In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 58 % of the line's lost time. Reported by 4 of the 127 studies that could observe it (limited evidence).

What happens

The line is stopped so operators or a cleaning crew can wash, rinse, disinfect or wipe down equipment and the production area between runs or at scheduled intervals, including travel to a cleaning station and pre-cleaning preparation; this time is lost to production even though it may be required by hygiene procedures.

What is done about it

Standardize and streamline cleaning procedures (e.g., CIP skids, pre-staged supplies, optimized routes to cleaning areas) to shorten the cycle, schedule cleaning to overlap with other planned downtime where feasible, and track cleaning duration against a target to drive continuous reduction.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
1.0% [0.3–2.3%]
Expected share of lost time
0.6% [0.1–1.4%]
Share of lost time when present
58% [47–69%]
Studies / units
127 / 161
Evidence grade
C

Grade C: 2 to 4 studies, or an interval wider than 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    1.5% [0.2–5.0%]13 studies
  • Soft drinks, bottled water and juices
    0.9% [0.1–2.9%]26 studies
  • Brewing, wine and spirits
    1.0% [0.1–3.3%]11 studies
  • Bakery and pasta
    1.0% [0.1–3.0%]24 studies
  • Meat, poultry and seafood
    1.1% [0.1–3.6%]9 studies
  • Fruit and vegetable processing
    1.1% [0.2–3.9%]7 studies
  • Grain and oilseed milling
    1.1% [0.1–3.7%]6 studies
  • Sugar and confectionery
    1.1% [0.1–3.6%]9 studies
  • Snacks, coffee, tea and other foods
    1.1% [0.1–3.6%]5 studies
  • Animal feed and pet food
    1.6% [0.2–5.6%]7 studies
  • Food manufacturing (unspecified or mixed)
    1.6% [0.2–5.5%]10 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The line is stopped so operators or a cleaning crew can wash, rinse, disinfect or wipe down equipment and the production area between runs or at scheduled intervals, including travel to a cleaning station and pre-cleaning preparation; this time is lost to production even though it may be required by hygiene procedures.

How it looks in SCADA data

Engineering guidance

SCADA/MES shows a sustained machine-state of stop or cleaning mode with no production counts, often recurring at shift boundaries or product changes, and may be logged as a dedicated downtime reason code labeled cleaning, pre-cleaning or cleaning breaks with duration tracked separately from mechanical fault codes.

Countermeasure

Engineering guidance

Standardize and streamline cleaning procedures (e.g., CIP skids, pre-staged supplies, optimized routes to cleaning areas) to shorten the cycle, schedule cleaning to overlap with other planned downtime where feasible, and track cleaning duration against a target to drive continuous reduction.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of lost time: 23.2 % · as reported: “Cleaning Breaks”
    Show verbatim quote
    Cleaning Breaks Minutes 79 23.23%
  2. Lost time: 79.0 min · as reported: “Cleaning Breaks”
    Show verbatim quote
    Cleaning Breaks 40 39 79
  3. Share of lost time: 45.1 % · as reported: “Total Down Time (Cleaning + Change Over)”
    Show verbatim quote
    Total Down Time 134 45.11%
  4. Lost time: 2.80 hours · as reported: “cleaning time”
    Show verbatim quote
    cleaning time from 2.8 hours to 2.14 hours
  5. Lost time: 4.78 jam · as reported: “Cleaning”
    Show verbatim quote
    Berdasarkan ujicoba, durasi cleaning menurun dari rata-rata 4,78 jam menjadi 3,75 jam atau berpotensi mengalami penurunan sebesar 21,55%.
  6. Lost time: 5.67 jam · as reported: “Cleaning”
    Show verbatim quote
    1 05/01/2026 07/01/26 21,2 40 3,00 5,67 38660
  7. Lost time: 4.67 jam · as reported: “Cleaning”
    Show verbatim quote
    2 07/01/2026 09/01/26 21,2 40 0,83 4,67 42884
  8. Lost time: 4.00 jam · as reported: “Cleaning”
    Show verbatim quote
    3 12/01/2026 14/01/26 21,2 40 2,25 4,00 40930
  9. Lost time: 5.52 jam · as reported: “Cleaning”
    Show verbatim quote
    4 14/01/2026 16/01/26 21,2 40 3,13 5,52 39181
  10. Lost time: 3.65 jam · as reported: “Cleaning”
    Show verbatim quote
    6 21/01/2026 23/01/26 21,2 40 1,17 3,65 42747
  11. Lost time: 5.25 jam · as reported: “Cleaning”
    Show verbatim quote
    7 26/01/2026 28/01/26 21,2 40 0,42 5,25 43266
  12. Lost time: 5.50 jam · as reported: “Cleaning”
    Show verbatim quote
    8 28/01/2026 30/01/26 21,2 40 0,92 5,50 42312
  13. Lost time: 123 min · as reported: “Total cleaning time”
    Show verbatim quote
    Total cleaning time 123.38 min 102.16 min -21.22 min
  14. Lost time: 102 min · as reported: “Total cleaning time”
    Show verbatim quote
    Total cleaning time 123.38 min 102.16 min -21.22 min
  15. Lost time: 17.4 min · as reported: “Total pre cleaning time”
    Show verbatim quote
    Total pre cleaning time 17.41 min 14.41 min -3.00 min
  16. Mean event duration: 0.890 min · as reported: “Go to cleaning room”
    Show verbatim quote
    Go to cleaning room 0.89 Internal External
  17. Lost time: 14.4 min · as reported: “Total pre cleaning time”
    Show verbatim quote
    Total pre cleaning time 17.41 min 14.41 min -3.00 min
  18. Lost time: 0.890 min · as reported: “Go to cleaning room”
    Show verbatim quote
    Go to cleaning room 0.89