It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 59 % of the line's lost time. Reported by 5 of the 120 studies that could observe it (good evidence).
What happens
The source reports aggregate time losses on the filler under generic headings such as equipment, operational or planned losses, without identifying a specific failure mode, adjustment, stoppage reason or defect mechanism. The underlying physical or organisational cause of the lost time cannot be determined from the label alone, so it may correspond to any combination of breakdowns, minor stops, changeovers or scheduled downtime on the filling station.
What is done about it
Improve downtime data collection by requiring operators or the control system to tag every stop on the filler with a specific reason code (mechanical fault, format change, cleaning, lack of material, etc.) instead of a generic category, and audit the fault-coding structure in the MES. This enables reclassification of historical generic entries into actionable categories such as equipment failure, setup or organizational causes.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 1.4% [0.4–3.3%]
- Expected share of lost time
- 0.8% [0.2–2.0%]
- Share of lost time when present
- 59% [49–69%]
- Studies / units
- 120 / 162
- Evidence grade
- B
Grade B: 5 to 9 studies, or an interval width between 0.20 and 0.35.
2Probability by segment
- Dairy products2.0% [0.3–6.0%]18 studies
- Soft drinks, bottled water and juices2.3% [0.6–5.5%]44 studies
- Brewing, wine and spirits1.4% [0.2–4.5%]16 studies
- Bakery and pasta1.8% [0.3–6.1%]0 studies
- Meat, poultry and seafood1.6% [0.2–4.9%]6 studies
- Fruit and vegetable processing1.7% [0.2–5.3%]4 studies
- Grain and oilseed milling2.3% [0.4–7.5%]6 studies
- Sugar and confectionery1.7% [0.2–5.4%]3 studies
- Snacks, coffee, tea and other foods1.6% [0.2–4.9%]6 studies
- Animal feed and pet food1.6% [0.2–5.2%]4 studies
- Food manufacturing (unspecified or mixed)1.5% [0.2–4.7%]13 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe source reports aggregate time losses on the filler under generic headings such as equipment, operational or planned losses, without identifying a specific failure mode, adjustment, stoppage reason or defect mechanism. The underlying physical or organisational cause of the lost time cannot be determined from the label alone, so it may correspond to any combination of breakdowns, minor stops, changeovers or scheduled downtime on the filling station.
How it looks in SCADA data
Engineering guidanceIn SCADA/MES data this appears as time booked against broad loss buckets (equipment, operational, planned) for the filler without a linked fault code, alarm, or state transition detail, making it impossible to tie the duration to a specific machine state or sensor event. Analysts typically see only aggregated downtime totals per shift or per category rather than discrete event records.
Countermeasure
Engineering guidanceImprove downtime data collection by requiring operators or the control system to tag every stop on the filler with a specific reason code (mechanical fault, format change, cleaning, lack of material, etc.) instead of a generic category, and audit the fault-coding structure in the MES. This enables reclassification of historical generic entries into actionable categories such as equipment failure, setup or organizational causes.
4Sources
- An Example Application On Comparison Of Six Sigma And Kaizen From Total Quality Managment Techniquies (2018)Open sourceLost time: 252,000 litre · as reported: “ilk üç sebep”
Show verbatim quote
Yukarıdaki Pareto grafiğinin incelenmesi sonucunda, ortaya çıkan ve aşağıda değerlendirmesi yapılan ilk üç sebebin 252.000 litre şurup kaybına neden olarak ortaya çıkan toplam şurup kaybının %88.4 lük kısmını oluşturduğu belirlenmiştir.
- An Example Application On Comparison Of Six Sigma And Kaizen From Total Quality Managment Techniquies (2018)Open sourceShare of lost time: 88.4 % · as reported: “ilk üç sebep”
Show verbatim quote
...ortaya çıkan toplam şurup kaybının %88.4 lük kısmını oluşturduğu belirlenmiştir.
- Analisis Produktivitas Mesin Filling Botol Dengan Metode Overal Equipment Effectiveness Dan Failure Mode And Effect Analysis (2023)Open sourceShare of loss events: 28.3 % · as reported: “Downtime Losses”
Show verbatim quote
Reduce Speed Losses with an average proportion of 3.82% and a relative frequency of 39.01%, Downtime Losses with an average of 2.27% and a relative frequency of 28.31%, Defect Losses with an average of 1.58% and a relative frequency of 15.59%, Idle and Minor Stoppage with an average of 1.55% and a relative frequency of 15.85%.
- Analisis Produktivitas Mesin Filling Botol Dengan Metode Overal Equipment Effectiveness Dan Failure Mode And Effect Analysis (2023)Open sourceShare of planned time: 2.27 % · as reported: “Downtime Losses”
Show verbatim quote
Reduce Speed Losses with an average proportion of 3.82% and a relative frequency of 39.01%, Downtime Losses with an average of 2.27% and a relative frequency of 28.31%, Defect Losses with an average of 1.58% and a relative frequency of 15.59%, Idle and Minor Stoppage with an average of 1.55% and a relative frequency of 15.85%.
- Share of lost time: 12.8 % · as reported: “machine downtime”
Show verbatim quote
machine downtime was reduced from 12.80% to 4.44%
- Share of lost time: 4.44 % · as reported: “machine downtime”
Show verbatim quote
machine downtime was reduced from 12.80% to 4.44%
- Integration of Overall Equipment Effectiveness and Six Sigma Approach to Minimize Product Defect and Machine Downtime (2023)Open sourceShare of loss events: 4.00 % · as reported: “No Code”
Show verbatim quote
No Code 192 4
- Integration of Overall Equipment Effectiveness and Six Sigma Approach to Minimize Product Defect and Machine Downtime (2023)Open sourceNumber of events: 192 units · as reported: “No Code”
Show verbatim quote
No Code 192 4
- Integration of Overall Equipment Effectiveness and Six Sigma Approach to Minimize Product Defect and Machine Downtime (2023)Open sourceLost time: 29.5 h · as reported: “Total Downtime”
Show verbatim quote
Total Downtime 29.48 2.84
- Enhancing Production Efficiency and Quality in the Carbonated Beverage Industry: A Lean Manufacturing Approach (2024)Open sourceLost time: 95.0 min · as reported: “Downtime machines”
Show verbatim quote
Downtime machines (min) 185 95 -48.65%
- Enhancing Production Efficiency and Quality in the Carbonated Beverage Industry: A Lean Manufacturing Approach (2024)Open sourceLost time: 185 min · as reported: “Downtime machines”
Show verbatim quote
Downtime machines (min) 185 95 -48.65%
- Lean and RCM-Based Production Model to Improve Operational Efficiency in the Production Line of a Peruvian Dairy SME (2025)Open sourceShare of lost time: 37.0 % · as reported: “product losses during the filling process”
Show verbatim quote
The analysis found two main reasons for this inefficiency: unproductive time during the packaging process, which made up 63% of the problem, and product losses during the filling process, which made up the other 37%.
- Lean and RCM-Based Production Model to Improve Operational Efficiency in the Production Line of a Peruvian Dairy SME (2025)Open sourceShare of lost time: 63.0 % · as reported: “unproductive time during the packaging process”
Show verbatim quote
The analysis found two main reasons for this inefficiency: unproductive time during the packaging process, which made up 63% of the problem, and product losses during the filling process, which made up the other 37%.
- Lost time: 160 min · as reported: “Planned losses”
Show verbatim quote
Planned losses (min) 0 160 0 0 0 160 7
- Lost time: 494 min · as reported: “Operational losses”
Show verbatim quote
Operational losses (min) 278 494 106 53 157 1088 48
- Lost time: 364 min · as reported: “Equipment losses”
Show verbatim quote
Equipment losses (min) 420 364 24 55 152 1015 44.8