Maximizing Overall Equipment Effectiveness in a Food Processing Industry: A Case Study
1Bibliographic record
- Authors
- Christopher Chukwutoo Ihueze, Chukwuebuka Martinjoe U-Dominic
- Year
- 2018
- Venue
- Archives of Current Research International
- Country
- Nigeria
- Segment
- Bakery and pasta
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 270 days
- Data collection
- questionnaire
- Intervention
Show the setting as described by the study
The research was carried out in the food manufacturing company, major production of noodles, and the study was limited to bottleneck operation and the identified bottleneck machine in this study was the noodle packaging machine.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—noodle packaging machineShow verbatim quote (Results and Analysis)the Overall equipment effectiveness value increased by 26%, from 48% to 74%. | none | OEE | 74.0 % | Both extractors agreed |
—noodle packaging machineShow verbatim quote (Results and Analysis)After TPM implementation, the availability factor was raised by 19%; from 70% to 89%, the performance factor experienced a 14% increase, from initial value of 70% to 84%. | none | Performance | 84.0 % | Both extractors agreed |
—noodle packaging machineShow verbatim quote (Results and Analysis)After TPM implementation, the availability factor was raised by 19%; from 70% to 89%, the performance factor experienced a 14% increase, from initial value of 70% to 84%. | none | Availability | 89.0 % | Both extractors agreed |
—noodle packaging machineShow verbatim quote (Results and Analysis, Fig. 2 description)the OEE rates before TPM implementation are 70% for availability factor, 70% for performance factor, 99% for quality factor and 48% for the OEE value. | none | OEE | 48.0 % | Both extractors agreed |
—noodle packaging machineShow verbatim quote (Results and Analysis, Fig. 2 description)the OEE rates before TPM implementation are 70% for availability factor, 70% for performance factor, 99% for quality factor and 48% for the OEE value. | none | Performance | 70.0 % | Both extractors agreed |
—noodle packaging machineShow verbatim quote (Results and Analysis, Fig. 2 description)the OEE rates before TPM implementation are 70% for availability factor, 70% for performance factor, 99% for quality factor and 48% for the OEE value. | none | Availability | 70.0 % | Both extractors agreed |
Operating Standard not followednoodle packaging machineShow verbatim quote (Table 5)4 Operating Standard not followed 13 119 25.00 100 25.54 100 | Equipment failure (breakdowns) | Lost time | 119 Hr. | Both extractors agreed |
Operating Standard not followednoodle packaging machineShow verbatim quote (Table 5)4 Operating Standard not followed 13 119 25.00 100 25.54 100 | Equipment failure (breakdowns) | Number of events | 13.0 events | Both extractors agreed |
Operating Standard not followednoodle packaging machineShow verbatim quote (Table 4)4 Operating Standard not followed 22 44 22.92 100 5.30 100 | Equipment failure (breakdowns) | Lost time | 44.0 Hr. | Both extractors agreed |
Operating Standard not followednoodle packaging machineShow verbatim quote (Table 4)4 Operating Standard not followed 22 44 22.92 100 5.30 100 | Equipment failure (breakdowns) | Number of events | 22.0 events | Both extractors agreed |
Operating Standard not followednoodle packaging machineShow verbatim quote (Table 5)4 Operating Standard not followed 13 119 25.00 100 25.54 100 | Equipment failure (breakdowns) | Share of loss events | 25.0 % | Both extractors agreed |
Operating Standard not followednoodle packaging machineShow verbatim quote (Table 4)4 Operating Standard not followed 22 44 22.92 100 5.30 100 | Equipment failure (breakdowns) | Share of loss events | 22.9 % | Both extractors agreed |
Basic condition neglectnoodle packaging machineShow verbatim quote (Table 5)2 Basic condition neglect 13 111 25.00 44.20 23.82 42.91 | Equipment failure (breakdowns) | Lost time | 111 Hr. | Both extractors agreed |
Basic condition neglectnoodle packaging machineShow verbatim quote (Table 5)2 Basic condition neglect 13 111 25.00 44.20 23.82 42.91 | Equipment failure (breakdowns) | Number of events | 13.0 events | Both extractors agreed |
Basic condition neglectnoodle packaging machineShow verbatim quote (Table 4)2 Basic condition neglect 30 313 31.25 61.46 37.53 70.98 | Equipment failure (breakdowns) | Lost time | 313 Hr. | Both extractors agreed |
Basic condition neglectnoodle packaging machineShow verbatim quote (Table 4)2 Basic condition neglect 30 313 31.25 61.46 37.53 70.98 | Equipment failure (breakdowns) | Number of events | 30.0 events | Both extractors agreed |
Unchecked deteriorationnoodle packaging machineShow verbatim quote (Table 4)1 Unchecked deterioration 29 279 30.21 30.21 33.45 33.45 | Equipment failure (breakdowns) | Lost time | 279 Hr. | Both extractors agreed |
Unchecked deteriorationnoodle packaging machineShow verbatim quote (Table 4)1 Unchecked deterioration 29 279 30.21 30.21 33.45 33.45 | Equipment failure (breakdowns) | Number of events | 29.0 events | Both extractors agreed |
Inadequate skill levelnoodle packaging machineShow verbatim quote (Table 5)3 Inadequate skill level 16 147 30.80 75.00 31.55 74.46 | Equipment failure (breakdowns) | Lost time | 147 Hr. | Both extractors agreed |
Inadequate skill levelnoodle packaging machineShow verbatim quote (Table 5)3 Inadequate skill level 16 147 30.80 75.00 31.55 74.46 | Equipment failure (breakdowns) | Number of events | 16.0 events | Both extractors agreed |
Unchecked deteriorationnoodle packaging machineShow verbatim quote (Table 5)1 Unchecked deterioration 10 89 19.20 19.20 19.09 19.09 | Equipment failure (breakdowns) | Lost time | 89.0 Hr. | Both extractors agreed |
Unchecked deteriorationnoodle packaging machineShow verbatim quote (Table 5)1 Unchecked deterioration 10 89 19.20 19.20 19.09 19.09 | Equipment failure (breakdowns) | Number of events | 10.0 events | Both extractors agreed |
Inadequate skill levelnoodle packaging machineShow verbatim quote (Table 4)3 Inadequate skill level 15 198 15.63 77.09 23.74 94.70 | Equipment failure (breakdowns) | Lost time | 198 Hr. | Both extractors agreed |
Inadequate skill levelnoodle packaging machineShow verbatim quote (Table 4)3 Inadequate skill level 15 198 15.63 77.09 23.74 94.70 | Equipment failure (breakdowns) | Number of events | 15.0 events | Both extractors agreed |
Basic condition neglectnoodle packaging machineShow verbatim quote (Table 5)2 Basic condition neglect 13 111 25.00 44.20 23.82 42.91 | Equipment failure (breakdowns) | Share of loss events | 25.0 % | Both extractors agreed |
Basic condition neglectnoodle packaging machineShow verbatim quote (Table 4)2 Basic condition neglect 30 313 31.25 61.46 37.53 70.98 | Equipment failure (breakdowns) | Share of loss events | 31.3 % | Both extractors agreed |
Unchecked deteriorationnoodle packaging machineShow verbatim quote (Table 4)1 Unchecked deterioration 29 279 30.21 30.21 33.45 33.45 | Equipment failure (breakdowns) | Share of loss events | 30.2 % | Both extractors agreed |
Inadequate skill levelnoodle packaging machineShow verbatim quote (Table 5)3 Inadequate skill level 16 147 30.80 75.00 31.55 74.46 | Equipment failure (breakdowns) | Share of loss events | 30.8 % | Both extractors agreed |
Unchecked deteriorationnoodle packaging machineShow verbatim quote (Table 5)1 Unchecked deterioration 10 89 19.20 19.20 19.09 19.09 | Equipment failure (breakdowns) | Share of loss events | 19.2 % | Both extractors agreed |
Inadequate skill levelnoodle packaging machineShow verbatim quote (Table 4)3 Inadequate skill level 15 198 15.63 77.09 23.74 94.70 | Equipment failure (breakdowns) | Share of loss events | 15.6 % | Both extractors agreed |
—noodle packaging machineShow verbatim quote (Table 3)After TPM 3,735 52 446 71.83 | Equipment failure (breakdowns) | Time between events | 71.8 Hr. | Both extractors agreed |
—noodle packaging machineShow verbatim quote (Table 3)Before TPM 3,735 96 834 38.91 | Equipment failure (breakdowns) | Time between events | 38.9 Hr. | Both extractors agreed |
—noodle packaging machineShow verbatim quote (Table 3)After TPM 3,735 52 446 71.83 | Equipment failure (breakdowns) | Lost time | 446 Hr. | Both extractors agreed |
—noodle packaging machineShow verbatim quote (Table 3)Before TPM 3,735 96 834 38.91 | Equipment failure (breakdowns) | Lost time | 834 Hr. | Both extractors agreed |
—noodle packaging machineShow verbatim quote (Table 1)Mar. 66.8 99.0 69.8 46.2 | none | Quality | 99.0 % | Both extractors agreed |
—noodle packaging machineShow verbatim quote (Table 1)Oct. 69.4 96.5 74.9 50.2 | none | Quality | 96.5 % | Single extractor |
—noodle packaging machineShow verbatim quote (Table 1)Nov. 70.6 97.6 66.9 46.1 | none | Quality | 97.6 % | Single extractor |
—noodle packaging machineShow verbatim quote (Table 1)Dec. 71.1 99.2 70.4 49.7 | none | Quality | 99.2 % | Single extractor |
—noodle packaging machineShow verbatim quote (Table 1)Jan. 69.2 98.9 76.3 52.2 | none | Quality | 98.9 % | Single extractor |
—noodle packaging machineShow verbatim quote (Table 1)Feb. 72.4 99.5 63.9 46.0 | none | Quality | 99.5 % | Single extractor |
—noodle packaging machineShow verbatim quote (Table 3)Before TPM 3,735 96 834 38.91 | Equipment failure (breakdowns) | Number of events | 96.0 events | Single extractor |
Unchecked deteriorationnoodle packaging machineShow verbatim quote (Table 4)1 Unchecked deterioration 29 279 30.21 30.21 33.45 33.45 | Equipment failure (breakdowns) | Share of lost time | 33.5 % | Single extractor |
Basic condition neglectnoodle packaging machineShow verbatim quote (Table 4)2 Basic condition neglect 30 313 31.25 61.46 37.53 70.98 | Equipment failure (breakdowns) | Share of lost time | 37.5 % | Single extractor |
Inadequate skill levelnoodle packaging machineShow verbatim quote (Table 4)3 Inadequate skill level 15 198 15.63 77.09 23.74 94.70 | Equipment failure (breakdowns) | Share of lost time | 23.7 % | Single extractor |
Operating Standard not followednoodle packaging machineShow verbatim quote (Table 4)4 Operating Standard not followed 22 44 22.92 100 5.30 100 | Equipment failure (breakdowns) | Share of lost time | 5.30 % | Single extractor |
—noodle packaging machineShow verbatim quote (Table 2)Jun. 83.1 99.7 81.3 67.4 | none | Quality | 99.7 % | Single extractor |
—noodle packaging machineShow verbatim quote (Table 2)Jul. 85.3 99.5 92.7 78.7 | none | Quality | 99.5 % | Single extractor |
—noodle packaging machineShow verbatim quote (Table 2)Aug. 84.6 99.6 96.3 81.1 | none | Quality | 99.6 % | Single extractor |
—noodle packaging machineShow verbatim quote (Table 2)Sept. 86.0 99.8 83.5 71.7 | none | Quality | 99.8 % | Single extractor |
—noodle packaging machineShow verbatim quote (Table 2)Nov. 83.9 99.9 90.8 76.1 | none | Quality | 99.9 % | Single extractor |
—noodle packaging machineShow verbatim quote (Table 3)After TPM 3,735 52 446 71.83 | Equipment failure (breakdowns) | Number of events | 52.0 events | Single extractor |
Unchecked deteriorationnoodle packaging machineShow verbatim quote (Table 5)1 Unchecked deterioration 10 89 19.20 19.20 19.09 19.09 | Equipment failure (breakdowns) | Share of lost time | 19.1 % | Single extractor |
Basic condition neglectnoodle packaging machineShow verbatim quote (Table 5)2 Basic condition neglect 13 111 25.00 44.20 23.82 42.91 | Equipment failure (breakdowns) | Share of lost time | 23.8 % | Single extractor |
Inadequate skill levelnoodle packaging machineShow verbatim quote (Table 5)3 Inadequate skill level 16 147 30.80 75.00 31.55 74.46 | Equipment failure (breakdowns) | Share of lost time | 31.6 % | Single extractor |
Operating Standard not followednoodle packaging machineShow verbatim quote (Table 5)4 Operating Standard not followed 13 119 25.00 100 25.54 100 | Equipment failure (breakdowns) | Share of lost time | 25.5 % | Single extractor |
Observation units
- Noodle packaging machine · Packaging (forming, sealing, wrapping, case packing, palletizing) · After intervention
- Noodle packaging machine · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline