.4% of total lost time, followed by defects participating with 19.9% and reduced speed and minor stoppage contributing with 13.7%.
- Speed ratio: 86.0 % · as reported: “equipment failures”
Show verbatim quote
We found that the efficiency of a typical line (the ratio of the effective processing rate to the nominal processing rate) was 86 percent because of equipment failures.
- Number of events: 5.00 times/month · as reported: “machine breakdown”
Show verbatim quote
the machine breakdown rate has been significantly decreased from 12 times per monthto 5 times per month
- Number of events: 12.0 times/month · as reported: “machine breakdown”
Show verbatim quote
the machine breakdown rate has been significantly decreased from 12 times per monthto 5 times per month
- Share of loss events: 70.0 % · as reported: “Klockner equipment failures”
Show verbatim quote
70% das paradas de linha estavam relacionadas a problemas no equipamento da Klockner, 16% por problemas de fornecimento de energia e 9% por problemas na máquina de injetora de tinta
- CHANGEOVER TIME REDUCTION THROUGH LEAN TOOL “SMED” – A CASE STUDY FROM FOOD SECTOR (2018)Open sourceLost time: 10,184 hours · as reported: “Planned stoppages”
Show verbatim quote
It is clear from the chart that the most important were planned stoppages with total time 10184 hours.
- CHANGEOVER TIME REDUCTION THROUGH LEAN TOOL “SMED” – A CASE STUDY FROM FOOD SECTOR (2018)Open sourceShare of lost time: 61.0 % · as reported: “Planned stoppages”
Show verbatim quote
Plates fall into planned stoppages, accounting for 61% of all stoppages of the company.
- Penerapan Total Productive Maintenance (TPM) Pada Pabrik Gula Rafinasi di Indonesia (Studi Kasus: PT. XYZ) (2019)Open sourceNumber of events: 151 events · as reported: “breakdown (PM01)”
Show verbatim quote
Kejadian break down masih terjadi sejumlah 151 kejadian dengan durasi rata-rata 5,5 jam dalam periode tersebut.
- Penerapan Total Productive Maintenance (TPM) Pada Pabrik Gula Rafinasi di Indonesia (Studi Kasus: PT. XYZ) (2019)Open sourceMean event duration: 5.50 jam · as reported: “breakdown (PM01)”
Show verbatim quote
Kejadian break down masih terjadi sejumlah 151 kejadian dengan durasi rata-rata 5,5 jam dalam periode tersebut.
- ANALISIS PRODUKTIVITAS MESIN PRESS DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS(OEE) PADAPT. JAPFA COMFEED INDONESIA LAMPUNG (2017)Open sourceShare of lost time: 9.49 % · as reported: “Breakdowns losses”
Show verbatim quote
Breakdowns losses 31,42 9,49 94,89
- ANALISIS PRODUKTIVITAS MESIN PRESS DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS(OEE) PADAPT. JAPFA COMFEED INDONESIA LAMPUNG (2017)Open sourceLost time: 31.4 jam · as reported: “Breakdowns losses”
Show verbatim quote
Breakdowns losses 31,42 9,49 94,89
- Share of lost time: 11.2 % · as reported: “kerusakan mesin”
Show verbatim quote
Downtime yang terjadi di PT XYZ selama 2014 sampai Oktober 2015 rata-rata per bulan sebesar 11,21% atau 43,05 jam.
- Lost time: 43.1 jam/bulan · as reported: “kerusakan mesin”
Show verbatim quote
Downtime yang terjadi di PT XYZ selama 2014 sampai Oktober 2015 rata-rata per bulan sebesar 11,21% atau 43,05 jam.
- Share of planned time: 25.0 % · as reported: “machine breakdowns”
Show verbatim quote
Changeovers consumed 536 hours (28%), while machine breakdowns totalled 485 hours (25%).
- Lost time: 485 h · as reported: “machine breakdowns”
Show verbatim quote
Changeovers consumed 536 hours (28%), while machine breakdowns totalled 485 hours (25%).
- Analisis Efektivitas Mesin pada Divisi Pengalengan Jamur Di PT. Suryajaya Abadiperkasa Menggunakan Metode Overall Equipment Effectiveness (2020)Open sourceShare of lost time: 0.0993 % · as reported: “Breakdown Losses”
Show verbatim quote
Rata-Rata 0,099271 9,29814 30,74813 0,00000 0,00000 0,13414
- Implementation of Computerized Maintenance and Management System in Wine Factory in Ethiopia: A Case Study (2020)Open sourceLost time: 117 h · as reported: “machine breakdown time”
Show verbatim quote
The loss in production in this year is (116.5 + 160) hour 4300bot/hour = 1,188,950 bottles which is 12.46% of the total product.
- Implementation of Computerized Maintenance and Management System in Wine Factory in Ethiopia: A Case Study (2020)Open sourceLost time: 160 h · as reported: “machine breakdown time”
Show verbatim quote
The loss in production in this year is (116.5 + 160) hour 4300bot/hour = 1,188,950 bottles which is 12.46% of the total product.
- Implementation of Computerized Maintenance and Management System in Wine Factory in Ethiopia: A Case Study (2020)Open sourceShare of planned time: 12.5 % · as reported: “machine breakdown time”
Show verbatim quote
The loss in production in this year is (116.5 + 160) hour 4300bot/hour = 1,188,950 bottles which is 12.46% of the total product.
- Lost time: 590 min · as reported: “Equipment Failures”
Show verbatim quote
590 Equipment Failures
- Lost time: 14.0 h · as reported: “lost production time (late start-ups and work stoppages)”
Show verbatim quote
For a 26-week period prior to starting the project, a cumulative 14 hours of lost production time was observed.
- Share of lost time: 0.0480 % · as reported: “breakdown losses”
Show verbatim quote
Rata-rata kerugian yang terjadi pada setiap mesin yaitu breakdown losses 0,048%, setup and adjustment losses 0,159%, idle and minor stoppages 12,127%, dan reduced speed losses 11,749%.
- Maintenance Performance Evaluation and Downtime Analysis of Manufacturing Equipment in a Food Manufacturing Company (2021)Open sourceLost time: 25,398 min · as reported: “Equipment Failures/Breakdown”
Show verbatim quote
Equipment Failures/Breakdown 25398 24.26 65.08
- Maintenance Performance Evaluation and Downtime Analysis of Manufacturing Equipment in a Food Manufacturing Company (2021)Open sourceShare of lost time: 24.3 % · as reported: “Equipment Failures/Breakdown”
Show verbatim quote
Equipment Failures/Breakdown 25398 24.26 65.08
- Evaluation of reliability, availability and maintainability of a milk production line (2019)Open sourceShare of loss events: 57.5 % · as reported: “bottling machine and heat exchanger/pasteuriser machine failures”
Show verbatim quote
both bottling machine and heat exchanger/pasteuriser machine had 57.5% of all the failures that presented on the production line
- Production Model Based on Lean Manufacturing, MRP, MPS and TPM to Reduce Losses in a MSE in the Bakery Sector (2023)Open sourceShare of lost time: 48.0 % · as reported: “Machine failure”
Show verbatim quote
Machine failure: This indicator decreased from 48% to 15%, thanks to the implementation of the TPM, thanks to this the company was able to have better productivity.
- Production Model Based on Lean Manufacturing, MRP, MPS and TPM to Reduce Losses in a MSE in the Bakery Sector (2023)Open sourceShare of lost time: 15.0 % · as reported: “Machine failure”
Show verbatim quote
Machine failure: This indicator decreased from 48% to 15%, thanks to the implementation of the TPM, thanks to this the company was able to have better productivity.
- Model based on TPM to increase the overall efficiency of equipment in an oil company (2023)Open sourceMean event duration: 7.14 h · as reported: “machine failure (repair time)”
Show verbatim quote
the machine repair time was calculated by the difference between the technician arrival time and his departure time after subtracting the machine emptying time, obtaining an MTTR of. 7.14 hours.
- Model based on TPM to increase the overall efficiency of equipment in an oil company (2023)Open sourceLost time: 12.1 h · as reported: “time of failures in machinery”
Show verbatim quote
it was possible that the time of failures in machinery was reduced from 12.09 hours to 4.50 hours, obtaining a reduction of 62.78%.
- Model based on TPM to increase the overall efficiency of equipment in an oil company (2023)Open sourceLost time: 20.8 min · as reported: “machine set-up (15 tasks to initialize the machine)”
Show verbatim quote
Currently the set-up is done by means of 15 tasks each time a shift is started to initialize the machine where the 15 times were considered individually and then once added up, the current set up time was obtained, i.e., 20.83 minutes.
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 17,318 min · as reported: “Machine”
Show verbatim quote
Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 18,216 min · as reported: “Machine”
Show verbatim quote
Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 17,571 min · as reported: “Machine”
Show verbatim quote
Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 21,811 min · as reported: “Machine”
Show verbatim quote
Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 20,811 min · as reported: “Machine”
Show verbatim quote
Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 15,516 min · as reported: “Machine”
Show verbatim quote
Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 18,061 min · as reported: “Machine”
Show verbatim quote
Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 18,691 min · as reported: “Machine”
Show verbatim quote
Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 16,236 min · as reported: “Machine”
Show verbatim quote
Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 15,852 min · as reported: “Machine”
Show verbatim quote
Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 17,666 min · as reported: “Machine”
Show verbatim quote
Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 18,584 min · as reported: “Machine”
Show verbatim quote
Machine 17318 18216 17571 21811 20811 15516 18061 18691 16236 15852 17666 18584
- Share of planned time: 1.70 % · as reported: “Breakdown Losses”
Show verbatim quote
𝐵𝑟𝑒𝑎𝑘𝑑𝑜𝑤𝑛 𝐿𝑜𝑠𝑠𝑒𝑠= 1,704 %
- Increase of the Availability of Machinery in a Food Company Applying the TPM, SMED and RCM Methodologies (2024)Open sourceShare of loss events: 12.2 % · as reported: “Breakdowns in the Machinery”
Show verbatim quote
Breakdowns in the Machinery 12.20%
- Enhancing Operational Efficiency in Craft Beer Production: Implementation of Lean Manufacturing and TPM Methodologies in SMEs (2024)Open sourceShare of lost time: 46.9 % · as reported: “process shutdowns due to machine failures”
Show verbatim quote
errors in the conduct of operations accounted for 39.20%, reprocessing constituted 13.95%, and process shutdowns due to machine failures covered 46.85%.
- The implementation of an integrated Lean Management-HACCP model: application in the food industry in Casablanca,Morocco (2025)Open sourceLost time: 50.0 min · as reported: “Breakdowns”
Show verbatim quote
This implies a waste of 50 minutes.
- The implementation of an integrated Lean Management-HACCP model: application in the food industry in Casablanca,Morocco (2025)Open sourceNumber of events: 5.00 events · as reported: “Breakdowns”
Show verbatim quote
We can see how 5 machines break down with a 10 minute stoppage for every 8 hours worked.
- The implementation of an integrated Lean Management-HACCP model: application in the food industry in Casablanca,Morocco (2025)Open sourceMean event duration: 10.0 min · as reported: “Breakdowns”
Show verbatim quote
We can see how 5 machines break down with a 10 minute stoppage for every 8 hours worked.
- The implementation of an integrated Lean Management-HACCP model: application in the food industry in Casablanca,Morocco (2025)Open sourceNumber of events: 2.00 events · as reported: “Breakdowns”
Show verbatim quote
the breakdowns were reduced to 2 machines/8 hours
- Penerapan Konsep Lean Manufacturing Untuk Redesign Tata Letak Fasilitas Dengan Pendekatan Value Stream Mapping Pada UMKM Roti Agifa (2025)Open sourceLost time: 120 s · as reported: “Karyawan menyiapkan wadah untuk ragi”
Show verbatim quote
Karywan dapat menempatkan wadah ragi pada stasiun pembuatan adonan untuk mempersingkat waktu yang waktu awalnya sebesar 240 detik menjadi 120 detik
- Integrating Lean Manufacturing and TPM for Production Efficiency Improvement: A Peruvian Case Study in the Bottled Water Industry (2024)Open sourceLost time: 2.46 h/week · as reported: “unplanned stoppages”
Show verbatim quote
the total downtime due to unplanned stoppages was reduced from 3.79 hours to 2.46 hours per week, representing a reduction of 35.09%.
- Integrating Lean Manufacturing and TPM for Production Efficiency Improvement: A Peruvian Case Study in the Bottled Water Industry (2024)Open sourceLost time: 3.79 h/week · as reported: “unplanned machine stoppages”
Show verbatim quote
The bottleneck analysis revealed that unplanned machine stoppages accounted for a total downtime of 3.79 hours per week, which had a direct impact on the overall production capacity and efficiency of the plant.
- Implementing Lean and TPM for Machine Availability Enhancement: A Case Study in the Peruvian Food Processing Industry (2025)Open sourceShare of lost time: 46.0 % · as reported: “high machine shutdowns due to failure”
Show verbatim quote
At Level 2, the root causes of unproductive times were mainly attributed to high machine shutdowns due to failure (45.98%) and frequent setup stops (29.02%).
- Reliability-Centered Maintenance Model to Improve OEE in a Mass-Consumption Food Company: A Case Study from Peru (2025)Open sourceShare of lost time: 49.2 % · as reported: “production line stoppages”
Show verbatim quote
The analysis revealed three main reasons contributing to this issue: production line stoppages accounted for 49.2% of the problem, followed by low operational performance with a contribution of 46.5%, and a smaller share of 4.3% attributed to defective products.
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceNumber of events: 9.00 events · as reported: “spur gear failure”
Show verbatim quote
December 26.4 9
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceMean event duration: 26.4 h · as reported: “spur gear failure”
Show verbatim quote
December 26.4 9
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceNumber of events: 4.00 events · as reported: “spur gear failure”
Show verbatim quote
October 11.2 4
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceMean event duration: 11.2 h · as reported: “spur gear failure”
Show verbatim quote
October 11.2 4
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceNumber of events: 7.00 events · as reported: “spur gear failure”
Show verbatim quote
January 14.8 7
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceMean event duration: 14.8 h · as reported: “spur gear failure”
Show verbatim quote
January 14.8 7
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceLost time: 2,008 h · as reported: “spur gear failure”
Show verbatim quote
Total 106 2007.5 10000
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceNumber of events: 11.0 events · as reported: “spur gear failure”
Show verbatim quote
September 16.7 11
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceMean event duration: 16.7 h · as reported: “spur gear failure”
Show verbatim quote
September 16.7 11
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceNumber of events: 13.0 events · as reported: “spur gear failure”
Show verbatim quote
November 21.1 13
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceMean event duration: 21.1 h · as reported: “spur gear failure”
Show verbatim quote
November 21.1 13
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceNumber of events: 10.0 events · as reported: “spur gear failure”
Show verbatim quote
February 17.1 10
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceMean event duration: 17.1 h · as reported: “spur gear failure”
Show verbatim quote
February 17.1 10
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceNumber of events: 8.00 events · as reported: “spur gear failure”
Show verbatim quote
March 14.6 8
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceMean event duration: 14.6 h · as reported: “spur gear failure”
Show verbatim quote
March 14.6 8
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceLost time: 184 h · as reported: “spur gear failure”
Show verbatim quote
September 16.7 11 183.7 1040 75.4
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceNumber of events: 12.0 events · as reported: “spur gear failure”
Show verbatim quote
August 17.8 12
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceMean event duration: 17.8 h · as reported: “spur gear failure”
Show verbatim quote
August 17.8 12
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceNumber of events: 5.00 events · as reported: “spur gear failure”
Show verbatim quote
July 15.3 5
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceMean event duration: 15.3 h · as reported: “spur gear failure”
Show verbatim quote
July 15.3 5
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceNumber of events: 6.00 events · as reported: “spur gear failure”
Show verbatim quote
June 18.6 6
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceMean event duration: 18.6 h · as reported: “spur gear failure”
Show verbatim quote
June 18.6 6
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceMean event duration: 18.0 h · as reported: “spur gear failure”
Show verbatim quote
April 18 5
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceLost time: 274 h · as reported: “spur gear failure”
Show verbatim quote
November 21.1 13 274.3 1230 91.5
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceLost time: 238 h · as reported: “spur gear failure”
Show verbatim quote
December 26.4 9 237.6 850 100
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceLost time: 214 h · as reported: “spur gear failure”
Show verbatim quote
August 17.8 12 213.6 1130 65
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceLost time: 104 h · as reported: “spur gear failure”
Show verbatim quote
January 14.8 7 103.6 660 6.6
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceNumber of events: 106 events · as reported: “spur gear failure”
Show verbatim quote
Total 106
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceLost time: 171 h · as reported: “spur gear failure”
Show verbatim quote
February 17.1 10 171 940 16
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceLost time: 44.8 h · as reported: “spur gear failure”
Show verbatim quote
October 11.2 4 44.8 380 79.2
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceLost time: 117 h · as reported: “spur gear failure”
Show verbatim quote
March 14.6 8 116.8 750 23.5
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceLost time: 112 h · as reported: “spur gear failure”
Show verbatim quote
June 18.6 6 111.6 570 49
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceLost time: 384 h · as reported: “spur gear failure”
Show verbatim quote
May 24 16 384 1510 43.3
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceLost time: 76.5 h · as reported: “spur gear failure”
Show verbatim quote
July 15.3 5 76.5 470 53.7
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceLost time: 90.0 h · as reported: “spur gear failure”
Show verbatim quote
April 18 5 90 470 28.2
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceShare of loss events: 660 % · as reported: “spur gear failure”
Show verbatim quote
January 14.8 7 103.6 660 6.6
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceShare of loss events: 940 % · as reported: “spur gear failure”
Show verbatim quote
February 17.1 10 171 940 16
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceShare of loss events: 750 % · as reported: “spur gear failure”
Show verbatim quote
March 14.6 8 116.8 750 23.5
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceShare of loss events: 470 % · as reported: “spur gear failure”
Show verbatim quote
April 18 5 90 470 28.2
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceShare of loss events: 1,510 % · as reported: “spur gear failure”
Show verbatim quote
May 24 16 384 1510 43.3
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceShare of loss events: 570 % · as reported: “spur gear failure”
Show verbatim quote
June 18.6 6 111.6 570 49
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceShare of loss events: 1,130 % · as reported: “spur gear failure”
Show verbatim quote
August 17.8 12 213.6 1130 65
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceShare of loss events: 1,040 % · as reported: “spur gear failure”
Show verbatim quote
September 16.7 11 183.7 1040 75.4
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceShare of loss events: 380 % · as reported: “spur gear failure”
Show verbatim quote
October 11.2 4 44.8 380 79.2
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceShare of loss events: 1,230 % · as reported: “spur gear failure”
Show verbatim quote
November 21.1 13 274.3 1230 91.5
- On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data (2026)Open sourceShare of loss events: 850 % · as reported: “spur gear failure”
Show verbatim quote
December 26.4 9 237.6 850 100
- Sinergia lean-industria 4.0: un modelo de eficiencia operativa para mypes del sector alimentario (2026)Open sourceShare of lost time: 29.8 % · as reported: “Averías mecánicas y de software”
Show verbatim quote
Averías mecánicas y de software 29.80% 8.42% 21.38%
- Propuesta de mejora para incrementar el rendimiento de la línea de salsas usando SMED, Kanban, Industria 4.0 y 5S en una empresa del sector alimenticio (2026)Open sourceShare of lost time: 4.55 % · as reported: “Averías en las máquinas”
Show verbatim quote
Averías en las máquinas 1056.48 4.55% 90.13%
- Propuesta de mejora para incrementar el rendimiento de la línea de salsas usando SMED, Kanban, Industria 4.0 y 5S en una empresa del sector alimenticio (2026)Open sourceLost time: 1,056 min · as reported: “Averías en las máquinas”
Show verbatim quote
Averías en las máquinas 1056.48 4.55% 90.13%
- Application of TPM in line No 3 to increase production in a company that produces pasta. Lima, 2023 (2023)Open sourceLost time: 950 horas · as reported: “averías”
Show verbatim quote
podemos notar que el tiempo de averías es de 950.35 horas lo cual es mayor en comparación a las demás paradas como las de tipo rutinarias operacionales programada
- Waste Management and Operational Efficiency Improvement in Cake and Pastry Factory Through Adapting DMAIC Methodology (2026)Open sourceShare of planned time: 3.03 % · as reported: “breakdowns”
Show verbatim quote
Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist.
- Waste Management and Operational Efficiency Improvement in Cake and Pastry Factory Through Adapting DMAIC Methodology (2026)Open sourceLost time: 205 h · as reported: “breakdowns”
Show verbatim quote
Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist.
- Waste Management and Operational Efficiency Improvement in Cake and Pastry Factory Through Adapting DMAIC Methodology (2026)Open sourceNumber of events: 187 events · as reported: “breakdowns”
Show verbatim quote
Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist.
- Waste Management and Operational Efficiency Improvement in Cake and Pastry Factory Through Adapting DMAIC Methodology (2026)Open sourceDefect rate: 61.7 % · as reported: “breakdown waste”
Show verbatim quote
It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%.
- Waste Management and Operational Efficiency Improvement in Cake and Pastry Factory Through Adapting DMAIC Methodology (2026)Open sourceNumber of events: 200 events · as reported: “breakdown events”
Show verbatim quote
Analysis of 200 breakdown events by shift (Day: 6 AM - 6 PM, Night: 6 PM - 6 AM), Figure 5 showed a higher concentration of incidents during the night shift, particularly in the late evening and early morning hours.
- Waste Management and Operational Efficiency Improvement in Cake and Pastry Factory Through Adapting DMAIC Methodology (2026)Open sourceDefect rate: 46.5 % · as reported: “depanning failures”
Show verbatim quote
The depanning failures, representing approximately 46.5% of production waste, were identified as the most significant contribution.
- Waste Management and Operational Efficiency Improvement in Cake and Pastry Factory Through Adapting DMAIC Methodology (2026)Open sourceDefect rate: 13.9 % · as reported: “topping and panning failures”
Show verbatim quote
Similarly, topping and panning failures (13.9% combined) occurred when dough balls were misaligned in pans or when glazing and sesame seeds were applied unsuccessfully.
- Waste Management and Operational Efficiency Improvement in Cake and Pastry Factory Through Adapting DMAIC Methodology (2026)Open sourceShare of lost time: 46.5 % · as reported: “depanning failures”
Show verbatim quote
The depanning failures, representing approximately 46.5% of production waste, were identified as the most significant contribution.
- Waste Management and Operational Efficiency Improvement in Cake and Pastry Factory Through Adapting DMAIC Methodology (2026)Open sourceShare of lost time: 13.9 % · as reported: “panning and topping failures”
Show verbatim quote
Similarly, topping and panning failures (13.9% combined) occurred when dough balls were misaligned in pans or when glazing and sesame seeds were applied unsuccessfully.
- Proposal to Enhance Productivity by Applying Lean Manufacturing Tools in a Fish Canning Company (2026)Open sourceShare of lost time: 13.7 % · as reported: “equipment failure rate”
Show verbatim quote
equipment failure rates declined from 13.67% to 4.59%
- ANALISIS EFEKTIVITAS MESIN POLES BERAS (RICE POLISHER) MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN SIX BIG LOSSES PADA PB TRI HANIFA BERBASIS KONSEP TOTAL PRODUCTIVE MAINTENANCE (TPM) (2026)Open sourceShare of lost time: 3.33 % · as reported: “breakdown losses”
Show verbatim quote
Sementara itu, breakdown losses sebesar 3,33%, setup & adjustment losses sebesar 0,73%, dan process defect losses sebesar 2,5% tergolong rendah, sehingga tidak menjadi faktor dominan dalam penurunan kinerja mesin.
- Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy (2026)Open sourceLost time: 3.00 jam · as reported: “Breakdown”
Show verbatim quote
1 05/01/2026 07/01/26 21,2 40 3,00 5,67 38660
- Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy (2026)Open sourceLost time: 0.830 jam · as reported: “Breakdown”
Show verbatim quote
2 07/01/2026 09/01/26 21,2 40 0,83 4,67 42884
- Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy (2026)Open sourceLost time: 2.25 jam · as reported: “Breakdown”
Show verbatim quote
3 12/01/2026 14/01/26 21,2 40 2,25 4,00 40930
- Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy (2026)Open sourceLost time: 3.13 jam · as reported: “Breakdown”
Show verbatim quote
4 14/01/2026 16/01/26 21,2 40 3,13 5,52 39181
- Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy (2026)Open sourceLost time: 0.670 jam · as reported: “Breakdown”
Show verbatim quote
5 19/01/2026 21/01/26 21,2 40 0,67 4,00 44438
- Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy (2026)Open sourceLost time: 1.17 jam · as reported: “Breakdown”
Show verbatim quote
6 21/01/2026 23/01/26 21,2 40 1,17 3,65 42747
- Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy (2026)Open sourceLost time: 0.420 jam · as reported: “Breakdown”
Show verbatim quote
7 26/01/2026 28/01/26 21,2 40 0,42 5,25 43266
- Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy (2026)Open sourceLost time: 0.920 jam · as reported: “Breakdown”
Show verbatim quote
8 28/01/2026 30/01/26 21,2 40 0,92 5,50 42312
- Proposal for improving production efficiency in a food sector company, using SMED, Planned Maintenance and Poka-Yoke (2026)Open sourceShare of lost time: 35.4 % · as reported: “equipment breakdowns”
Show verbatim quote
Esta situación fue originada por cuatro causas raíz: averías en equipos (35.41%), elevados tiempos de setup (17.38%), producto final golpeado (32.69%) y etiquetado incorrecto (14.52%)
- Integrating SMED and Mechanical Design for Changeover Reduction in Beverage Packaging Lines (2026)Open sourceShare of planned time: 18.0 % · as reported: “Breakdowns and Malfunctions Time (BMT)”
Show verbatim quote
Although breakdown and malfunction losses (18.04%) are greater in aggregate than changeover and ramp-up losses (≈7.2%), they are not the focus of this study.
- Share of lost time: 61.9 % · as reported: “inoperatividad de los equipos”
Show verbatim quote
Estas se debían a la inoperatividad de los equipos (61.93%) por fallas mecánicas y eléctricas del equipamiento que obligaban al reemplazo de repuestos
- The Impact of Mean Time to Repair on Overall Equipment Effectiveness: Evidence from a Food Manufacturing Facility (2026)Open sourceNumber of events: 33.0 events · as reported: “breakdown”
Show verbatim quote
The median number of breakdowns is 33, with an interquartile range between 26 (Q1) and 38 (Q3) occurrences.
- The Impact of Mean Time to Repair on Overall Equipment Effectiveness: Evidence from a Food Manufacturing Facility (2026)Open sourceMean event duration: 26.9 min · as reported: “breakdown”
Show verbatim quote
The median MTTR is 23.51 minutes, while the mean of 26.87 minutes indicates right skewness due to several high-duration repair events.
- The Impact of Mean Time to Repair on Overall Equipment Effectiveness: Evidence from a Food Manufacturing Facility (2026)Open sourceMean event duration: 23.5 min · as reported: “breakdown”
Show verbatim quote
The median MTTR is 23.51 minutes, while the mean of 26.87 minutes indicates right skewness due to several high-duration repair events.
- The Impact of Mean Time to Repair on Overall Equipment Effectiveness: Evidence from a Food Manufacturing Facility (2026)Open sourceLost time: 832 min · as reported: “breakdown”
Show verbatim quote
The median breakdown time is 747 minutes, while the mean of 831.7 minutes indicates a right-skewed distribution influenced by days with unusually high breakdown durations.
- The Impact of Mean Time to Repair on Overall Equipment Effectiveness: Evidence from a Food Manufacturing Facility (2026)Open sourceLost time: 747 min · as reported: “breakdown”
Show verbatim quote
The median breakdown time is 747 minutes, while the mean of 831.7 minutes indicates a right-skewed distribution influenced by days with unusually high breakdown durations.
- The Impact of Mean Time to Repair on Overall Equipment Effectiveness: Evidence from a Food Manufacturing Facility (2026)Open sourceLost time: 214 min · as reported: “breakdown”
Show verbatim quote
The minimum breakdown duration of 214 minutes represents highly stable operating days, whereas the maximum of 1,799 minutes highlights rare but severe downtime events.
- The Impact of Mean Time to Repair on Overall Equipment Effectiveness: Evidence from a Food Manufacturing Facility (2026)Open sourceLost time: 1,799 min · as reported: “breakdown”
Show verbatim quote
The minimum breakdown duration of 214 minutes represents highly stable operating days, whereas the maximum of 1,799 minutes highlights rare but severe downtime events.
- The Impact of Mean Time to Repair on Overall Equipment Effectiveness: Evidence from a Food Manufacturing Facility (2026)Open sourceMean event duration: 6.11 min · as reported: “breakdown”
Show verbatim quote
The minimum MTTR of 6.11 minutes corresponds to rapid corrective interventions, whereas the maximum value of 81.45 minutes represents infrequent but prolonged repairs.
- The Impact of Mean Time to Repair on Overall Equipment Effectiveness: Evidence from a Food Manufacturing Facility (2026)Open sourceMean event duration: 81.5 min · as reported: “breakdown”
Show verbatim quote
The minimum MTTR of 6.11 minutes corresponds to rapid corrective interventions, whereas the maximum value of 81.45 minutes represents infrequent but prolonged repairs.
- The Impact of Mean Time to Repair on Overall Equipment Effectiveness: Evidence from a Food Manufacturing Facility (2026)Open sourceNumber of events: 9.00 events · as reported: “breakdown”
Show verbatim quote
The minimum value of 9 occurrences reflects exceptionally stable days, while the maximum of 63 occurrences indicates periods of heightened equipment instability.
- The Impact of Mean Time to Repair on Overall Equipment Effectiveness: Evidence from a Food Manufacturing Facility (2026)Open sourceNumber of events: 63.0 events · as reported: “breakdown”
Show verbatim quote
The minimum value of 9 occurrences reflects exceptionally stable days, while the maximum of 63 occurrences indicates periods of heightened equipment instability.
- Lost time: 25.0 min · as reported: “Máquina 2”
Show verbatim quote
Máquina 2 4 168 145,59 € 25
- Number of events: 4.00 events · as reported: “Máquina 2”
Show verbatim quote
Máquina 2 4 168 145,59 € 25
- Lost time: 47.0 min · as reported: “Máquina 1”
Show verbatim quote
Máquina 1 7 390 450,65 € 47
- Number of events: 7.00 events · as reported: “Máquina 1”
Show verbatim quote
Máquina 1 7 390 450,65 € 47