foratvise
Get Started
Included study

PERBAIKAN SISTEM PERAWATAN MESIN PADA PT XYZ

Open source

1Bibliographic record

Authors
Tiara Rahmania, Abdul Rahim Matondang, Nazaruddin Matondang
Year
2018
Venue
Jurnal Sistem Teknik Industri
Country
Indonesia
Segment
Animal feed and pet food
Process family
Whole plant or unspecified
Study type
Single case study
Extraction scope
Full text
Size
1 plants · — lines · — machines
Observation period
630 days
Data collection
maintenance_records
Intervention
Show the setting as described by the study
PT XYZ merupakan perusahaan yang bergerak dalam industri pakan ternak.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
kerusakan mesin
Show verbatim quote (Section 1, Pendahuluan)
Downtime yang terjadi di PT XYZ selama 2014 sampai Oktober 2015 rata-rata per bulan sebesar 11,21% atau 43,05 jam.
Equipment failure (breakdowns)Share of lost time11.2 %Single extractor
kerusakan mesin
Show verbatim quote (Section 1, Pendahuluan)
Downtime yang terjadi di PT XYZ selama 2014 sampai Oktober 2015 rata-rata per bulan sebesar 11,21% atau 43,05 jam.
Equipment failure (breakdowns)Lost time43.1 jam/bulanSingle extractor

Observation units

  • PT XYZ (keseluruhan proses produksi) · Whole line or unspecified equipment · Baseline