foratvise
Get Started
Included study

TRIZ and Lean Philosophies Applied Together in Management Activities

Open source

1Bibliographic record

Authors
Teresa Margarida Pinto Ribeiro Morgado, Jorge Miguel Chaves Sandiães, Helena V. G. Navas
Year
2019
Venue
Quality Innovation Prosperity
Country
Portugal
Segment
Brewing, wine and spirits
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 9 machines
Observation period
—
Data collection
not_reported
Intervention
Show the setting as described by the study
The development of this work was performed in a can filling line of 33 cl and 37.5 cl, having the filling capacity of 60,000 cans per hour.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Product Exchange (Refrigerant)
Show verbatim quote (Table 5)
Product Exchange (Refrigerant) 66.1 27.0 59.1
Setup and adjustmentsMean event duration66.1 minSingle extractor
Product Exchange (Beer)
Show verbatim quote (Table 5)
Product Exchange (Beer) 19.7 6.0 69.5
Setup and adjustmentsMean event duration19.7 minSingle extractor
Format Exchange (Hs Mp For P12p)
Show verbatim quote (Table 5)
Format Exchange (Hs Mp For P12p) 89.3 35.9 59.8
Setup and adjustmentsMean event duration89.3 minSingle extractor
Product Exchange (Refrigerant)
Show verbatim quote (Table 5)
Product Exchange (Refrigerant) 66.1 27.0 59.1
Setup and adjustmentsMean event duration27.0 minSingle extractor
Product Exchange (Beer)
Show verbatim quote (Table 5)
Product Exchange (Beer) 19.7 6.0 69.5
Setup and adjustmentsMean event duration6.00 minSingle extractor
Format Exchange (Hs Mp For P12p)
Show verbatim quote (Table 5)
Format Exchange (Hs Mp For P12p) 89.3 35.9 59.8
Setup and adjustmentsMean event duration35.9 minSingle extractor

Observation units

  • Line 94 filling line · Whole line or unspecified equipment · Baseline
  • Line 94 filling line · Whole line or unspecified equipment · After intervention