Included study
Production Model Based On 5S And SLP To Improve Efficiency in A Food Industry Company
1Bibliographic record
- Authors
- Rodrigo Kohata Tirado, Santiago Morales Arce, Martin Fidel Collao-Diaz
- Year
- 2023
- Venue
- International Conference on Industrial Engineering and Operations Management (IEOM)
- Country
- Peru
- Segment
- Food manufacturing (unspecified or mixed)
- Process family
- Whole plant or unspecified
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- —
- Data collection
- questionnaire
- Intervention
Show the setting as described by the study
Increase the plant efficiency of the mayonnaise production line of a company in the food industry in Peru.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 6High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Table 4. KPIs initial phase)Efficiency | 44% | none | OEE | 44.0 % | Single extractor |
transfer and material handling delaysShow verbatim quote (Table 4. KPIs initial phase)Transfer Time (Minutes) | 94 – 109 | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 94.0 min | Single extractor |
Observation units
- Mayonnaise production line · Whole line or unspecified equipment · Baseline