Included study
Propuesta de implementación de un sistema de aspiración basado en la metodología lean manufacturing en el proceso de extrusión, para incrementar la capacidad de producción en una empresa productora de alimento balanceado acuícola
1Bibliographic record
- Authors
- Gamarra Marino, Héctor Diego
- Year
- 2016
- Venue
- renati
- DOI
- —
- Country
- —
- Segment
- Animal feed and pet food
- Process family
- Forming, baking and cooking
- Study type
- Before/after intervention
- Extraction scope
- Abstract only
- Size
- 1 plants · 1 lines · — machines
- Observation period
- —
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
to increase production capacity in a company producing aquaculture balanced food
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 5High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—extruderShow verbatim quote (Abstract)increasing availability in dosage of 88 % to 95% and extrusion 77 % to 79% , increase OEE from 60 to 71% | none | OEE | 71.0 % | Both extractors agreed |
—extruderShow verbatim quote (Abstract)increasing availability in dosage of 88 % to 95% and extrusion 77 % to 79% , increase OEE from 60 to 71% | none | OEE | 60.0 % | Both extractors agreed |
—mixing dosing areaShow verbatim quote (Abstract)increasing availability in dosage of 88 % to 95% and extrusion 77 % to 79% , increase OEE from 60 to 71% | none | Availability | 95.0 % | Both extractors agreed |
—mixing dosing areaShow verbatim quote (Abstract)increasing availability in dosage of 88 % to 95% and extrusion 77 % to 79% , increase OEE from 60 to 71% | none | Availability | 88.0 % | Both extractors agreed |
—extruderShow verbatim quote (Abstract)increasing availability in dosage of 88 % to 95% and extrusion 77 % to 79% , increase OEE from 60 to 71% | none | Availability | 79.0 % | Both extractors agreed |
—extruderShow verbatim quote (Abstract)increasing availability in dosage of 88 % to 95% and extrusion 77 % to 79% , increase OEE from 60 to 71% | none | Availability | 77.0 % | Both extractors agreed |
reformatting (lack of mixture)extruderShow verbatim quote (Abstract)reduce time 210.44 reformatting minutes to 38.47 minutes | Setup and adjustments | Lost time | 38.5 min | Both extractors agreed |
reformatting (lack of mixture)extruderShow verbatim quote (Abstract)reduce time 210.44 reformatting minutes to 38.47 minutes | Setup and adjustments | Lost time | 210 min | Both extractors agreed |
Observation units
- Extrusion · Extrusion · After intervention
- Extrusion · Extrusion · Baseline
- Dosing/mixing area · Mixing and blending · After intervention
- Dosing/mixing area · Mixing and blending · Baseline