1Bibliographic record

Authors
Demi Ramadian
Year
2022
Venue
Go-Integratif Jurnal Teknik Sistem dan Industri
Country
Indonesia
Segment
Grain and oilseed milling
Process family
Slaughter, cutting and primary processing
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
61 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
PT Bintara Tani Nusantara merupakan suatu perusahaan manufaktur yang bergerak dibidang industri Pengelolahan Kelapa Sawit.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—screw press
Show verbatim quote (Analisis section, p.44)
Dengan nilai availability, performance, dan quality tersebut didapat nilai OEE dengan rentang nilai 29,79% hingga 56,87% dan nilai rata-ratanya adalah 45,55%.
noneOEE45.6 %Both extractors agreed
—screw press
Show verbatim quote (Analisis section, p.44)
Untuk nilai quality dari mesin press didapat nilai 100%.
noneQuality100 %Both extractors agreed
—screw press
Show verbatim quote (Analisis section, p.44)
nilai performance dari mesin press dengan rentang nilai 33,42% sampai 64,12% dan dengan nilai rata-rata 51,49%
nonePerformance51.5 %Both extractors agreed
—screw press
Show verbatim quote (Analisis section, p.44)
diperoleh nilai availability dari mesin press dengan rentang nilai 84,78% sampai 90,76% dengan rata-rata nilai availability sebesar 88,44%
noneAvailability88.4 %Both extractors agreed
Breakdownscrew press
Show verbatim quote (Tabel 2)
1–6 Maret 8640 420 360 480 1166,01 0 1166,01
Equipment failure (breakdowns)Lost time420 menitSingle extractor
Planned downtimescrew press
Show verbatim quote (Tabel 2)
1–6 Maret 8640 420 360 480 1166,01 0 1166,01
Planned downtime (scheduled maintenance, breaks, no demand)Lost time360 menitSingle extractor
Set upscrew press
Show verbatim quote (Tabel 2)
1–6 Maret 8640 420 360 480 1166,01 0 1166,01
Setup and adjustmentsLost time480 menitSingle extractor
Breakdownscrew press
Show verbatim quote (Tabel 2)
8–13 Maret 7200 390 300 420 961,76 0 961,76
Equipment failure (breakdowns)Lost time390 menitSingle extractor
Planned downtimescrew press
Show verbatim quote (Tabel 2)
8–13 Maret 7200 390 300 420 961,76 0 961,76
Planned downtime (scheduled maintenance, breaks, no demand)Lost time300 menitSingle extractor
Set upscrew press
Show verbatim quote (Tabel 2)
8–13 Maret 7200 390 300 420 961,76 0 961,76
Setup and adjustmentsLost time420 menitSingle extractor
Breakdownscrew press
Show verbatim quote (Tabel 2)
15–20 Maret 8640 450 360 540 1043,31 0 1043,31
Equipment failure (breakdowns)Lost time450 menitSingle extractor
Set upscrew press
Show verbatim quote (Tabel 2)
15–20 Maret 8640 450 360 540 1043,31 0 1043,31
Setup and adjustmentsLost time540 menitSingle extractor
Set upscrew press
Show verbatim quote (Tabel 2)
22–27 Maret 7200 390 300 390 1154,16 0 1154,16
Setup and adjustmentsLost time390 menitSingle extractor
Breakdownscrew press
Show verbatim quote (Tabel 2)
29–3 April 5760 240 240 330 782,6 0 782,6
Equipment failure (breakdowns)Lost time240 menitSingle extractor
Planned downtimescrew press
Show verbatim quote (Tabel 2)
29–3 April 5760 240 240 330 782,6 0 782,6
Planned downtime (scheduled maintenance, breaks, no demand)Lost time240 menitSingle extractor
Set upscrew press
Show verbatim quote (Tabel 2)
29–3 April 5760 240 240 330 782,6 0 782,6
Setup and adjustmentsLost time330 menitSingle extractor
Breakdownscrew press
Show verbatim quote (Tabel 2)
5–10 April 7200 300 300 450 601,64 0 601,64
Equipment failure (breakdowns)Lost time300 menitSingle extractor
Set upscrew press
Show verbatim quote (Tabel 2)
5–10 April 7200 300 300 450 601,64 0 601,64
Setup and adjustmentsLost time450 menitSingle extractor
Breakdownscrew press
Show verbatim quote (Tabel 2)
12–17 April 7200 360 240 510 867,39 0 867,39
Equipment failure (breakdowns)Lost time360 menitSingle extractor
Set upscrew press
Show verbatim quote (Tabel 2)
12–17 April 7200 360 240 510 867,39 0 867,39
Setup and adjustmentsLost time510 menitSingle extractor
Set upscrew press
Show verbatim quote (Tabel 2)
19–24 April 5760 240 240 270 805,98 0 805,98
Setup and adjustmentsLost time270 menitSingle extractor
Breakdownscrew press
Show verbatim quote (Tabel 2)
26–30 April 5760 480 240 360 744,24 0 744,24
Equipment failure (breakdowns)Lost time480 menitSingle extractor
Set upscrew press
Show verbatim quote (Tabel 2)
26–30 April 5760 480 240 360 744,24 0 744,24
Setup and adjustmentsLost time360 menitSingle extractor

Observation units

  • Mesin screw press · Separation (centrifugation, filtration, membranes) · Baseline