Equipment failure (breakdowns)

Unspecified milling-area stoppage (mixed equipment/department code)

Equipment failure (breakdowns)AvailabilityMilling and grinding

In short

It appears in about 4 of every 100 lines studied.

When it appears, it takes on average about 60 % of the line's lost time. Reported by 7 of the 43 studies that could observe it (good evidence).

What happens

The loss is recorded using broad plant-area or maintenance-department codes (mechanical, electrical, instrumentation, steam/power generation, cane supply, sugar house) rather than a specific failure mode or root cause. Mechanical and electrical breakdowns, utility interruptions, and upstream material shortages (cane, bagasse, sugar storage) are therefore lumped together under the same generic label, including a residual catch-all category.

What is done about it

Standardize downtime coding to specific failure modes and material-shortage reasons instead of department labels, enforce a closed reason-code taxonomy that eliminates the open other category, and link each code to the actual SCADA tag or sensor that triggered the stop. Periodically audit operator classification to improve granularity for Pareto analysis.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
4.0% [1.2–9.2%]
Expected share of lost time
2.4% [0.7–5.6%]
Share of lost time when present
60% [51–71%]
Studies / units
43 / 48
Evidence grade
B

Grade B: 5 to 9 studies, or an interval width between 0.20 and 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    4.3% [0.6–13.1%]5 studies
  • Soft drinks, bottled water and juices
    4.6% [0.6–14.9%]1 study
  • Brewing, wine and spirits
    4.8% [0.6–16.2%]0 studies
  • Bakery and pasta
    4.8% [0.6–15.6%]0 studies
  • Meat, poultry and seafood
    4.7% [0.6–15.4%]0 studies
  • Fruit and vegetable processing
    4.4% [0.6–13.8%]2 studies
  • Grain and oilseed milling
    4.1% [0.6–12.6%]7 studies
  • Sugar and confectionery
    14% [4–32%]10 studies
  • Snacks, coffee, tea and other foods
    3.8% [0.6–11.4%]5 studies
  • Animal feed and pet food
    5.5% [1.1–15.3%]6 studies
  • Food manufacturing (unspecified or mixed)
    4.0% [0.6–12.3%]7 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The loss is recorded using broad plant-area or maintenance-department codes (mechanical, electrical, instrumentation, steam/power generation, cane supply, sugar house) rather than a specific failure mode or root cause. Mechanical and electrical breakdowns, utility interruptions, and upstream material shortages (cane, bagasse, sugar storage) are therefore lumped together under the same generic label, including a residual catch-all category.

How it looks in SCADA data

Engineering guidance

SCADA/MES logs show stop events tagged with department or area identifiers rather than equipment-level fault codes, with a persistent nonzero count in a generic or other bucket. Stoppage durations are aggregated per area code, making it difficult to trace them back to a specific signal, actuator state or alarm pattern, and correlation with upstream/downstream starvation or blocking is weak.

Countermeasure

Engineering guidance

Standardize downtime coding to specific failure modes and material-shortage reasons instead of department labels, enforce a closed reason-code taxonomy that eliminates the open other category, and link each code to the actual SCADA tag or sensor that triggered the stop. Periodically audit operator classification to improve granularity for Pareto analysis.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 0.259 Kg.h-1 · as reported: “Grinding (all products, first entry)”
    Show verbatim quote
    1Grinding 3.40 0.076 ± 0.023 0.259 ± 0.078 Kg 3.23
  2. Lost time: 0.352 Kg.h-1 · as reported: “Grinding (all products, second entry)”
    Show verbatim quote
    1Grinding 9.70 0.036 ± 0.013 0.352 ± 0.126 Kg 4.39
  3. Lost time: 767 hours · as reported: “machinery damage (breakdown)”
    Show verbatim quote
    machinery damage leads to milling stops for about 766.61 hours which affect to a not optimum production process.
  4. Time between events: 6.48 log(min) · as reported: “Operating - Preparation / Grinding”
    Show verbatim quote
    Operating - Preparation / Grinding 276 6.477 (6.269; 6.684)
  5. Time between events: 6.28 log(min) · as reported: “Operating - Sugar Factory”
    Show verbatim quote
    Operating - Sugar Factory 258 6.2799 (6.0656; 6.4942)
  6. Number of events: 258 events · as reported: “Operating - Sugar Factory”
    Show verbatim quote
    Operating - Sugar Factory 258 6.2799 (6.0656; 6.4942)
  7. Number of events: 276 events · as reported: “Operating - Preparation / Grinding”
    Show verbatim quote
    Operating - Preparation / Grinding 276 6.477 (6.269; 6.684)
  8. Share of planned time: 4.00 % · as reported: “breakdown”
    Show verbatim quote
    Rata-rata breakdown losses mesin grinding pada periode Juli sampai Desember 2022 adalah 4%.
  9. Lost time: 33.5 jam · as reported: “breakdown time”
    Show verbatim quote
    Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
  10. Lost time: 28.1 jam · as reported: “breakdown time”
    Show verbatim quote
    Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
  11. Lost time: 40.9 jam · as reported: “breakdown time”
    Show verbatim quote
    Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
  12. Lost time: 13.6 jam · as reported: “breakdown time”
    Show verbatim quote
    Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
  13. Lost time: 26.7 jam · as reported: “breakdown time”
    Show verbatim quote
    Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
  14. Lost time: 14.1 jam · as reported: “breakdown time”
    Show verbatim quote
    Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
  15. Lost time: 14.0 jam · as reported: “planned downtime”
    Show verbatim quote
    Planned downtime (jam) 14 14 14 14 14 14
  16. Number of events: 250 events · as reported: “Extraction and milling (EXTR)”
    Show verbatim quote
    EXTR 250 91,24 137,80 18988,05 41,40
  17. Mean event duration: 91.2 min · as reported: “Extraction and milling (EXTR)”
    Show verbatim quote
    EXTR 250 91,24 137,80 18988,05 41,40
  18. Number of events: 106 events · as reported: “Sugar factory (FABR)”
    Show verbatim quote
    FABR 106 69,79 76,71 5885,13 49,80
  19. Mean event duration: 69.8 min · as reported: “Sugar factory (FABR)”
    Show verbatim quote
    FABR 106 69,79 76,71 5885,13 49,80
  20. Number of events: 52.0 events · as reported: “Mill drive”
    Show verbatim quote
    Acionamento da moenda 52 153,6 281,1 78992,4 50,4
  21. Mean event duration: 154 min · as reported: “Mill drive”
    Show verbatim quote
    Acionamento da moenda 52 153,6 281,1 78992,4 50,4
  22. Number of events: 5.00 events · as reported: “Sugar storage”
    Show verbatim quote
    Armazenagem de açúcar 5 97,6 94,6 8956,9 64,2
  23. Mean event duration: 97.6 min · as reported: “Sugar storage”
    Show verbatim quote
    Armazenagem de açúcar 5 97,6 94,6 8956,9 64,2
  24. Number of events: 39.0 events · as reported: “Imbibition”
    Show verbatim quote
    Embebição 39 57,2 74,6 5567,1 39,0
  25. Mean event duration: 57.2 min · as reported: “Imbibition”
    Show verbatim quote
    Embebição 39 57,2 74,6 5567,1 39,0
  26. Number of events: 78.0 events · as reported: “Sugar manufacturing”
    Show verbatim quote
    Fabricação de açúcar 78 92,9 150,0 22513,3 48,0
  27. Mean event duration: 92.9 min · as reported: “Sugar manufacturing”
    Show verbatim quote
    Fabricação de açúcar 78 92,9 150,0 22513,3 48,0
  28. Number of events: 1.00 events · as reported: “Other”
    Show verbatim quote
    outro 1 25,200 * * 25,200
  29. Mean event duration: 25.2 min · as reported: “Other”
    Show verbatim quote
    outro 1 25,200 * * 25,200
  30. Number of events: 24.0 events · as reported: “Milling ramp”
    Show verbatim quote
    Rampa de Moagem 24 150,4 205,1 42061,1 53,4
  31. Mean event duration: 150 min · as reported: “Milling ramp”
    Show verbatim quote
    Rampa de Moagem 24 150,4 205,1 42061,1 53,4
  32. Number of events: 36.0 events · as reported: “Mill train”
    Show verbatim quote
    Terno de moenda 36 72,8 78,0 6080,9 41,4
  33. Mean event duration: 72.8 min · as reported: “Mill train”
    Show verbatim quote
    Terno de moenda 36 72,8 78,0 6080,9 41,4
  34. Number of events: 97.0 events · as reported: “ELET”
    Show verbatim quote
    ELET 97 61,9 108,5 11763,1 28,2
  35. Mean event duration: 61.9 min · as reported: “ELET”
    Show verbatim quote
    ELET 97 61,9 108,5 11763,1 28,2
  36. Number of events: 23.0 events · as reported: “EXCM”
    Show verbatim quote
    EXCM 23 142,3 205,8 42339,1 51,0
  37. Mean event duration: 142 min · as reported: “EXCM”
    Show verbatim quote
    EXCM 23 142,3 205,8 42339,1 51,0
  38. Number of events: 250 events · as reported: “EXTR”
    Show verbatim quote
    EXTR 250 91,24 137,80 18988,05 41,40
  39. Mean event duration: 91.2 min · as reported: “EXTR”
    Show verbatim quote
    EXTR 250 91,24 137,80 18988,05 41,40
  40. Number of events: 106 events · as reported: “FABR”
    Show verbatim quote
    FABR 106 69,79 76,71 5885,13 49,80
  41. Mean event duration: 69.8 min · as reported: “FABR”
    Show verbatim quote
    FABR 106 69,79 76,71 5885,13 49,80
  42. Number of events: 53.0 events · as reported: “GVAP”
    Show verbatim quote
    GVAP 53 119,1 150,3 22580,0 52,2
  43. Mean event duration: 119 min · as reported: “GVAP”
    Show verbatim quote
    GVAP 53 119,1 150,3 22580,0 52,2
  44. Number of events: 50.0 events · as reported: “INST”
    Show verbatim quote
    INST 50 47,83 51,52 2653,99 30,00
  45. Mean event duration: 47.8 min · as reported: “INST”
    Show verbatim quote
    INST 50 47,83 51,52 2653,99 30,00
  46. Number of events: 104 events · as reported: “MECN”
    Show verbatim quote
    MECN 104 202,9 319,6 102155,8 74,4
  47. Mean event duration: 203 min · as reported: “MECN”
    Show verbatim quote
    MECN 104 202,9 319,6 102155,8 74,4
  48. Mean event duration: 61.9 min · as reported: “ELET (Manutenção Elétrica)”
    Show verbatim quote
    ELET 97 61,9 108,5 11763,1 28,2
  49. Number of events: 97.0 events · as reported: “ELET (Manutenção Elétrica)”
    Show verbatim quote
    ELET 97 61,9 108,5 11763,1 28,2
  50. Mean event duration: 91.2 min · as reported: “EXTR (Extração e moagem)”
    Show verbatim quote
    EXTR 250 91,24 137,80 18988,05 41,40
  51. Number of events: 250 events · as reported: “EXTR (Extração e moagem)”
    Show verbatim quote
    EXTR 250 91,24 137,80 18988,05 41,40
  52. Mean event duration: 69.8 min · as reported: “FABR (Fábrica de açúcar)”
    Show verbatim quote
    FABR 106 69,79 76,71 5885,13 49,80
  53. Number of events: 106 events · as reported: “FABR (Fábrica de açúcar)”
    Show verbatim quote
    FABR 106 69,79 76,71 5885,13 49,80
  54. Mean event duration: 119 min · as reported: “GVAP (Geração de Vapor)”
    Show verbatim quote
    GVAP 53 119,1 150,3 22580,0 52,2
  55. Number of events: 53.0 events · as reported: “GVAP (Geração de Vapor)”
    Show verbatim quote
    GVAP 53 119,1 150,3 22580,0 52,2
  56. Mean event duration: 47.8 min · as reported: “INST (Instrumentação)”
    Show verbatim quote
    INST 50 47,83 51,52 2653,99 30,00
  57. Number of events: 50.0 events · as reported: “INST (Instrumentação)”
    Show verbatim quote
    INST 50 47,83 51,52 2653,99 30,00
  58. Mean event duration: 203 min · as reported: “MECN (Manutenção Mecânica)”
    Show verbatim quote
    MECN 104 202,9 319,6 102155,8 74,4
  59. Number of events: 104 events · as reported: “MECN (Manutenção Mecânica)”
    Show verbatim quote
    MECN 104 202,9 319,6 102155,8 74,4
  60. Mean event duration: 154 min · as reported: “Acionamento da moenda”
    Show verbatim quote
    Acionamento da moenda 52 153,6 281,1 78992,4 50,4
  61. Number of events: 52.0 events · as reported: “Acionamento da moenda”
    Show verbatim quote
    Acionamento da moenda 52 153,6 281,1 78992,4 50,4
  62. Mean event duration: 146 min · as reported: “Alimentação do sistema”
    Show verbatim quote
    Alimentação do sistema 36 146,1 221,5 49060,6 55,5
  63. Number of events: 36.0 events · as reported: “Alimentação do sistema”
    Show verbatim quote
    Alimentação do sistema 36 146,1 221,5 49060,6 55,5
  64. Mean event duration: 97.6 min · as reported: “Armazenagem de açúcar”
    Show verbatim quote
    Armazenagem de açúcar 5 97,6 94,6 8956,9 64,2
  65. Number of events: 5.00 events · as reported: “Armazenagem de açúcar”
    Show verbatim quote
    Armazenagem de açúcar 5 97,6 94,6 8956,9 64,2
  66. Mean event duration: 57.2 min · as reported: “Embebição”
    Show verbatim quote
    Embebição 39 57,2 74,6 5567,1 39,0
  67. Number of events: 39.0 events · as reported: “Embebição”
    Show verbatim quote
    Embebição 39 57,2 74,6 5567,1 39,0
  68. Mean event duration: 35.0 min · as reported: “Esteira Intermediária”
    Show verbatim quote
    Esteira Intermediária 44 35,02 36,51 1332,87 22,50
  69. Number of events: 44.0 events · as reported: “Esteira Intermediária”
    Show verbatim quote
    Esteira Intermediária 44 35,02 36,51 1332,87 22,50
  70. Mean event duration: 92.9 min · as reported: “Fabricação de açúcar”
    Show verbatim quote
    Fabricação de açúcar 78 92,9 150,0 22513,3 48,0
  71. Number of events: 78.0 events · as reported: “Fabricação de açúcar”
    Show verbatim quote
    Fabricação de açúcar 78 92,9 150,0 22513,3 48,0
  72. Mean event duration: 52.8 min · as reported: “Falta de cana - transpor”
    Show verbatim quote
    Falta de cana - transpor 1 52,800 * * 52,800
  73. Number of events: 1.00 events · as reported: “Falta de cana - transpor”
    Show verbatim quote
    Falta de cana - transpor 1 52,800 * * 52,800
  74. Mean event duration: 109 min · as reported: “Geração de energia”
    Show verbatim quote
    Geração de energia 20 108,8 111,9 12519,0 64,8
  75. Number of events: 20.0 events · as reported: “Geração de energia”
    Show verbatim quote
    Geração de energia 20 108,8 111,9 12519,0 64,8
  76. Mean event duration: 93.1 min · as reported: “Geraçao de vapor”
    Show verbatim quote
    Geraçao de vapor 41 93,1 116,1 13480,3 45,0
  77. Number of events: 41.0 events · as reported: “Geraçao de vapor”
    Show verbatim quote
    Geraçao de vapor 41 93,1 116,1 13480,3 45,0
  78. Mean event duration: 88.8 min · as reported: “Movimentação de bagaço”
    Show verbatim quote
    Movimentação de bagaço 71 88,8 126,8 16084,5 33,0
  79. Number of events: 71.0 events · as reported: “Movimentação de bagaço”
    Show verbatim quote
    Movimentação de bagaço 71 88,8 126,8 16084,5 33,0
  80. Mean event duration: 25.2 min · as reported: “outro”
    Show verbatim quote
    outro 1 25,200 * * 25,200
  81. Number of events: 1.00 events · as reported: “outro”
    Show verbatim quote
    outro 1 25,200 * * 25,200
  82. Mean event duration: 138 min · as reported: “Preparo de cana”
    Show verbatim quote
    Preparo de cana 135 138,3 246,5 60760,6 51,0
  83. Number of events: 135 events · as reported: “Preparo de cana”
    Show verbatim quote
    Preparo de cana 135 138,3 246,5 60760,6 51,0
  84. Mean event duration: 150 min · as reported: “Rampa de Moagem”
    Show verbatim quote
    Rampa de Moagem 24 150,4 205,1 42061,1 53,4
  85. Number of events: 24.0 events · as reported: “Rampa de Moagem”
    Show verbatim quote
    Rampa de Moagem 24 150,4 205,1 42061,1 53,4
  86. Mean event duration: 40.7 min · as reported: “Recepção de cana”
    Show verbatim quote
    Recepção de cana 15 40,7 64,6 4177,7 15,0
  87. Number of events: 15.0 events · as reported: “Recepção de cana”
    Show verbatim quote
    Recepção de cana 15 40,7 64,6 4177,7 15,0
  88. Mean event duration: 72.8 min · as reported: “Terno de moenda”
    Show verbatim quote
    Terno de moenda 36 72,8 78,0 6080,9 41,4
  89. Number of events: 36.0 events · as reported: “Terno de moenda”
    Show verbatim quote
    Terno de moenda 36 72,8 78,0 6080,9 41,4
  90. Mean event duration: 70.7 min · as reported: “Tratamento de caldo”
    Show verbatim quote
    Tratamento de caldo 91 70,71 86,06 7405,94 45,00
  91. Number of events: 91.0 events · as reported: “Tratamento de caldo”
    Show verbatim quote
    Tratamento de caldo 91 70,71 86,06 7405,94 45,00
  92. Mean event duration: 79.8 min · as reported: “Utilidades”
    Show verbatim quote
    Utilidades 5 79,8 50,5 2547,5 82,2
  93. Number of events: 5.00 events · as reported: “Utilidades”
    Show verbatim quote
    Utilidades 5 79,8 50,5 2547,5 82,2
  94. Time between events: 698 Hr · as reported: “Overall/Mixed failure modes”
    Show verbatim quote
    Overall/Mixed failure modes 698.30 3.70 362.49 11.91
  95. Time between events: 362 Hr · as reported: “Overall/Mixed failure modes”
    Show verbatim quote
    Overall/Mixed failure modes 698.30 3.70 362.49 11.91
  96. Mean event duration: 11.9 Hr · as reported: “Overall/Mixed failure modes”
    Show verbatim quote
    Overall/Mixed failure modes 698.30 3.70 362.49 11.91
  97. Mean event duration: 3.70 Hr · as reported: “Overall/Mixed failure modes”
    Show verbatim quote
    Overall/Mixed failure modes 698.30 3.70 362.49 11.91