Included study
APLIKASI OVERALL EQUIPMENT EFFECTIVENESS (OEE) DALAM UPAYA MENGATASI TINGGINYA DOWNTIME PADA STASIUN KETEL DI PG X JAWA TIMUR
1Bibliographic record
- Authors
- Mahros Darsin
- Year
- 2020
- Venue
- MULTITEK INDONESIA
- Country
- Indonesia
- Segment
- Sugar and confectionery
- Process family
- Slaughter, cutting and primary processing
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 180 days
- Data collection
- maintenance_records
- Intervention
Show the setting as described by the study
PG X in Jember is one of the agro-industries that processing sugar cane into sugar crystals.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 15Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
Breakdown lossesbagasse conveyor chainShow verbatim quote (Tabel 4)Breakdown losses 0.0192 12.5% 94% | Equipment failure (breakdowns) | Share of lost time | 12.5 % | Both extractors agreed |
Reduce speed lossesbagasse conveyor chainShow verbatim quote (Tabel 4)Reduce speed losses 0.0711 46.2% 46.2% | Reduced speed | Share of lost time | 46.2 % | Both extractors agreed |
Idle and minorbagasse conveyor chainShow verbatim quote (Tabel 4)Idle and minor 0.01 6.5% 100% | Idling and minor stops (micro-stops) | Share of lost time | 6.50 % | Both extractors agreed |
—bagasse conveyor chainShow verbatim quote (Tabel 2)Mei 93.12% 99.45% 100% 91.93% | none | Performance | 99.5 % | Both extractors agreed |
—bagasse conveyor chainShow verbatim quote (Tabel 2)Mei 93.12% 99.45% 100% 91.93% | none | Availability | 93.1 % | Both extractors agreed |
—bagasse conveyor chainShow verbatim quote (Tabel 2)September 98.53% 99.97% 100% 98.46% | none | Performance | 100.0 % | Both extractors agreed |
—bagasse conveyor chainShow verbatim quote (Tabel 2)September 98.53% 99.97% 100% 98.46% | none | Availability | 98.5 % | Both extractors agreed |
—bagasse conveyor chainShow verbatim quote (Tabel 2)Juli 90.89% 98.99% 100% 89.98% | none | Performance | 99.0 % | Both extractors agreed |
—bagasse conveyor chainShow verbatim quote (Tabel 2)Juni 94.89% 71.94% 100% 68.27% | none | Performance | 71.9 % | Both extractors agreed |
—bagasse conveyor chainShow verbatim quote (Tabel 2)Juli 90.89% 98.99% 100% 89.98% | none | Availability | 90.9 % | Both extractors agreed |
—bagasse conveyor chainShow verbatim quote (Tabel 2)Juni 94.89% 71.94% 100% 68.27% | none | Availability | 94.9 % | Both extractors agreed |
Startup defectbagasse conveyor chainShow verbatim quote (Tabel 3)Rata-rata 1.92% 5.36% 1% 7.11% 0 0 | Start-up losses (reduced yield) | Share of planned time | 0 % | Both extractors agreed |
Defect lossesbagasse conveyor chainShow verbatim quote (Tabel 3)Rata-rata 1.92% 5.36% 1% 7.11% 0 0 | Process defects (scrap and rework) | Share of planned time | 0 % | Both extractors agreed |
Reduce speed lossesbagasse conveyor chainShow verbatim quote (Tabel 3)Rata-rata 1.92% 5.36% 1% 7.11% 0 0 | Reduced speed | Share of planned time | 7.11 % | Both extractors agreed |
Idle and minorbagasse conveyor chainShow verbatim quote (Tabel 3)Rata-rata 1.92% 5.36% 1% 7.11% 0 0 | Idling and minor stops (micro-stops) | Share of planned time | 1.00 % | Both extractors agreed |
Setup and adjustmentbagasse conveyor chainShow verbatim quote (Tabel 3)Rata-rata 1.92% 5.36% 1% 7.11% 0 0 | Setup and adjustments | Share of planned time | 5.36 % | Both extractors agreed |
Breakdown lossesbagasse conveyor chainShow verbatim quote (Tabel 3)Rata-rata 1.92% 5.36% 1% 7.11% 0 0 | Equipment failure (breakdowns) | Share of planned time | 1.92 % | Both extractors agreed |
—bagasse conveyor chainShow verbatim quote (Tabel 2)Oktober 85.02% 91.81% 100% 78.06% | none | Performance | 91.8 % | Both extractors agreed |
—bagasse conveyor chainShow verbatim quote (Tabel 2)Agustus 94.35% 91.89% 100% 86.70% | none | Performance | 91.9 % | Both extractors agreed |
—bagasse conveyor chainShow verbatim quote (Tabel 2)Oktober 85.02% 91.81% 100% 78.06% | none | Availability | 85.0 % | Both extractors agreed |
—bagasse conveyor chainShow verbatim quote (Tabel 2)Agustus 94.35% 91.89% 100% 86.70% | none | Availability | 94.4 % | Both extractors agreed |
—bagasse conveyor chainShow verbatim quote (Results text)Untuk quality, semua diberi nilai 100% karena ketika penyaluran bahan bakar ke boiler tidak ada produk cacat. | none | Quality | 100 % | Both extractors agreed |
—bagasse conveyor chainShow verbatim quote (Results text)Rata-rata OEE selama enam bulan adalah 85.57%. | none | OEE | 85.6 % | Single extractor |
—bagasse conveyor chainShow verbatim quote (Tabel 1)Mei 18.17 264 15525.889 | Not classifiable from the report | Lost time | 18.2 jam | Single extractor |
—bagasse conveyor chainShow verbatim quote (Tabel 1)Juni 29.42 720 23909.813 | Not classifiable from the report | Lost time | 29.4 jam | Single extractor |
—bagasse conveyor chainShow verbatim quote (Tabel 1)Juli 67.75 744 53733.472 | Not classifiable from the report | Lost time | 67.8 jam | Single extractor |
—bagasse conveyor chainShow verbatim quote (Tabel 1)Agu 39.33 744 51019.920 | Not classifiable from the report | Lost time | 39.3 jam | Single extractor |
—bagasse conveyor chainShow verbatim quote (Tabel 1)Sep 10.58 720 44151.314 | Not classifiable from the report | Lost time | 10.6 jam | Single extractor |
—bagasse conveyor chainShow verbatim quote (Tabel 1)Okt 107.83 720 29448.068 | Not classifiable from the report | Lost time | 108 jam | Single extractor |
Setup and adjustmentbagasse conveyor chainShow verbatim quote (Tabel 4)Setup and adjustment 0.0536 35% 81% | Setup and adjustments | Share of lost time | 35.0 % | Single extractor |
Defect lossesbagasse conveyor chainShow verbatim quote (Tabel 4)Defect losses 0 0 100% | Process defects (scrap and rework) | Share of lost time | 0 % | Single extractor |
Startup defectbagasse conveyor chainShow verbatim quote (Tabel 4)Startup defect 0 0 100% | Start-up losses (reduced yield) | Share of lost time | 0 % | Single extractor |
—Show verbatim quote (Table 2)Mei | 93.12% | 99.45% | 100% | 91.93% | none | Quality | 100 % | Single extractor |
—Show verbatim quote (Table 2)Mei | 93.12% | 99.45% | 100% | 91.93% | none | OEE | 91.9 % | Single extractor |
—Show verbatim quote (Table 2)Juni | 94.89% | 71.94% | 100% | 68.27% | none | OEE | 68.3 % | Single extractor |
—Show verbatim quote (Table 2)Juli | 90.89% | 98.99% | 100% | 89.98% | none | OEE | 90.0 % | Single extractor |
—Show verbatim quote (Table 2)Agustus | 94.35% | 91.89% | 100% | 86.70% | none | OEE | 86.7 % | Single extractor |
—Show verbatim quote (Table 2)September | 98.53% | 99.97% | 100% | 98.46% | none | OEE | 98.5 % | Single extractor |
—Show verbatim quote (Table 2)Oktober | 85.02% | 91.81% | 100% | 78.06% | none | OEE | 78.1 % | Single extractor |
Observation units
- Bagasse conveyor chain (stasiun ketel) · Conveying and accumulation · Baseline
- Bagasse conveyor · Conveying and accumulation · Baseline