foratvise
Get Started
Included study

Model based on TPM to increase the overall efficiency of equipment in an oil company

Open source

1Bibliographic record

Authors
Jose Herrera-Uribe, Diana Rivero-Davila, Martin Saenz-Moron
Year
2023
Venue
LACCEI International Multi-Conference for Engineering, Education and Technology (LACCEI)
Country
Peru
Segment
Grain and oilseed milling
Process family
Slaughter, cutting and primary processing
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · — lines · — machines
Observation period
—
Data collection
manual_logs
Intervention
Show the setting as described by the study
In the company under study, located in the Ucayali-Peru region, the overall equipment efficiency (OEE) is 73.27%, implying that the machinery is not adequately utilized.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Section IV.B Initial diagnosis)
With the 3 parameters obtained, a current availability of 88.05%, an efficiency of 85.06% and an OEE of 73.27% were calculated.
noneOEE73.3 %Single extractor
—
Show verbatim quote (Section IV.B Initial diagnosis)
With the 3 parameters obtained, a current availability of 88.05%, an efficiency of 85.06% and an OEE of 73.27% were calculated.
noneAvailability88.1 %Single extractor
—
Show verbatim quote (Section IV.B Initial diagnosis)
With the 3 parameters obtained, a current availability of 88.05%, an efficiency of 85.06% and an OEE of 73.27% were calculated.
nonePerformance85.1 %Single extractor
—
Show verbatim quote (Section IV.D Validation's indicators)
a new availability of 91.01% is obtained, a yield of 97.65% and considering that the quality remains the same at 99.30% since no change was made that affects it.
noneQuality99.3 %Single extractor
machine failure (repair time)
Show verbatim quote (Section IV.B Initial diagnosis)
the machine repair time was calculated by the difference between the technician arrival time and his departure time after subtracting the machine emptying time, obtaining an MTTR of. 7.14 hours.
Equipment failure (breakdowns)Mean event duration7.14 hSingle extractor
time of failures in machinery
Show verbatim quote (Section V Conclusions)
it was possible that the time of failures in machinery was reduced from 12.09 hours to 4.50 hours, obtaining a reduction of 62.78%.
Equipment failure (breakdowns)Lost time12.1 hSingle extractor
machine set-up (15 tasks to initialize the machine)
Show verbatim quote (Section IV.B Initial diagnosis)
Currently the set-up is done by means of 15 tasks each time a shift is started to initialize the machine where the 15 times were considered individually and then once added up, the current set up time was obtained, i.e., 20.83 minutes.
Setup and adjustmentsLost time20.8 minSingle extractor

Observation units

  • Palm oil extraction machinery (whole process) · Whole line or unspecified equipment · Baseline