Idling and minor stops (micro-stops)

Transfer and material handling delay

Idling and minor stops (micro-stops)PerformanceWhole line or unspecified equipment

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 53 % of the line's lost time. Reported by 3 of the 127 studies that could observe it (limited evidence).

What happens

Work-in-process or materials wait at an intermediate staging point or handoff between two stages of the line because the receiving operation, conveyor, or handling resource (operator, forklift, AGV) is not immediately available to continue the transfer. The line segment idles briefly while material accumulates or is queued for pickup, without any mechanical failure occurring.

What is done about it

Increase buffer capacity or add intermediate accumulation at the handoff point, synchronize staffing or material-handling equipment schedules with line demand, and use pull signals or sensors to trigger timely pickup and transfer of staged material.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.9% [0.2–2.3%]
Expected share of lost time
0.5% [0.1–1.2%]
Share of lost time when present
53% [41–64%]
Studies / units
127 / 161
Evidence grade
C

Grade C: 2 to 4 studies, or an interval wider than 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    1.0% [0.1–3.5%]13 studies
  • Soft drinks, bottled water and juices
    0.9% [0.1–2.8%]26 studies
  • Brewing, wine and spirits
    1.0% [0.1–3.5%]11 studies
  • Bakery and pasta
    1.3% [0.2–4.0%]24 studies
  • Meat, poultry and seafood
    1.1% [0.1–3.7%]9 studies
  • Fruit and vegetable processing
    1.6% [0.2–5.6%]7 studies
  • Grain and oilseed milling
    1.1% [0.1–3.7%]6 studies
  • Sugar and confectionery
    1.0% [0.1–3.5%]9 studies
  • Snacks, coffee, tea and other foods
    1.1% [0.1–3.6%]5 studies
  • Animal feed and pet food
    1.1% [0.1–3.9%]7 studies
  • Food manufacturing (unspecified or mixed)
    1.6% [0.2–5.2%]10 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Work-in-process or materials wait at an intermediate staging point or handoff between two stages of the line because the receiving operation, conveyor, or handling resource (operator, forklift, AGV) is not immediately available to continue the transfer. The line segment idles briefly while material accumulates or is queued for pickup, without any mechanical failure occurring.

How it looks in SCADA data

Engineering guidance

Short idle or starved/blocked states appear at the upstream or downstream machine adjacent to the staging point, with buffer or accumulator occupancy signals showing material sitting without movement; cycle counters stop incrementing while no fault or alarm code is active. Pattern recurs intermittently and correlates with handling resource availability rather than equipment state.

Countermeasure

Engineering guidance

Increase buffer capacity or add intermediate accumulation at the handoff point, synchronize staffing or material-handling equipment schedules with line demand, and use pull signals or sensors to trigger timely pickup and transfer of staged material.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 6.34 menit · as reported: “antrian proses ke sortasi & potong”
    Show verbatim quote
    antrian proses ke sortasi & potong 6,34 ✔ NVA
  2. Lost time: 14.0 menit · as reported: “proses sortasi terhenti”
    Show verbatim quote
    proses sortasi terhenti 14,03 ✔ NVA
  3. Lost time: 0.420 menit · as reported: “transportasi ke sortasi & potong”
    Show verbatim quote
    transportasi ke sortasi & potong 0,42 2 ✔ NNVA
  4. Lost time: 0.250 menit · as reported: “transportasi ke pengecekan”
    Show verbatim quote
    transportasi ke pengecekan 0,25 1 ✔ NNVA
  5. Lost time: 1.94 menit · as reported: “QC sortasi dan potong”
    Show verbatim quote
    QC sortasi dan potong 1,94 1 ✔ NNVA
  6. Lost time: 0.370 menit · as reported: “pengiriman ke sortasi”
    Show verbatim quote
    pengiriman ke sortasi trolly 0,37 2 ✔ NNVA
  7. Lost time: 5.00 menit · as reported: “transportasi ke sortasi final”
    Show verbatim quote
    transportasi ke sortasi final trolly 5,00 2 ✔ NNVA
  8. Lost time: 2.24 menit · as reported: “QC sortasi final”
    Show verbatim quote
    QC sortasi final 2,24 1 ✔ NNVA
  9. Lost time: 5.00 menit · as reported: “transportasi ke packing”
    Show verbatim quote
    transportasi ke packing Trolly 5,00 2 ✔ NNVA
  10. Lost time: 6.34 min · as reported: “Antrian proses ke sortasi & potong”
    Show verbatim quote
    Antrian proses ke sortasi & potong 6,34
  11. Lost time: 14.0 min · as reported: “Proses sortasi terhenti”
    Show verbatim quote
    Proses sortasi terhenti 14,03
  12. Lost time: 94.0 min · as reported: “transfer and material handling delays”
    Show verbatim quote
    Transfer Time (Minutes) | 94 – 109
  13. Lost time: 3.02 min · as reported: “Transfer (intermediate staging and handoff delays)”
    Show verbatim quote
    Transfer | 3.02