ANALISIS TOTAL PRODUCTIVE MAINTENANCE (TPM) PADA STASIUN KERNEL CRUSHING PLANT (KCP) DI PT. X

Open source

1Bibliographic record

Authors
Nina Hairiyah, Raden Rizki, Rino Adi Wijaya
Year
2019
Venue
Jurnal Teknologi Pertanian Andalas
Country
—
Segment
Grain and oilseed milling
Process family
Milling, extraction and separation
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
153 days
Data collection
maintenance_records
Intervention
Show the setting as described by the study
Penelitian ini dilakukan dengan objek mesin first press pada stasiun Kernel Crushing Plant (KCP) di PT. X.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—first press
Show verbatim quote (Table 6)
Rata-rata 97,28 78,20 89,51 68,26
nonePerformance78.2 %Both extractors agreed
—first press
Show verbatim quote (Table 6)
Rata-rata 97,28 78,20 89,51 68,26
noneAvailability97.3 %Both extractors agreed
—first press
Show verbatim quote (Table 6)
Rata-rata 97,28 78,20 89,51 68,26
noneQuality89.5 %Both extractors agreed
—first press
Show verbatim quote (Table 6)
Rata-rata 97,28 78,20 89,51 68,26
noneOEE68.3 %Both extractors agreed
—first press
Show verbatim quote (Table 2 / text August)
Waktu tersebut didapat dari hasil pengurangan loadingtime 43.440 menit dengan waktu downtime selama 777 menit.
Not classifiable from the reportLost time777 menitSingle extractor
—first press
Show verbatim quote (Table 2 / text September)
Pada bulan September operating time hanya selama 31.590 dikarenakan waktu downtime yang tinggi yaitu selama 1.410 menit dengan waktu loading 33.000 menit.
Not classifiable from the reportLost time1,410 menitSingle extractor
—first press
Show verbatim quote (Table 2 / text October)
Pada bulan Oktober memiliki waktu loading selama 43.140 menit dengan downtime selama 1.371 menit, dapat diketahui operating timeyaitu selama 41.769 menit.
Not classifiable from the reportLost time1,371 menitSingle extractor
—first press
Show verbatim quote (Table 2 / text November)
Pada bulan November memiliki loading time 33.000 menit dengan downtime yang cukup rendah yaitu 318 menit dan didapat operating time yaitu selama 32.682 menit.
Not classifiable from the reportLost time318 menitSingle extractor
—first press
Show verbatim quote (Table 2 / text December)
Pada bulan Desember memilikioperating time yang paling lama yaitu 42.960 dengan downtime yang paling kecil yaitu hanya 180 menit dengan loading time 43.140 menit.
Not classifiable from the reportLost time180 menitSingle extractor
—first press
Show verbatim quote (Table 1 (Agustus))
1 Agustus 31 44.640 1200 43.440
Planned downtime (scheduled maintenance, breaks, no demand)Lost time1,200 menitSingle extractor
—first press
Show verbatim quote (Table 1 (Oktober))
3 Oktober 31 44.640 1500 43.140
Planned downtime (scheduled maintenance, breaks, no demand)Lost time1,500 menitSingle extractor
dirty (kotoran)first press
Show verbatim quote (Table 5 (Agustus))
1 Agustus 286.221 10,76 30.797 89,24
Process defects (scrap and rework)Defect rate10.8 %Single extractor
dirty (kotoran)first press
Show verbatim quote (Table 5 (September))
2 September 273.539 10,58 28.940 89,42
Process defects (scrap and rework)Defect rate10.6 %Single extractor
dirty (kotoran)first press
Show verbatim quote (Table 5 (Oktober))
3 Oktober 434.209 11,39 49.456 88,61
Process defects (scrap and rework)Defect rate11.4 %Single extractor
dirty (kotoran)first press
Show verbatim quote (Table 5 (November))
4 November 391.254 9,89 38.695 90,11
Process defects (scrap and rework)Defect rate9.89 %Single extractor
dirty (kotoran)first press
Show verbatim quote (Table 5 (Desember))
5 Desember 478.645 9,83 47.051 90,17
Process defects (scrap and rework)Defect rate9.83 %Single extractor
—first press
Show verbatim quote (Table 4 (Agustus))
1 Agustus 286.221 0,08 42.663 53,67
noneThroughput286,221 kgSingle extractor
—first press
Show verbatim quote (Table 4 (September))
2 September 273.539 0,08 31.590 69,27
noneThroughput273,539 kgSingle extractor
—first press
Show verbatim quote (Table 4 (Oktober))
3 Oktober 434.209 0,08 41.769 83,16
noneThroughput434,209 kgSingle extractor
—first press
Show verbatim quote (Table 4 (November))
4 November 391.254 0,08 32.682 95,77
noneThroughput391,254 kgSingle extractor
—first press
Show verbatim quote (Table 4 (Desember))
5 Desember 478.645 0,08 42.960 89.13
noneThroughput478,645 kgSingle extractor

Observation units

  • First Press machine (stasiun KCP) · Separation (centrifugation, filtration, membranes) · Baseline