Included study

Production Model Based On 5S And SLP To Improve Efficiency in A Food Industry Company

Open source

1Bibliographic record

Authors
Rodrigo Kohata Tirado, Santiago Morales Arce, Martin Fidel Collao-Diaz
Year
2023
Venue
International Conference on Industrial Engineering and Operations Management (IEOM)
Country
Peru
Segment
Food manufacturing (unspecified or mixed)
Process family
Whole plant or unspecified
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
—
Data collection
questionnaire
Intervention
Show the setting as described by the study
Increase the plant efficiency of the mayonnaise production line of a company in the food industry in Peru.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 6High risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Table 4. KPIs initial phase)
Efficiency | 44%
noneOEE44.0 %Single extractor
transfer and material handling delays
Show verbatim quote (Table 4. KPIs initial phase)
Transfer Time (Minutes) | 94 – 109
Organizational or external stops (material or personnel shortage, utilities outage)Lost time94.0 minSingle extractor

Observation units

  • Mayonnaise production line · Whole line or unspecified equipment · Baseline