Improving the Malt Extraction Process Using Overall Equipment Effectiveness

Open source

1Bibliographic record

Authors
Suchadee Tumrongsuk, Witchayaporn Kruaiam
Year
2023
Venue
The Journal of King Mongkut s University of Technology North Bangkok
Country
Thailand
Segment
Grain and oilseed milling
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Abstract only
Size
1 plants · — lines · 1 machines
Observation period
—
Data collection
manual_logs
Intervention
Show the setting as described by the study
small sachet filling machines within the filling process department ... malt extraction plant

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 7High risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—small sachet filling machine
Show verbatim quote (Abstract)
the OEE increased from 67.65% to 76.16% or 8.51% improvement
noneOEE76.2 %Both extractors agreed
—small sachet filling machine
Show verbatim quote (Abstract)
the OEE increased from 67.65% to 76.16% or 8.51% improvement
noneOEE67.7 %Both extractors agreed
machine downtimesmall sachet filling machine
Show verbatim quote (Abstract)
machine downtime was reduced from 12.80% to 4.44%
Not classifiable from the reportShare of lost time12.8 %Single extractor
machine downtimesmall sachet filling machine
Show verbatim quote (Abstract)
machine downtime was reduced from 12.80% to 4.44%
Not classifiable from the reportShare of lost time4.44 %Single extractor
—
Show verbatim quote (Abstract)
machine downtime was reduced from 12.80% to 4.44%
Not classifiable from the reportShare of planned time12.8 %Single extractor
—
Show verbatim quote (Abstract)
machine downtime was reduced from 12.80% to 4.44%
Not classifiable from the reportShare of planned time4.44 %Single extractor

Observation units

  • small sachet filling machine · Filling · After intervention
  • small sachet filling machine · Filling · Baseline
  • Small sachet filling line · Filling · Baseline
  • Small sachet filling line · Filling · After intervention