Transfer and material handling delay
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 53 % of the line's lost time. Reported by 3 of the 127 studies that could observe it (limited evidence).
What happens
Work-in-process or materials wait at an intermediate staging point or handoff between two stages of the line because the receiving operation, conveyor, or handling resource (operator, forklift, AGV) is not immediately available to continue the transfer. The line segment idles briefly while material accumulates or is queued for pickup, without any mechanical failure occurring.
What is done about it
Increase buffer capacity or add intermediate accumulation at the handoff point, synchronize staffing or material-handling equipment schedules with line demand, and use pull signals or sensors to trigger timely pickup and transfer of staged material.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.9% [0.2–2.3%]
- Expected share of lost time
- 0.5% [0.1–1.2%]
- Share of lost time when present
- 53% [41–64%]
- Studies / units
- 127 / 161
- Evidence grade
- C
Grade C: 2 to 4 studies, or an interval wider than 0.35.
2Probability by segment
- Dairy products1.0% [0.1–3.5%]13 studies
- Soft drinks, bottled water and juices0.9% [0.1–2.8%]26 studies
- Brewing, wine and spirits1.0% [0.1–3.5%]11 studies
- Bakery and pasta1.3% [0.2–4.0%]24 studies
- Meat, poultry and seafood1.1% [0.1–3.7%]9 studies
- Fruit and vegetable processing1.6% [0.2–5.6%]7 studies
- Grain and oilseed milling1.1% [0.1–3.7%]6 studies
- Sugar and confectionery1.0% [0.1–3.5%]9 studies
- Snacks, coffee, tea and other foods1.1% [0.1–3.6%]5 studies
- Animal feed and pet food1.1% [0.1–3.9%]7 studies
- Food manufacturing (unspecified or mixed)1.6% [0.2–5.2%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceWork-in-process or materials wait at an intermediate staging point or handoff between two stages of the line because the receiving operation, conveyor, or handling resource (operator, forklift, AGV) is not immediately available to continue the transfer. The line segment idles briefly while material accumulates or is queued for pickup, without any mechanical failure occurring.
How it looks in SCADA data
Engineering guidanceShort idle or starved/blocked states appear at the upstream or downstream machine adjacent to the staging point, with buffer or accumulator occupancy signals showing material sitting without movement; cycle counters stop incrementing while no fault or alarm code is active. Pattern recurs intermittently and correlates with handling resource availability rather than equipment state.
Countermeasure
Engineering guidanceIncrease buffer capacity or add intermediate accumulation at the handoff point, synchronize staffing or material-handling equipment schedules with line demand, and use pull signals or sensors to trigger timely pickup and transfer of staged material.
4Sources
- Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT (2022)Open sourceLost time: 6.34 menit · as reported: “antrian proses ke sortasi & potong”
Show verbatim quote
antrian proses ke sortasi & potong 6,34 ✔ NVA
- Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT (2022)Open sourceLost time: 14.0 menit · as reported: “proses sortasi terhenti”
Show verbatim quote
proses sortasi terhenti 14,03 ✔ NVA
- Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT (2022)Open sourceLost time: 0.420 menit · as reported: “transportasi ke sortasi & potong”
Show verbatim quote
transportasi ke sortasi & potong 0,42 2 ✔ NNVA
- Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT (2022)Open sourceLost time: 0.250 menit · as reported: “transportasi ke pengecekan”
Show verbatim quote
transportasi ke pengecekan 0,25 1 ✔ NNVA
- Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT (2022)Open sourceLost time: 1.94 menit · as reported: “QC sortasi dan potong”
Show verbatim quote
QC sortasi dan potong 1,94 1 ✔ NNVA
- Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT (2022)Open sourceLost time: 0.370 menit · as reported: “pengiriman ke sortasi”
Show verbatim quote
pengiriman ke sortasi trolly 0,37 2 ✔ NNVA
- Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT (2022)Open sourceLost time: 5.00 menit · as reported: “transportasi ke sortasi final”
Show verbatim quote
transportasi ke sortasi final trolly 5,00 2 ✔ NNVA
- Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT (2022)Open sourceLost time: 2.24 menit · as reported: “QC sortasi final”
Show verbatim quote
QC sortasi final 2,24 1 ✔ NNVA
- Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT (2022)Open sourceLost time: 5.00 menit · as reported: “transportasi ke packing”
Show verbatim quote
transportasi ke packing Trolly 5,00 2 ✔ NNVA
- Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT (2022)Open sourceLost time: 6.34 min · as reported: “Antrian proses ke sortasi & potong”
Show verbatim quote
Antrian proses ke sortasi & potong 6,34
- Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT (2022)Open sourceLost time: 14.0 min · as reported: “Proses sortasi terhenti”
Show verbatim quote
Proses sortasi terhenti 14,03
- Production Model Based On 5S And SLP To Improve Efficiency in A Food Industry Company (2023)Open sourceLost time: 94.0 min · as reported: “transfer and material handling delays”
Show verbatim quote
Transfer Time (Minutes) | 94 – 109
- Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S (2026)Open sourceLost time: 3.02 min · as reported: “Transfer (intermediate staging and handoff delays)”
Show verbatim quote
Transfer | 3.02