foratvise
Get Started
Setup and adjustments

CIP (Clean-in-Place) cleaning cycle

Setup and adjustmentsAvailabilityFilling

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 56 % of the line's lost time. Reported by 3 of the 120 studies that could observe it (limited evidence).

What happens

The filler and its product-contact piping are taken offline so that an automated Clean-in-Place sequence can circulate rinse, caustic/acid and sanitizing solutions through the system, interrupting production while the cycle runs. This cleaning is normally required between product changes or at scheduled hygiene intervals to meet food-safety standards before the next run can start.

What is done about it

Standardize and automate the CIP recipe with sensor-based endpoint detection (conductivity, turbidity) to avoid over-cleaning, schedule CIP within planned changeover or shift-break windows, and use a dedicated CIP supply skid or parallel circuits so the filler can be returned to production as soon as the sanitary verification is complete.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.9% [0.2–2.2%]
Expected share of lost time
0.5% [0.1–1.2%]
Share of lost time when present
56% [44–67%]
Studies / units
120 / 162
Evidence grade
C

Grade C: 2 to 4 studies, or an interval wider than 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    1.3% [0.2–4.1%]18 studies
  • Soft drinks, bottled water and juices
    1.3% [0.3–3.4%]44 studies
  • Brewing, wine and spirits
    0.9% [0.1–3.0%]16 studies
  • Bakery and pasta
    1.0% [0.1–3.5%]0 studies
  • Meat, poultry and seafood
    1.0% [0.1–3.5%]6 studies
  • Fruit and vegetable processing
    1.0% [0.1–3.6%]4 studies
  • Grain and oilseed milling
    1.0% [0.1–3.6%]6 studies
  • Sugar and confectionery
    1.0% [0.1–3.5%]3 studies
  • Snacks, coffee, tea and other foods
    1.0% [0.1–3.3%]6 studies
  • Animal feed and pet food
    1.0% [0.1–3.7%]4 studies
  • Food manufacturing (unspecified or mixed)
    1.0% [0.1–3.4%]13 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The filler and its product-contact piping are taken offline so that an automated Clean-in-Place sequence can circulate rinse, caustic/acid and sanitizing solutions through the system, interrupting production while the cycle runs. This cleaning is normally required between product changes or at scheduled hygiene intervals to meet food-safety standards before the next run can start.

How it looks in SCADA data

Engineering guidance

SCADA/MES logs show the filler and CIP skid transitioning into a dedicated CIP or cleaning machine state, with valve sequencing, flow, temperature and conductivity trends confirming each rinse/wash/sanitize step; the filler state duration accumulates as changeover or non-production time and downstream stations show starvation while the cycle completes.

Countermeasure

Engineering guidance

Standardize and automate the CIP recipe with sensor-based endpoint detection (conductivity, turbidity) to avoid over-cleaning, schedule CIP within planned changeover or shift-break windows, and use a dedicated CIP supply skid or parallel circuits so the filler can be returned to production as soon as the sanitary verification is complete.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 49.7 jam · as reported: “CIP (clean in proses)”
    Show verbatim quote
    Total 107.61 6.469 638.570 49.660
  2. Share of lost time: 15.0 % · as reported: “CIP processes”
    Show verbatim quote
    Specifically,label changeovers account for a 16% loss,followed closely by CIP processes at 15% and size changeovers at 8.9%.
  3. Lost time: 2,509 min · as reported: “CIP (Cleaning In Place)”
    Show verbatim quote
    In the month February – May 2019 recorded existence minor idling downtime stop at line 4 , namely , CIP ( Cleaning In Place ) 2,509 minutes , SIP ( Sanitation In Place ) 1,943 minutes , stuck stamp on track 484 minutes , bottle stuck in the SIPA 322 divider , tilting was stuck for 277 minutes and the pallet ran out for 93 minutes .