ANALISA OVERALL EQUIPMENT EFFECTIVENESS PADA MESIN HAMMER MILL DI INDUSTRI RUMPUT LAUT

Open source

1Bibliographic record

Authors
Rifky Maulana Yusron, Moh. Jufrianto, Saiful Arif
Year
2022
Venue
STEAM Engineering
Country
Indonesia
Segment
Snacks, coffee, tea and other foods
Process family
Milling, extraction and separation
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
365 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
Mesin hammer mill pada industri pengolahan rumput laut, berfungsi untuk menghancurkan rumput laut kering menjadi ukuran mesh 18, 20, atau 25.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—hammer mill
Show verbatim quote (Simpulan (Conclusion))
Nilai OEE rata rata tahunannya adalah adalah 85,148%.
noneOEE85.1 %Both extractors agreed
Breakdown losseshammer mill
Show verbatim quote (Table 3)
Rata rata tahunan 2,73% 0,147% 15,214% 2,871% 1,565% 4,192%
Equipment failure (breakdowns)Share of planned time2.73 %Both extractors agreed
Speed Reduced losseshammer mill
Show verbatim quote (Table 3)
Rata rata tahunan 2,73% 0,147% 15,214% 2,871% 1,565% 4,192%
Reduced speedShare of planned time2.87 %Both extractors agreed
—hammer mill
Show verbatim quote (Table 2)
1. Januari 13.790 87,67% 85,47% 1,8144 1,550 99,03% 99,16% 86,09%
noneAvailability87.7 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
1. Januari 13.790 87,67% 85,47% 1,8144 1,550 99,03% 99,16% 86,09%
nonePerformance99.0 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
1. Januari 13.790 87,67% 85,47% 1,8144 1,550 99,03% 99,16% 86,09%
noneQuality99.2 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
1. Januari 13.790 87,67% 85,47% 1,8144 1,550 99,03% 99,16% 86,09%
noneOEE86.1 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
2. Februari 13.842 89,09% 84,62% 1,9042 1,611 96,26% 99,18% 85,06%
noneAvailability89.1 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
2. Februari 13.842 89,09% 84,62% 1,9042 1,611 96,26% 99,18% 85,06%
nonePerformance96.3 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
2. Februari 13.842 89,09% 84,62% 1,9042 1,611 96,26% 99,18% 85,06%
noneQuality99.2 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
2. Februari 13.842 89,09% 84,62% 1,9042 1,611 96,26% 99,18% 85,06%
noneOEE85.1 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
3. Maret 13.830 91,54% 84,83% 1,8775 1,592 90,25% 99,19% 81,94%
noneAvailability91.5 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
3. Maret 13.830 91,54% 84,83% 1,8775 1,592 90,25% 99,19% 81,94%
nonePerformance90.3 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
3. Maret 13.830 91,54% 84,83% 1,8775 1,592 90,25% 99,19% 81,94%
noneQuality99.2 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
3. Maret 13.830 91,54% 84,83% 1,8775 1,592 90,25% 99,19% 81,94%
noneOEE81.9 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
4. April 13.790 92,16% 86,47% 1,9422 1,679 93,82% 98,82% 85,46%
noneAvailability92.2 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
4. April 13.790 92,16% 86,47% 1,9422 1,679 93,82% 98,82% 85,46%
nonePerformance93.8 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
4. April 13.790 92,16% 86,47% 1,9422 1,679 93,82% 98,82% 85,46%
noneQuality98.8 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
4. April 13.790 92,16% 86,47% 1,9422 1,679 93,82% 98,82% 85,46%
noneOEE85.5 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
5. Mei 13.830 91,25% 84,37% 1,844 1,555 91,81% 98,77% 82,75%
noneAvailability91.3 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
5. Mei 13.830 91,25% 84,37% 1,844 1,555 91,81% 98,77% 82,75%
nonePerformance91.8 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
5. Mei 13.830 91,25% 84,37% 1,844 1,555 91,81% 98,77% 82,75%
noneQuality98.8 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
5. Mei 13.830 91,25% 84,37% 1,844 1,555 91,81% 98,77% 82,75%
noneOEE82.8 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
6. Juni 13.800 91,44% 84,90% 1,8798 1,596 96,99% 99,01% 87,81%
noneAvailability91.4 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
6. Juni 13.800 91,44% 84,90% 1,8798 1,596 96,99% 99,01% 87,81%
nonePerformance97.0 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
6. Juni 13.800 91,44% 84,90% 1,8798 1,596 96,99% 99,01% 87,81%
noneQuality99.0 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
6. Juni 13.800 91,44% 84,90% 1,8798 1,596 96,99% 99,01% 87,81%
noneOEE87.8 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
7. Juli 13.920 87,06% 85,54% 1,8709 1,600 99,15% 98,83% 85,32%
noneAvailability87.1 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
7. Juli 13.920 87,06% 85,54% 1,8709 1,600 99,15% 98,83% 85,32%
nonePerformance99.2 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
7. Juli 13.920 87,06% 85,54% 1,8709 1,600 99,15% 98,83% 85,32%
noneQuality98.8 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
7. Juli 13.920 87,06% 85,54% 1,8709 1,600 99,15% 98,83% 85,32%
noneOEE85.3 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
8. Agustus 13.950 84,37% 84,05% 1,8543 1,558 99,36% 98,66% 82,71%
noneAvailability84.4 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
8. Agustus 13.950 84,37% 84,05% 1,8543 1,558 99,36% 98,66% 82,71%
nonePerformance99.4 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
8. Agustus 13.950 84,37% 84,05% 1,8543 1,558 99,36% 98,66% 82,71%
noneQuality98.7 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
8. Agustus 13.950 84,37% 84,05% 1,8543 1,558 99,36% 98,66% 82,71%
noneOEE82.7 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
9. September 13.800 91,44% 84,90% 1,8798 1,596 97,47% 98,72% 88,00%
nonePerformance97.5 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
9. September 13.800 91,44% 84,90% 1,8798 1,596 97,47% 98,72% 88,00%
noneQuality98.7 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
9. September 13.800 91,44% 84,90% 1,8798 1,596 97,47% 98,72% 88,00%
noneOEE88.0 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
10. Oktober 13.950 87,09% 85,54% 1,8803 1,608 99,28% 98,84% 85,47%
noneAvailability87.1 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
10. Oktober 13.950 87,09% 85,54% 1,8803 1,608 99,28% 98,84% 85,47%
nonePerformance99.3 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
10. Oktober 13.950 87,09% 85,54% 1,8803 1,608 99,28% 98,84% 85,47%
noneQuality98.8 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
10. Oktober 13.950 87,09% 85,54% 1,8803 1,608 99,28% 98,84% 85,47%
noneOEE85.5 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
11. November 13.945 88,38% 84,69% 1,8819 1,593 98,36% 98,70% 85,81%
noneAvailability88.4 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
11. November 13.945 88,38% 84,69% 1,8819 1,593 98,36% 98,70% 85,81%
nonePerformance98.4 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
11. November 13.945 88,38% 84,69% 1,8819 1,593 98,36% 98,70% 85,81%
noneQuality98.7 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
11. November 13.945 88,38% 84,69% 1,8819 1,593 98,36% 98,70% 85,81%
noneOEE85.8 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
12. Desember 13.930 91,38% 84,33% 1,9171 1,616 94,58% 98,77% 85,37%
noneAvailability91.4 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
12. Desember 13.930 91,38% 84,33% 1,9171 1,616 94,58% 98,77% 85,37%
nonePerformance94.6 %Single extractor
—hammer mill
Show verbatim quote (Table 2)
12. Desember 13.930 91,38% 84,33% 1,9171 1,616 94,58% 98,77% 85,37%
noneOEE85.4 %Single extractor
Adjustment losseshammer mill
Show verbatim quote (Table 3)
Rata rata tahunan 2,73% 0,147% 15,214% 2,871% 1,565% 4,192%
Setup and adjustmentsShare of planned time0.147 %Single extractor
Idling and stop losseshammer mill
Show verbatim quote (Table 3)
Rata rata tahunan 2,73% 0,147% 15,214% 2,871% 1,565% 4,192%
Idling and minor stops (micro-stops)Share of planned time15.2 %Single extractor
Process defecthammer mill
Show verbatim quote (Table 3)
Rata rata tahunan 2,73% 0,147% 15,214% 2,871% 1,565% 4,192%
Process defects (scrap and rework)Share of planned time1.57 %Single extractor
Reduced Yieldhammer mill
Show verbatim quote (Table 3)
Rata rata tahunan 2,73% 0,147% 15,214% 2,871% 1,565% 4,192%
Start-up losses (reduced yield)Share of planned time4.19 %Single extractor

Observation units

  • Hammer mill · Milling and grinding · Baseline