ANALISIS PERHITUNGAN EFEKTIFITAS MESIN FILLER LINE LAB MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) (Studi Kasus di PT. X)

Open source

1Bibliographic record

Authors
Lutfan Edison Abdullah, Bambang Purwanggono
Year
2016
Venue
Industrial Engineering Online Journal
DOI
—
Country
Indonesia
Segment
Dairy products
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 2 lines · 2 machines
Observation period
15 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
Produksi utama PT.X adalah susu murni dalam kemasan dimana setiap harinya mampu memproduksi sebanyak 100 ton susu murni yang diperoleh dari penghasil susu disekitar Bandung.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—filler LAB
Show verbatim quote (Section 3, Availability Factor (Faktor Ketersediaan), page 4)
Total downtime selama 15 hari kerja pada bulan Februari 2014 adalah 107,61 jam.
Not classifiable from the reportLost time108 jamBoth extractors agreed
—filler LAB
Show verbatim quote (Section 3, Performance Rate (Faktor Performansi), page 4)
Maka dapat diketahui Performance Factor Line LAB adalah sebesar 92%
nonePerformance92.0 %Both extractors agreed
—filler LAB
Show verbatim quote (Section 3, Availability Factor (Faktor Ketersediaan), page 4)
Maka dapat diketahui Availibility Factor Line LAB adalah sebesar 84%
noneAvailability84.0 %Both extractors agreed
—filler LAB
Show verbatim quote (Section 3, Overall Equipment Effectiveness, page 5)
Dari perhitungan di atas maka diketahui nilai Overall Equipment Effectiveness (OEE) dari Line LAB PT.X sebesar 77%.
noneOEE77.0 %Both extractors agreed
—filler LAB
Show verbatim quote (Section 3, Quality Factor (Faktor Kualitas), page 4-5)
Maka dapat diketahui Quality Factor Line LAB adalah sebesar 98%
noneQuality98.0 %Single extractor
CIP (clean in proses)filler LAB
Show verbatim quote (Lanjutan Tabel 2, Data Utilisasi Mesin LAB, page 4)
Total 107.61 6.469 638.570 49.660
Setup and adjustmentsLost time49.7 jamSingle extractor
—
Show verbatim quote (Page 5, Kesimpulan section)
tingkat quality 99%
noneQuality99.0 %Single extractor

Observation units

  • Line LAB · Filling · Baseline
  • LAB Line 2 filler · Filling · Baseline