Included study
Aplicação do overall equipment effectiveness no sistema produtivo de uma vinícola
1Bibliographic record
- Authors
- Pedro Vieira Souza Santos
- Year
- 2019
- Venue
- Navus - Revista de Gestão e Tecnologia
- Country
- Brazil
- Segment
- Brewing, wine and spirits
- Process family
- Whole plant or unspecified
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 3 machines
- Observation period
- 28 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
A pesquisa foi realizada em uma empresa do setor vinícola, localizada na Região Administrativa Integrada de Desenvolvimento (RIDE) em Pernambuco, no Vale do São Francisco.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—máquina de envase nº 02Show verbatim quote (Section 4.2 Cálculo dos índices)µ3 = (541 - 25) / 541 µ3 = 95,34 % | none | Quality | 95.3 % | Both extractors agreed |
—máquina de envase nº 01Show verbatim quote (Section 4.2 Cálculo dos índices)µ3 = (541 - 33) / 541 µ3 = 93,90 % | none | Quality | 93.9 % | Both extractors agreed |
—prensaShow verbatim quote (Section 4.2 Cálculo dos índices)µ3 = (541 - 28) / 541 µ3 = 94,82 % | none | Quality | 94.8 % | Both extractors agreed |
—máquina de envase nº 02Show verbatim quote (Section 4.2 Cálculo dos índices)µ2 = 365 / 450 µ2 = 81,11 % | none | Performance | 81.1 % | Both extractors agreed |
—máquina de envase nº 01Show verbatim quote (Section 4.2 Cálculo dos índices)µ2 = 379 / 450 µ2 = 84,22 % | none | Performance | 84.2 % | Both extractors agreed |
—prensaShow verbatim quote (Section 4.2 Cálculo dos índices)µ2 = 422 / 450 µ2 = 93,77 % | none | Performance | 93.8 % | Both extractors agreed |
—prensaShow verbatim quote (Tabela 2 – Valor do OEE por equipamento)1 93,88 93,77 94,82 83,47 Muito bom | none | OEE | 83.5 % | Both extractors agreed |
—prensaShow verbatim quote (Section 4.2 Cálculo dos índices)µ 1 = (360 - 22) / 360 µ 1 = 93,88 % | none | Availability | 93.9 % | Single extractor |
paradas não planejadasprensaShow verbatim quote (Section 4.2 Cálculo dos índices)µ 1 = (TPP – TPnP)/TPP µ 1 = (360 - 22) / 360 µ 1 = 93,88 % | Not classifiable from the report | Lost time | 22.0 min | Single extractor |
—máquina de envase nº 01Show verbatim quote (Section 4.2 Cálculo dos índices)µ 1 = (360 - 45) / 360 µ 1 = 87,50 % | none | Availability | 87.5 % | Single extractor |
—máquina de envase nº 01Show verbatim quote (Tabela 2 – Valor do OEE por equipamento)2 87,50 84,22 93,90 69,19 Bom | none | OEE | 69.2 % | Single extractor |
paradas não planejadasmáquina de envase nº 01Show verbatim quote (Section 4.2 Cálculo dos índices)µ 1 = (TPP – TPnP)/TPP µ 1 = (360 - 45) / 360 µ 1 = 87,50 % | Not classifiable from the report | Lost time | 45.0 min | Single extractor |
—máquina de envase nº 02Show verbatim quote (Section 4.2 Cálculo dos índices)µ 1 = (360 - 37) / 360 µ 1 = 89,72 % | none | Availability | 89.7 % | Single extractor |
—máquina de envase nº 02Show verbatim quote (Tabela 2 – Valor do OEE por equipamento)3 89,72 81,11 95,34 69,38 Bom | none | OEE | 69.4 % | Single extractor |
paradas não planejadasmáquina de envase nº 02Show verbatim quote (Section 4.2 Cálculo dos índices)µ 1 = (TPP – TPnP)/TPP µ 1 = (360 - 37) / 360 µ 1 = 89,72 % | Not classifiable from the report | Lost time | 37.0 min | Single extractor |
Observation units
- Equipamento 03 - Máquina de envase nº 02 · Filling · Baseline
- Equipamento 02 - Máquina de envase nº 01 · Filling · Baseline
- Equipamento 01 - Prensa · Separation (centrifugation, filtration, membranes) · Baseline