Unspecified milling-area stoppage (mixed equipment/department code)
In short
It appears in about 4 of every 100 lines studied.
When it appears, it takes on average about 60 % of the line's lost time. Reported by 7 of the 43 studies that could observe it (good evidence).
What happens
The loss is recorded using broad plant-area or maintenance-department codes (mechanical, electrical, instrumentation, steam/power generation, cane supply, sugar house) rather than a specific failure mode or root cause. Mechanical and electrical breakdowns, utility interruptions, and upstream material shortages (cane, bagasse, sugar storage) are therefore lumped together under the same generic label, including a residual catch-all category.
What is done about it
Standardize downtime coding to specific failure modes and material-shortage reasons instead of department labels, enforce a closed reason-code taxonomy that eliminates the open other category, and link each code to the actual SCADA tag or sensor that triggered the stop. Periodically audit operator classification to improve granularity for Pareto analysis.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 4.0% [1.2–9.2%]
- Expected share of lost time
- 2.4% [0.7–5.6%]
- Share of lost time when present
- 60% [51–71%]
- Studies / units
- 43 / 48
- Evidence grade
- B
Grade B: 5 to 9 studies, or an interval width between 0.20 and 0.35.
2Probability by segment
- Dairy products4.3% [0.6–13.1%]5 studies
- Soft drinks, bottled water and juices4.6% [0.6–14.9%]1 study
- Brewing, wine and spirits4.8% [0.6–16.2%]0 studies
- Bakery and pasta4.8% [0.6–15.6%]0 studies
- Meat, poultry and seafood4.7% [0.6–15.4%]0 studies
- Fruit and vegetable processing4.4% [0.6–13.8%]2 studies
- Grain and oilseed milling4.1% [0.6–12.6%]7 studies
- Sugar and confectionery14% [4–32%]10 studies
- Snacks, coffee, tea and other foods3.8% [0.6–11.4%]5 studies
- Animal feed and pet food5.5% [1.1–15.3%]6 studies
- Food manufacturing (unspecified or mixed)4.0% [0.6–12.3%]7 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe loss is recorded using broad plant-area or maintenance-department codes (mechanical, electrical, instrumentation, steam/power generation, cane supply, sugar house) rather than a specific failure mode or root cause. Mechanical and electrical breakdowns, utility interruptions, and upstream material shortages (cane, bagasse, sugar storage) are therefore lumped together under the same generic label, including a residual catch-all category.
How it looks in SCADA data
Engineering guidanceSCADA/MES logs show stop events tagged with department or area identifiers rather than equipment-level fault codes, with a persistent nonzero count in a generic or other bucket. Stoppage durations are aggregated per area code, making it difficult to trace them back to a specific signal, actuator state or alarm pattern, and correlation with upstream/downstream starvation or blocking is weak.
Countermeasure
Engineering guidanceStandardize downtime coding to specific failure modes and material-shortage reasons instead of department labels, enforce a closed reason-code taxonomy that eliminates the open other category, and link each code to the actual SCADA tag or sensor that triggered the stop. Periodically audit operator classification to improve granularity for Pareto analysis.
4Sources
- IMPACT OF FACILITY MAINTENANCE SYSTEM ON PRODUCT PHYSICAL LOSSES IN A POULTRY FEED MILL UNIT (2011)Open sourceLost time: 0.259 Kg.h-1 · as reported: “Grinding (all products, first entry)”
Show verbatim quote
1Grinding 3.40 0.076 ± 0.023 0.259 ± 0.078 Kg 3.23
- IMPACT OF FACILITY MAINTENANCE SYSTEM ON PRODUCT PHYSICAL LOSSES IN A POULTRY FEED MILL UNIT (2011)Open sourceLost time: 0.352 Kg.h-1 · as reported: “Grinding (all products, second entry)”
Show verbatim quote
1Grinding 9.70 0.036 ± 0.013 0.352 ± 0.126 Kg 4.39
- PERENCANAAN TOTAL PRODUCTIVE MAINTENANCE(TPM) UNTUK MENINGKATKAN PRODUKTIVITAS STASIUN GILINGAN PADA PG KEBON AGUNG (2017)Open sourceLost time: 767 hours · as reported: “machinery damage (breakdown)”
Show verbatim quote
machinery damage leads to milling stops for about 766.61 hours which affect to a not optimum production process.
- Strategic formulation of industrial maintenance based on equipment reliability in a sugar and ethanol production plant (2020)Open sourceTime between events: 6.48 log(min) · as reported: “Operating - Preparation / Grinding”
Show verbatim quote
Operating - Preparation / Grinding 276 6.477 (6.269; 6.684)
- Strategic formulation of industrial maintenance based on equipment reliability in a sugar and ethanol production plant (2020)Open sourceTime between events: 6.28 log(min) · as reported: “Operating - Sugar Factory”
Show verbatim quote
Operating - Sugar Factory 258 6.2799 (6.0656; 6.4942)
- Strategic formulation of industrial maintenance based on equipment reliability in a sugar and ethanol production plant (2020)Open sourceNumber of events: 258 events · as reported: “Operating - Sugar Factory”
Show verbatim quote
Operating - Sugar Factory 258 6.2799 (6.0656; 6.4942)
- Strategic formulation of industrial maintenance based on equipment reliability in a sugar and ethanol production plant (2020)Open sourceNumber of events: 276 events · as reported: “Operating - Preparation / Grinding”
Show verbatim quote
Operating - Preparation / Grinding 276 6.477 (6.269; 6.684)
- Peningkatan overall equipment effectiveness (OEE) mesin grinding pada produksi cokelat bubuk di PT ABC (2023)Open sourceShare of planned time: 4.00 % · as reported: “breakdown”
Show verbatim quote
Rata-rata breakdown losses mesin grinding pada periode Juli sampai Desember 2022 adalah 4%.
- Peningkatan overall equipment effectiveness (OEE) mesin grinding pada produksi cokelat bubuk di PT ABC (2023)Open sourceLost time: 33.5 jam · as reported: “breakdown time”
Show verbatim quote
Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
- Peningkatan overall equipment effectiveness (OEE) mesin grinding pada produksi cokelat bubuk di PT ABC (2023)Open sourceLost time: 28.1 jam · as reported: “breakdown time”
Show verbatim quote
Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
- Peningkatan overall equipment effectiveness (OEE) mesin grinding pada produksi cokelat bubuk di PT ABC (2023)Open sourceLost time: 40.9 jam · as reported: “breakdown time”
Show verbatim quote
Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
- Peningkatan overall equipment effectiveness (OEE) mesin grinding pada produksi cokelat bubuk di PT ABC (2023)Open sourceLost time: 13.6 jam · as reported: “breakdown time”
Show verbatim quote
Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
- Peningkatan overall equipment effectiveness (OEE) mesin grinding pada produksi cokelat bubuk di PT ABC (2023)Open sourceLost time: 26.7 jam · as reported: “breakdown time”
Show verbatim quote
Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
- Peningkatan overall equipment effectiveness (OEE) mesin grinding pada produksi cokelat bubuk di PT ABC (2023)Open sourceLost time: 14.1 jam · as reported: “breakdown time”
Show verbatim quote
Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
- Peningkatan overall equipment effectiveness (OEE) mesin grinding pada produksi cokelat bubuk di PT ABC (2023)Open sourceLost time: 14.0 jam · as reported: “planned downtime”
Show verbatim quote
Planned downtime (jam) 14 14 14 14 14 14
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 250 events · as reported: “Extraction and milling (EXTR)”
Show verbatim quote
EXTR 250 91,24 137,80 18988,05 41,40
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 91.2 min · as reported: “Extraction and milling (EXTR)”
Show verbatim quote
EXTR 250 91,24 137,80 18988,05 41,40
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 106 events · as reported: “Sugar factory (FABR)”
Show verbatim quote
FABR 106 69,79 76,71 5885,13 49,80
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 69.8 min · as reported: “Sugar factory (FABR)”
Show verbatim quote
FABR 106 69,79 76,71 5885,13 49,80
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 52.0 events · as reported: “Mill drive”
Show verbatim quote
Acionamento da moenda 52 153,6 281,1 78992,4 50,4
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 154 min · as reported: “Mill drive”
Show verbatim quote
Acionamento da moenda 52 153,6 281,1 78992,4 50,4
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 5.00 events · as reported: “Sugar storage”
Show verbatim quote
Armazenagem de açúcar 5 97,6 94,6 8956,9 64,2
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 97.6 min · as reported: “Sugar storage”
Show verbatim quote
Armazenagem de açúcar 5 97,6 94,6 8956,9 64,2
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 39.0 events · as reported: “Imbibition”
Show verbatim quote
Embebição 39 57,2 74,6 5567,1 39,0
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 57.2 min · as reported: “Imbibition”
Show verbatim quote
Embebição 39 57,2 74,6 5567,1 39,0
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 78.0 events · as reported: “Sugar manufacturing”
Show verbatim quote
Fabricação de açúcar 78 92,9 150,0 22513,3 48,0
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 92.9 min · as reported: “Sugar manufacturing”
Show verbatim quote
Fabricação de açúcar 78 92,9 150,0 22513,3 48,0
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 1.00 events · as reported: “Other”
Show verbatim quote
outro 1 25,200 * * 25,200
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 25.2 min · as reported: “Other”
Show verbatim quote
outro 1 25,200 * * 25,200
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 24.0 events · as reported: “Milling ramp”
Show verbatim quote
Rampa de Moagem 24 150,4 205,1 42061,1 53,4
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 150 min · as reported: “Milling ramp”
Show verbatim quote
Rampa de Moagem 24 150,4 205,1 42061,1 53,4
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 36.0 events · as reported: “Mill train”
Show verbatim quote
Terno de moenda 36 72,8 78,0 6080,9 41,4
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 72.8 min · as reported: “Mill train”
Show verbatim quote
Terno de moenda 36 72,8 78,0 6080,9 41,4
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 97.0 events · as reported: “ELET”
Show verbatim quote
ELET 97 61,9 108,5 11763,1 28,2
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 61.9 min · as reported: “ELET”
Show verbatim quote
ELET 97 61,9 108,5 11763,1 28,2
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 23.0 events · as reported: “EXCM”
Show verbatim quote
EXCM 23 142,3 205,8 42339,1 51,0
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 142 min · as reported: “EXCM”
Show verbatim quote
EXCM 23 142,3 205,8 42339,1 51,0
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 250 events · as reported: “EXTR”
Show verbatim quote
EXTR 250 91,24 137,80 18988,05 41,40
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 91.2 min · as reported: “EXTR”
Show verbatim quote
EXTR 250 91,24 137,80 18988,05 41,40
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 106 events · as reported: “FABR”
Show verbatim quote
FABR 106 69,79 76,71 5885,13 49,80
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 69.8 min · as reported: “FABR”
Show verbatim quote
FABR 106 69,79 76,71 5885,13 49,80
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 53.0 events · as reported: “GVAP”
Show verbatim quote
GVAP 53 119,1 150,3 22580,0 52,2
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 119 min · as reported: “GVAP”
Show verbatim quote
GVAP 53 119,1 150,3 22580,0 52,2
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 50.0 events · as reported: “INST”
Show verbatim quote
INST 50 47,83 51,52 2653,99 30,00
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 47.8 min · as reported: “INST”
Show verbatim quote
INST 50 47,83 51,52 2653,99 30,00
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 104 events · as reported: “MECN”
Show verbatim quote
MECN 104 202,9 319,6 102155,8 74,4
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 203 min · as reported: “MECN”
Show verbatim quote
MECN 104 202,9 319,6 102155,8 74,4
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 61.9 min · as reported: “ELET (Manutenção Elétrica)”
Show verbatim quote
ELET 97 61,9 108,5 11763,1 28,2
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 97.0 events · as reported: “ELET (Manutenção Elétrica)”
Show verbatim quote
ELET 97 61,9 108,5 11763,1 28,2
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 91.2 min · as reported: “EXTR (Extração e moagem)”
Show verbatim quote
EXTR 250 91,24 137,80 18988,05 41,40
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 250 events · as reported: “EXTR (Extração e moagem)”
Show verbatim quote
EXTR 250 91,24 137,80 18988,05 41,40
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 69.8 min · as reported: “FABR (Fábrica de açúcar)”
Show verbatim quote
FABR 106 69,79 76,71 5885,13 49,80
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 106 events · as reported: “FABR (Fábrica de açúcar)”
Show verbatim quote
FABR 106 69,79 76,71 5885,13 49,80
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 119 min · as reported: “GVAP (Geração de Vapor)”
Show verbatim quote
GVAP 53 119,1 150,3 22580,0 52,2
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 53.0 events · as reported: “GVAP (Geração de Vapor)”
Show verbatim quote
GVAP 53 119,1 150,3 22580,0 52,2
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 47.8 min · as reported: “INST (Instrumentação)”
Show verbatim quote
INST 50 47,83 51,52 2653,99 30,00
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 50.0 events · as reported: “INST (Instrumentação)”
Show verbatim quote
INST 50 47,83 51,52 2653,99 30,00
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 203 min · as reported: “MECN (Manutenção Mecânica)”
Show verbatim quote
MECN 104 202,9 319,6 102155,8 74,4
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 104 events · as reported: “MECN (Manutenção Mecânica)”
Show verbatim quote
MECN 104 202,9 319,6 102155,8 74,4
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 154 min · as reported: “Acionamento da moenda”
Show verbatim quote
Acionamento da moenda 52 153,6 281,1 78992,4 50,4
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 52.0 events · as reported: “Acionamento da moenda”
Show verbatim quote
Acionamento da moenda 52 153,6 281,1 78992,4 50,4
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 146 min · as reported: “Alimentação do sistema”
Show verbatim quote
Alimentação do sistema 36 146,1 221,5 49060,6 55,5
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 36.0 events · as reported: “Alimentação do sistema”
Show verbatim quote
Alimentação do sistema 36 146,1 221,5 49060,6 55,5
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 97.6 min · as reported: “Armazenagem de açúcar”
Show verbatim quote
Armazenagem de açúcar 5 97,6 94,6 8956,9 64,2
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 5.00 events · as reported: “Armazenagem de açúcar”
Show verbatim quote
Armazenagem de açúcar 5 97,6 94,6 8956,9 64,2
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 57.2 min · as reported: “Embebição”
Show verbatim quote
Embebição 39 57,2 74,6 5567,1 39,0
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 39.0 events · as reported: “Embebição”
Show verbatim quote
Embebição 39 57,2 74,6 5567,1 39,0
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 35.0 min · as reported: “Esteira Intermediária”
Show verbatim quote
Esteira Intermediária 44 35,02 36,51 1332,87 22,50
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 44.0 events · as reported: “Esteira Intermediária”
Show verbatim quote
Esteira Intermediária 44 35,02 36,51 1332,87 22,50
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 92.9 min · as reported: “Fabricação de açúcar”
Show verbatim quote
Fabricação de açúcar 78 92,9 150,0 22513,3 48,0
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 78.0 events · as reported: “Fabricação de açúcar”
Show verbatim quote
Fabricação de açúcar 78 92,9 150,0 22513,3 48,0
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 52.8 min · as reported: “Falta de cana - transpor”
Show verbatim quote
Falta de cana - transpor 1 52,800 * * 52,800
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 1.00 events · as reported: “Falta de cana - transpor”
Show verbatim quote
Falta de cana - transpor 1 52,800 * * 52,800
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 109 min · as reported: “Geração de energia”
Show verbatim quote
Geração de energia 20 108,8 111,9 12519,0 64,8
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 20.0 events · as reported: “Geração de energia”
Show verbatim quote
Geração de energia 20 108,8 111,9 12519,0 64,8
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 93.1 min · as reported: “Geraçao de vapor”
Show verbatim quote
Geraçao de vapor 41 93,1 116,1 13480,3 45,0
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 41.0 events · as reported: “Geraçao de vapor”
Show verbatim quote
Geraçao de vapor 41 93,1 116,1 13480,3 45,0
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 88.8 min · as reported: “Movimentação de bagaço”
Show verbatim quote
Movimentação de bagaço 71 88,8 126,8 16084,5 33,0
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 71.0 events · as reported: “Movimentação de bagaço”
Show verbatim quote
Movimentação de bagaço 71 88,8 126,8 16084,5 33,0
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 25.2 min · as reported: “outro”
Show verbatim quote
outro 1 25,200 * * 25,200
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 1.00 events · as reported: “outro”
Show verbatim quote
outro 1 25,200 * * 25,200
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 138 min · as reported: “Preparo de cana”
Show verbatim quote
Preparo de cana 135 138,3 246,5 60760,6 51,0
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 135 events · as reported: “Preparo de cana”
Show verbatim quote
Preparo de cana 135 138,3 246,5 60760,6 51,0
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 150 min · as reported: “Rampa de Moagem”
Show verbatim quote
Rampa de Moagem 24 150,4 205,1 42061,1 53,4
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 24.0 events · as reported: “Rampa de Moagem”
Show verbatim quote
Rampa de Moagem 24 150,4 205,1 42061,1 53,4
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 40.7 min · as reported: “Recepção de cana”
Show verbatim quote
Recepção de cana 15 40,7 64,6 4177,7 15,0
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 15.0 events · as reported: “Recepção de cana”
Show verbatim quote
Recepção de cana 15 40,7 64,6 4177,7 15,0
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 72.8 min · as reported: “Terno de moenda”
Show verbatim quote
Terno de moenda 36 72,8 78,0 6080,9 41,4
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 36.0 events · as reported: “Terno de moenda”
Show verbatim quote
Terno de moenda 36 72,8 78,0 6080,9 41,4
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 70.7 min · as reported: “Tratamento de caldo”
Show verbatim quote
Tratamento de caldo 91 70,71 86,06 7405,94 45,00
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 91.0 events · as reported: “Tratamento de caldo”
Show verbatim quote
Tratamento de caldo 91 70,71 86,06 7405,94 45,00
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 79.8 min · as reported: “Utilidades”
Show verbatim quote
Utilidades 5 79,8 50,5 2547,5 82,2
- ETRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 5.00 events · as reported: “Utilidades”
Show verbatim quote
Utilidades 5 79,8 50,5 2547,5 82,2
- Reliability Measurement of Torque Transmission System for Spice Manufacturing Plant (2019)Open sourceTime between events: 698 Hr · as reported: “Overall/Mixed failure modes”
Show verbatim quote
Overall/Mixed failure modes 698.30 3.70 362.49 11.91
- Reliability Measurement of Torque Transmission System for Spice Manufacturing Plant (2019)Open sourceTime between events: 362 Hr · as reported: “Overall/Mixed failure modes”
Show verbatim quote
Overall/Mixed failure modes 698.30 3.70 362.49 11.91
- Reliability Measurement of Torque Transmission System for Spice Manufacturing Plant (2019)Open sourceMean event duration: 11.9 Hr · as reported: “Overall/Mixed failure modes”
Show verbatim quote
Overall/Mixed failure modes 698.30 3.70 362.49 11.91
- Reliability Measurement of Torque Transmission System for Spice Manufacturing Plant (2019)Open sourceMean event duration: 3.70 Hr · as reported: “Overall/Mixed failure modes”
Show verbatim quote
Overall/Mixed failure modes 698.30 3.70 362.49 11.91