Cleaning and sanitation downtime
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 58 % of the line's lost time. Reported by 4 of the 127 studies that could observe it (limited evidence).
What happens
The line is stopped so operators or a cleaning crew can wash, rinse, disinfect or wipe down equipment and the production area between runs or at scheduled intervals, including travel to a cleaning station and pre-cleaning preparation; this time is lost to production even though it may be required by hygiene procedures.
What is done about it
Standardize and streamline cleaning procedures (e.g., CIP skids, pre-staged supplies, optimized routes to cleaning areas) to shorten the cycle, schedule cleaning to overlap with other planned downtime where feasible, and track cleaning duration against a target to drive continuous reduction.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 1.0% [0.3–2.3%]
- Expected share of lost time
- 0.6% [0.1–1.4%]
- Share of lost time when present
- 58% [47–69%]
- Studies / units
- 127 / 161
- Evidence grade
- C
Grade C: 2 to 4 studies, or an interval wider than 0.35.
2Probability by segment
- Dairy products1.5% [0.2–5.0%]13 studies
- Soft drinks, bottled water and juices0.9% [0.1–2.9%]26 studies
- Brewing, wine and spirits1.0% [0.1–3.3%]11 studies
- Bakery and pasta1.0% [0.1–3.0%]24 studies
- Meat, poultry and seafood1.1% [0.1–3.6%]9 studies
- Fruit and vegetable processing1.1% [0.2–3.9%]7 studies
- Grain and oilseed milling1.1% [0.1–3.7%]6 studies
- Sugar and confectionery1.1% [0.1–3.6%]9 studies
- Snacks, coffee, tea and other foods1.1% [0.1–3.6%]5 studies
- Animal feed and pet food1.6% [0.2–5.6%]7 studies
- Food manufacturing (unspecified or mixed)1.6% [0.2–5.5%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe line is stopped so operators or a cleaning crew can wash, rinse, disinfect or wipe down equipment and the production area between runs or at scheduled intervals, including travel to a cleaning station and pre-cleaning preparation; this time is lost to production even though it may be required by hygiene procedures.
How it looks in SCADA data
Engineering guidanceSCADA/MES shows a sustained machine-state of stop or cleaning mode with no production counts, often recurring at shift boundaries or product changes, and may be logged as a dedicated downtime reason code labeled cleaning, pre-cleaning or cleaning breaks with duration tracked separately from mechanical fault codes.
Countermeasure
Engineering guidanceStandardize and streamline cleaning procedures (e.g., CIP skids, pre-staged supplies, optimized routes to cleaning areas) to shorten the cycle, schedule cleaning to overlap with other planned downtime where feasible, and track cleaning duration against a target to drive continuous reduction.
4Sources
- Investigation on a multiscale sustainable manufacturing approach to production changeover complexity reduction and its implementation through smart surfaces and process optimization (2022)Open sourceShare of lost time: 23.2 % · as reported: “Cleaning Breaks”
Show verbatim quote
Cleaning Breaks Minutes 79 23.23%
- Investigation on a multiscale sustainable manufacturing approach to production changeover complexity reduction and its implementation through smart surfaces and process optimization (2022)Open sourceLost time: 79.0 min · as reported: “Cleaning Breaks”
Show verbatim quote
Cleaning Breaks 40 39 79
- Investigation on a multiscale sustainable manufacturing approach to production changeover complexity reduction and its implementation through smart surfaces and process optimization (2022)Open sourceShare of lost time: 45.1 % · as reported: “Total Down Time (Cleaning + Change Over)”
Show verbatim quote
Total Down Time 134 45.11%
- Integration of Sustainable Value Stream Mapping (Sus. VSM) and Life-Cycle Assessment (LCA) to Improve Sustainability Performance (2019)Open sourceLost time: 2.80 hours · as reported: “cleaning time”
Show verbatim quote
cleaning time from 2.8 hours to 2.14 hours
- Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy (2026)Open sourceLost time: 4.78 jam · as reported: “Cleaning”
Show verbatim quote
Berdasarkan ujicoba, durasi cleaning menurun dari rata-rata 4,78 jam menjadi 3,75 jam atau berpotensi mengalami penurunan sebesar 21,55%.
- Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy (2026)Open sourceLost time: 5.67 jam · as reported: “Cleaning”
Show verbatim quote
1 05/01/2026 07/01/26 21,2 40 3,00 5,67 38660
- Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy (2026)Open sourceLost time: 4.67 jam · as reported: “Cleaning”
Show verbatim quote
2 07/01/2026 09/01/26 21,2 40 0,83 4,67 42884
- Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy (2026)Open sourceLost time: 4.00 jam · as reported: “Cleaning”
Show verbatim quote
3 12/01/2026 14/01/26 21,2 40 2,25 4,00 40930
- Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy (2026)Open sourceLost time: 5.52 jam · as reported: “Cleaning”
Show verbatim quote
4 14/01/2026 16/01/26 21,2 40 3,13 5,52 39181
- Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy (2026)Open sourceLost time: 3.65 jam · as reported: “Cleaning”
Show verbatim quote
6 21/01/2026 23/01/26 21,2 40 1,17 3,65 42747
- Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy (2026)Open sourceLost time: 5.25 jam · as reported: “Cleaning”
Show verbatim quote
7 26/01/2026 28/01/26 21,2 40 0,42 5,25 43266
- Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy (2026)Open sourceLost time: 5.50 jam · as reported: “Cleaning”
Show verbatim quote
8 28/01/2026 30/01/26 21,2 40 0,92 5,50 42312
- Production Management Model Based on Lean Manufacturing Tools and SLP to Increase Productivity in a Meatball (BARF) Plant (2026)Open sourceLost time: 123 min · as reported: “Total cleaning time”
Show verbatim quote
Total cleaning time 123.38 min 102.16 min -21.22 min
- Production Management Model Based on Lean Manufacturing Tools and SLP to Increase Productivity in a Meatball (BARF) Plant (2026)Open sourceLost time: 102 min · as reported: “Total cleaning time”
Show verbatim quote
Total cleaning time 123.38 min 102.16 min -21.22 min
- Production Management Model Based on Lean Manufacturing Tools and SLP to Increase Productivity in a Meatball (BARF) Plant (2026)Open sourceLost time: 17.4 min · as reported: “Total pre cleaning time”
Show verbatim quote
Total pre cleaning time 17.41 min 14.41 min -3.00 min
- Production Management Model Based on Lean Manufacturing Tools and SLP to Increase Productivity in a Meatball (BARF) Plant (2026)Open sourceMean event duration: 0.890 min · as reported: “Go to cleaning room”
Show verbatim quote
Go to cleaning room 0.89 Internal External
- Production Management Model Based on Lean Manufacturing Tools and SLP to Increase Productivity in a Meatball (BARF) Plant (2026)Open sourceLost time: 14.4 min · as reported: “Total pre cleaning time”
Show verbatim quote
Total pre cleaning time 17.41 min 14.41 min -3.00 min
- Production Management Model Based on Lean Manufacturing Tools and SLP to Increase Productivity in a Meatball (BARF) Plant (2026)Open sourceLost time: 0.890 min · as reported: “Go to cleaning room”
Show verbatim quote
Go to cleaning room 0.89