Analisis Efektivitas Line Cubing 2 dengan Menggunakan Metode Overall Equipment Effectiveness di PT. BM

Open source

1Bibliographic record

Authors
Falsha Satria Dwiputra, Wahyudin Wahyudin, Billy Nugraha
Year
2024
Venue
Industrika Jurnal Ilmiah Teknik Industri
Country
Indonesia
Segment
Snacks, coffee, tea and other foods
Process family
Forming, baking and cooking
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
31 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
PT. BM is a food seasoning company. One of its superior products is seasoning cubes.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
pendorong produk (bushing)Mesin Sapal
Show verbatim quote (Identifikasi Akar Penyebab Masalah, Gambar 5-6)
equipment failure yang mendominasi pada mesin Sapal adalah pendorong produk (bushing) yaitu sebanyak 601 menit atau 10,01 jam.
Equipment failure (breakdowns)Lost time601 menitBoth extractors agreed
—
Show verbatim quote (Kesimpulan)
kinerja line cubing 2 pada bulan Maret belum mencapai standar world class OEE yaitu hanya mencapai rata-rata 73,05%.
noneOEE73.1 %Both extractors agreed
—
Show verbatim quote (Identifikasi Akar Penyebab Masalah)
Indikator yang menjadi pengaruh terbesar adalah kecilnya nilai availability rate yang hanya bernilai rata-rata dalam sebulan yaitu 85,94%.
noneAvailability85.9 %Both extractors agreed
—
Show verbatim quote (Pendahuluan, Gambar 2)
Line yang memiliki durasi downtime paling tinggi selama bulan maret adalah Line Cubing 2 yaitu sebanyak 3.804 menit atau 63,4 jam.
Not classifiable from the reportLost time3,804 menitSingle extractor
—
Show verbatim quote (Tabel 2. Nilai Availability Rate Line Cubing 2)
9 75 4,65 93,80%
noneAvailability93.8 %Single extractor
—
Show verbatim quote (Tabel 2. Nilai Availability Rate Line Cubing 2)
10 52 18,67 64,10%
noneAvailability64.1 %Single extractor
—
Show verbatim quote (Tabel 2. Nilai Availability Rate Line Cubing 2)
11 36 4,45 87,64%
noneAvailability87.6 %Single extractor
—
Show verbatim quote (Tabel 2. Nilai Availability Rate Line Cubing 2)
12 48 7,11 85,19%
noneAvailability85.2 %Single extractor
—
Show verbatim quote (Tabel 2. Nilai Availability Rate Line Cubing 2)
13 48 0,5 98,96%
noneAvailability99.0 %Single extractor
—
Show verbatim quote (Tabel 3. Nilai Performance Rate Line Cubing 2)
9 625.800 70,35 0,000104 92,51%
nonePerformance92.5 %Single extractor
—
Show verbatim quote (Tabel 3. Nilai Performance Rate Line Cubing 2)
10 304.200 33,33 0,000104 94,92%
nonePerformance94.9 %Single extractor
—
Show verbatim quote (Tabel 3. Nilai Performance Rate Line Cubing 2)
11 300.000 31,55 0,000104 98,89%
nonePerformance98.9 %Single extractor
—
Show verbatim quote (Tabel 3. Nilai Performance Rate Line Cubing 2)
12 318.000 40,89 0,000104 80,88%
nonePerformance80.9 %Single extractor
—
Show verbatim quote (Tabel 3. Nilai Performance Rate Line Cubing 2)
13 441.600 47,50 0,000104 96,69%
nonePerformance96.7 %Single extractor
—
Show verbatim quote (Tabel 4. Nilai Quality Rate Line Cubing 2)
9 625.800 664.440 91,18%
noneQuality91.2 %Single extractor
—
Show verbatim quote (Tabel 4. Nilai Quality Rate Line Cubing 2)
10 304.200 346.240 87,86%
noneQuality87.9 %Single extractor
—
Show verbatim quote (Tabel 4. Nilai Quality Rate Line Cubing 2)
11 300.000 323.960 92,60%
noneQuality92.6 %Single extractor
—
Show verbatim quote (Tabel 4. Nilai Quality Rate Line Cubing 2)
12 318.000 382.200 83,20%
noneQuality83.2 %Single extractor
—
Show verbatim quote (Tabel 4. Nilai Quality Rate Line Cubing 2)
13 441.600 456.800 96,67%
noneQuality96.7 %Single extractor
—
Show verbatim quote (Tabel 5. Nilai OEE Line Cubing 2)
9 93,80% 92,51% 91,18% 81,73%
noneOEE81.7 %Single extractor
—
Show verbatim quote (Tabel 5. Nilai OEE Line Cubing 2)
10 64,10% 94,92% 87,86% 53,45%
noneOEE53.5 %Single extractor
—
Show verbatim quote (Tabel 5. Nilai OEE Line Cubing 2)
11 87,64% 98,89% 92,60% 80,26%
noneOEE80.3 %Single extractor
—
Show verbatim quote (Tabel 5. Nilai OEE Line Cubing 2)
12 85,19% 80,88% 83,20% 57,33%
noneOEE57.3 %Single extractor
—
Show verbatim quote (Tabel 5. Nilai OEE Line Cubing 2)
13 98,96% 96,69% 96,67% 92,50%
noneOEE92.5 %Single extractor
—Mesin Sapal
Show verbatim quote (Identifikasi Akar Penyebab Masalah, Gambar 4)
mesin Sapal adalah mesin yang paling sering mengalami equipment failure yaitu sebanyak 1050 menit atau 17,5 jam.
Equipment failure (breakdowns)Lost time1,050 menitSingle extractor

Observation units

  • Line Cubing 2 · Forming, moulding and depositing · Baseline