Included study
Enhancing sustainability in manufacturing: A case study on reducing changeover time through single minute exchange of dies and risk analysis
1Bibliographic record
- Authors
- Harnam Singh Farwaha, Prem Singh, Mukesh Kumar, Nishant Ranjan, Harpreet Kaur
- Year
- 2024
- Venue
- AIP conference proceedings
- Country
- —
- Segment
- Food manufacturing (unspecified or mixed)
- Process family
- Whole plant or unspecified
- Study type
- Before/after intervention
- Extraction scope
- Abstract only
- Size
- 1 plants · 2 lines · 2 machines
- Observation period
- —
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
In the food processing business, where cleaning various parts was the primary task during the changeover, this study concentrated on the application of SMED.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 3High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?The setting cannot be classified beyond "a food company". | 0 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Only post-intervention or only "best period" results are reported. | 0 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Abstract)The production unit's overall equipment effectiveness (OEE) improved to 0.89. | none | OEE | 0.890 ratio | Both extractors agreed |
—Show verbatim quote (Abstract)The production unit's overall equipment effectiveness (OEE) improved to 0.89. | none | OEE | 0.890 none | Single extractor |
changeoverShow verbatim quote (Abstract)At stations A and B, the results of a post-SMED time analysis showed a reduction in changeover time of 35.54% and 49.94%, respectively. | Setup and adjustments | Share of lost time | 35.5 % | Single extractor |
changeoverShow verbatim quote (Abstract)At stations A and B, the results of a post-SMED time analysis showed a reduction in changeover time of 35.54% and 49.94%, respectively. | Setup and adjustments | Share of lost time | 49.9 % | Single extractor |
Observation units
- Production unit · Whole line or unspecified equipment · After intervention
- Station A · Whole line or unspecified equipment · After intervention
- Station B · Whole line or unspecified equipment · After intervention