Kaizen na indústria alimentar

Open source

1Bibliographic record

Authors
Luís Filipe Monteiro Martins Monjardim Quelhas
Year
2010
Venue
Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT)
Country
Portugal
Segment
Bakery and pasta
Process family
Forming, baking and cooking
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 2 lines · — machines
Observation period
180 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
Ambas as linhas são inteiramente dedicadas à produção de tostas de luxo.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Tabela 1)
2009 50,62% 16,80% 32,60% 52,34% 18,85% 27,13%
noneOEE50.6 %Single extractor
Paragens
Show verbatim quote (Tabela 1)
2009 50,62% 16,80% 32,60% 52,34% 18,85% 27,13%
Not classifiable from the reportShare of lost time16.8 %Single extractor
Quebras
Show verbatim quote (Tabela 1)
2009 50,62% 16,80% 32,60% 52,34% 18,85% 27,13%
Process defects (scrap and rework)Defect rate32.6 %Single extractor
—
Show verbatim quote (Tabela 1)
Jan-2010 59,83% 13,58% 29,32% 55,19% 16,13% 28,38%
noneOEE59.8 %Single extractor
Paragens
Show verbatim quote (Tabela 1)
Jan-2010 59,83% 13,58% 29,32% 55,19% 16,13% 28,38%
Not classifiable from the reportShare of lost time13.6 %Single extractor
Quebras
Show verbatim quote (Tabela 1)
Jan-2010 59,83% 13,58% 29,32% 55,19% 16,13% 28,38%
Process defects (scrap and rework)Defect rate29.3 %Single extractor
—
Show verbatim quote (Tabela 1)
2009 50,62% 16,80% 32,60% 52,34% 18,85% 27,13%
noneOEE52.3 %Single extractor
Paragens
Show verbatim quote (Tabela 1)
2009 50,62% 16,80% 32,60% 52,34% 18,85% 27,13%
Not classifiable from the reportShare of lost time18.9 %Single extractor
Quebras
Show verbatim quote (Tabela 1)
2009 50,62% 16,80% 32,60% 52,34% 18,85% 27,13%
Process defects (scrap and rework)Defect rate27.1 %Single extractor
—
Show verbatim quote (Tabela 1)
Jan-2010 59,83% 13,58% 29,32% 55,19% 16,13% 28,38%
noneOEE55.2 %Single extractor
Paragens
Show verbatim quote (Tabela 1)
Jan-2010 59,83% 13,58% 29,32% 55,19% 16,13% 28,38%
Not classifiable from the reportShare of lost time16.1 %Single extractor
Quebras
Show verbatim quote (Tabela 1)
Jan-2010 59,83% 13,58% 29,32% 55,19% 16,13% 28,38%
Process defects (scrap and rework)Defect rate28.4 %Single extractor
—Extrusora
Show verbatim quote (Ilustração 47)
1 6/mês <1/mês Equipa P
Not classifiable from the reportNumber of events6.00 ocorrências/mêsSingle extractor
—Extrusora
Show verbatim quote (Ilustração 47)
2 300 min/mês <45/mês Equipa P
Not classifiable from the reportLost time300 min/mêsSingle extractor
—Extrusora
Show verbatim quote (Ilustração 47)
3 45 min/ ocorrência <20 min/ ocorrência Equipa P
Not classifiable from the reportMean event duration45.0 min/ ocorrênciaSingle extractor

Observation units

  • Linha 10 (2009) · Whole line or unspecified equipment · Baseline
  • Linha 10 (Jan-2010) · Whole line or unspecified equipment · Baseline
  • Linha 15 (2009) · Whole line or unspecified equipment · Baseline
  • Linha 15 (Jan-2010) · Whole line or unspecified equipment · Baseline
  • Extrusora L15 · Extrusion · Baseline