Included study
Integration of Sustainable Value Stream Mapping (Sus. VSM) and Life-Cycle Assessment (LCA) to Improve Sustainability Performance
1Bibliographic record
- Authors
- Taufik Djatna, Dwi Prasetyo
- Year
- 2019
- Venue
- International Journal on Advanced Science Engineering and Information Technology
- Country
- —
- Segment
- Food manufacturing (unspecified or mixed)
- Process family
- Whole plant or unspecified
- Study type
- Single case study
- Extraction scope
- Abstract only
- Size
- 1 plants · — lines · — machines
- Observation period
- —
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
In this work, a proposed Sustainable Value Stream Mapping (Sus-VSM) as an extended traditional VSM considers integration with Life-Cycle Assessment (LCA) to assess current condition in addition to analyze future sustainability improvement at a food based manufacturing.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 1High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?The setting cannot be classified beyond "a food company". | 0 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Only post-intervention or only "best period" results are reported. | 0 / 2 |
| Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%. | 0 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—filling area machineryShow verbatim quote (abstract)total defect product from 4.85/batch to 2.82 kg/batch | Process defects (scrap and rework) | Defect rate | 4.85 /batch | Single extractor |
cleaning timeShow verbatim quote (abstract)cleaning time from 2.8 hours to 2.14 hours | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 2.80 hours | Single extractor |
Observation units
- Current state (filling/cooking/cleaning process) · Whole line or unspecified equipment · Baseline

