It appears in about 2 of every 100 lines studied.
When it appears, it takes on average about 57 % of the line's lost time. Reported by 2 of the 37 studies that could observe it (limited evidence).
What happens
The primary study logs stop time on the screw press under generic labels such as set up, breakdown, downtime, planned downtime or dirty without separating the underlying physical or organisational mechanism, so the same bucket mixes changeovers, mechanical failures, scheduled maintenance and hygiene-related stops. Because the reason code is not disaggregated at source, the cluster cannot be tied to a single failure mode or adjustment task.
What is done about it
Implement a structured, mutually exclusive downtime reason-code taxonomy at the press HMI that forces the operator to separate changeover, mechanical failure, scheduled maintenance and hygiene stops at the moment they occur, and audit the coding periodically for consistency. This reclassification enables the loss to be routed to the correct six-big-losses category for targeted root-cause analysis.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 1.5% [0.3–4.2%]
- Expected share of lost time
- 0.9% [0.2–2.4%]
- Share of lost time when present
- 57% [45–68%]
- Studies / units
- 37 / 44
- Evidence grade
- C
Grade C: 2 to 4 studies, or an interval wider than 0.35.
2Probability by segment
- Dairy products1.7% [0.2–6.5%]5 studies
- Soft drinks, bottled water and juices1.8% [0.2–6.6%]1 study
- Brewing, wine and spirits1.8% [0.2–6.6%]1 study
- Bakery and pasta1.8% [0.2–7.2%]0 studies
- Meat, poultry and seafood1.7% [0.2–6.7%]2 studies
- Fruit and vegetable processing1.7% [0.2–6.6%]3 studies
- Grain and oilseed milling3.6% [0.4–12.6%]6 studies
- Sugar and confectionery1.7% [0.2–6.5%]3 studies
- Snacks, coffee, tea and other foods1.6% [0.2–5.8%]4 studies
- Animal feed and pet food1.6% [0.2–5.5%]5 studies
- Food manufacturing (unspecified or mixed)1.7% [0.2–6.1%]7 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe primary study logs stop time on the screw press under generic labels such as set up, breakdown, downtime, planned downtime or dirty without separating the underlying physical or organisational mechanism, so the same bucket mixes changeovers, mechanical failures, scheduled maintenance and hygiene-related stops. Because the reason code is not disaggregated at source, the cluster cannot be tied to a single failure mode or adjustment task.
How it looks in SCADA data
Engineering guidanceDowntime counters or state logs for the press show a single aggregated stop-time tag covering several reason codes, with no consistent correlation to a specific alarm, sensor pattern or maintenance work order; equivalent stop durations appear under different labels across shifts or batches. The lack of a dedicated digital reason code makes it impossible to isolate a repeatable SCADA signature.
Countermeasure
Engineering guidanceImplement a structured, mutually exclusive downtime reason-code taxonomy at the press HMI that forces the operator to separate changeover, mechanical failure, scheduled maintenance and hygiene stops at the moment they occur, and audit the coding periodically for consistency. This reclassification enables the loss to be routed to the correct six-big-losses category for targeted root-cause analysis.
4Sources
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 420 menit · as reported: “Breakdown”
Show verbatim quote
1–6 Maret 8640 420 360 480 1166,01 0 1166,01
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 360 menit · as reported: “Planned downtime”
Show verbatim quote
1–6 Maret 8640 420 360 480 1166,01 0 1166,01
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 480 menit · as reported: “Set up”
Show verbatim quote
1–6 Maret 8640 420 360 480 1166,01 0 1166,01
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 390 menit · as reported: “Breakdown”
Show verbatim quote
8–13 Maret 7200 390 300 420 961,76 0 961,76
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 300 menit · as reported: “Planned downtime”
Show verbatim quote
8–13 Maret 7200 390 300 420 961,76 0 961,76
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 420 menit · as reported: “Set up”
Show verbatim quote
8–13 Maret 7200 390 300 420 961,76 0 961,76
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 450 menit · as reported: “Breakdown”
Show verbatim quote
15–20 Maret 8640 450 360 540 1043,31 0 1043,31
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 540 menit · as reported: “Set up”
Show verbatim quote
15–20 Maret 8640 450 360 540 1043,31 0 1043,31
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 390 menit · as reported: “Set up”
Show verbatim quote
22–27 Maret 7200 390 300 390 1154,16 0 1154,16
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 240 menit · as reported: “Breakdown”
Show verbatim quote
29–3 April 5760 240 240 330 782,6 0 782,6
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 240 menit · as reported: “Planned downtime”
Show verbatim quote
29–3 April 5760 240 240 330 782,6 0 782,6
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 330 menit · as reported: “Set up”
Show verbatim quote
29–3 April 5760 240 240 330 782,6 0 782,6
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 300 menit · as reported: “Breakdown”
Show verbatim quote
5–10 April 7200 300 300 450 601,64 0 601,64
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 450 menit · as reported: “Set up”
Show verbatim quote
5–10 April 7200 300 300 450 601,64 0 601,64
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 360 menit · as reported: “Breakdown”
Show verbatim quote
12–17 April 7200 360 240 510 867,39 0 867,39
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 510 menit · as reported: “Set up”
Show verbatim quote
12–17 April 7200 360 240 510 867,39 0 867,39
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 270 menit · as reported: “Set up”
Show verbatim quote
19–24 April 5760 240 240 270 805,98 0 805,98
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 480 menit · as reported: “Breakdown”
Show verbatim quote
26–30 April 5760 480 240 360 744,24 0 744,24
- Analisis Efektivitas Mesin Screw Press Menggunakan Metode Overall Equipment Effectiveness pada PT Bintara Tani Nusantara (2022)Open sourceLost time: 360 menit · as reported: “Set up”
Show verbatim quote
26–30 April 5760 480 240 360 744,24 0 744,24
- Evaluasi Kinerja Mesin Screw Press Melalui Penerapan Total Productive Maintenance (TPM) di Pabrik Kelapa Sawit PT. XYZ: Performance Evaluation of Screw Press Machine through the Implementation of Total Productive Maintenance (TPM) at Palm Oil Mill of PT. XYZ (2025)Open sourceDefect rate: 0.0140 % · as reported: “Dirty”
Show verbatim quote
Desember 43.500.000 0,07 34.140 89,19% 0,014 6.090 99,98%
- Evaluasi Kinerja Mesin Screw Press Melalui Penerapan Total Productive Maintenance (TPM) di Pabrik Kelapa Sawit PT. XYZ: Performance Evaluation of Screw Press Machine through the Implementation of Total Productive Maintenance (TPM) at Palm Oil Mill of PT. XYZ (2025)Open sourceLost time: 720 menit · as reported: “Downtime”
Show verbatim quote
November 25 36.000 3.000 33.000 720 32.280 97,81
- Evaluasi Kinerja Mesin Screw Press Melalui Penerapan Total Productive Maintenance (TPM) di Pabrik Kelapa Sawit PT. XYZ: Performance Evaluation of Screw Press Machine through the Implementation of Total Productive Maintenance (TPM) at Palm Oil Mill of PT. XYZ (2025)Open sourceLost time: 4,260 menit · as reported: “Downtime”
Show verbatim quote
Desember 28 40.320 1.920 38.400 4.260 34.140 88,90
- Evaluasi Kinerja Mesin Screw Press Melalui Penerapan Total Productive Maintenance (TPM) di Pabrik Kelapa Sawit PT. XYZ: Performance Evaluation of Screw Press Machine through the Implementation of Total Productive Maintenance (TPM) at Palm Oil Mill of PT. XYZ (2025)Open sourceLost time: 3,000 menit · as reported: “Planned Downtime”
Show verbatim quote
November 25 36.000 3.000 33.000 720 32.280 97,81
- Evaluasi Kinerja Mesin Screw Press Melalui Penerapan Total Productive Maintenance (TPM) di Pabrik Kelapa Sawit PT. XYZ: Performance Evaluation of Screw Press Machine through the Implementation of Total Productive Maintenance (TPM) at Palm Oil Mill of PT. XYZ (2025)Open sourceLost time: 1,920 menit · as reported: “Planned Downtime”
Show verbatim quote
Desember 28 40.320 1.920 38.400 4.260 34.140 88,90