Included study
PERENCANAAN TOTAL PRODUCTIVE MAINTENANCE(TPM) UNTUK MENINGKATKAN PRODUKTIVITAS STASIUN GILINGAN PADA PG KEBON AGUNG
1Bibliographic record
- Authors
- Mochammad Harits Trysnawan Amaanullah, Rina Sandora, Pranowo Sidi
- Year
- 2017
- Venue
- Seminar K3
- DOI
- —
- Country
- Indonesia
- Segment
- Sugar and confectionery
- Process family
- Milling, extraction and separation
- Study type
- Single case study
- Extraction scope
- Abstract only
- Size
- 1 plants · 1 lines · — machines
- Observation period
- 510 days
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
PG Kebon Agung has 15.000 TCD set milling capacity and 12.500 TCD effective milling capacity.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 7High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
machinery damage (breakdown)milling stationShow verbatim quote (abstract)machinery damage leads to milling stops for about 766.61 hours which affect to a not optimum production process. | Equipment failure (breakdowns) | Lost time | 767 hours | Both extractors agreed |
—milling stationShow verbatim quote (abstract)OEE number on 2014-2016 ranged on 78.15% until 83.18%. | none | OEE | 78.2 % | Single extractor |
—milling stationShow verbatim quote (abstract)OEE number on 2014-2016 ranged on 78.15% until 83.18%. | none | OEE | 83.2 % | Single extractor |
Observation units
- Stasiun Gilingan (milling station) · Milling and grinding · Baseline