Included study
Penerapan Konsep Lean Manufacturing Untuk Redesign Tata Letak Fasilitas Dengan Pendekatan Value Stream Mapping Pada UMKM Roti Agifa
1Bibliographic record
- Authors
- Ridwan Adi Setiabudi, Nabila Kurnia Ramadhani, Eko Apriyana, Fadila Woro Wulandari, Dista Amelia
- Year
- 2025
- Venue
- JURNAL TEKNIK MESIN INDUSTRI ELEKTRO DAN INFORMATIKA
- Country
- Indonesia
- Segment
- Bakery and pasta
- Process family
- Forming, baking and cooking
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 2 machines
- Observation period
- —
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Produk yang dihasilkan berupa bahan dasar roti manis, pada proses produksinya masih tradisional tanpa menggunakan bantuan mesin hanya pada saat proses pembakaran saja menggunakan oven berbahan bakar gas dan mixer untuk membuat adonan.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Table 5 - Sebelum Perbaikan)Delay 13 7.500 2,083333 31,07 % | Idling and minor stops (micro-stops) | Share of lost time | 31.1 % | Single extractor |
—Show verbatim quote (Table 5)Delay 13 7.500 2,083333 31,07 % | Idling and minor stops (micro-stops) | Lost time | 7,500 s | Single extractor |
—Show verbatim quote (Table 5)Delay 13 7.500 2,083333 31,07 % | Idling and minor stops (micro-stops) | Number of events | 13.0 events | Single extractor |
—Show verbatim quote (Table 5)Transportasi 4 2.150 0,597222 8,90 % | Setup and adjustments | Share of lost time | 8.90 % | Single extractor |
—Show verbatim quote (Table 5)Transportasi 4 2.150 0,597222 8,90 % | Setup and adjustments | Lost time | 2,150 s | Single extractor |
—Show verbatim quote (Table 5)Transportasi 4 2.150 0,597222 8,90 % | Setup and adjustments | Number of events | 4.00 events | Single extractor |
—Show verbatim quote (Table 5)Inspeksi 2 690 0,191667 2,85 % | Process defects (scrap and rework) | Share of lost time | 2.85 % | Single extractor |
—Show verbatim quote (Table 5)Inspeksi 2 690 0,191667 2,85 % | Process defects (scrap and rework) | Lost time | 690 s | Single extractor |
—Show verbatim quote (Table 5)Inspeksi 2 690 0,191667 2,85 % | Process defects (scrap and rework) | Number of events | 2.00 events | Single extractor |
—Show verbatim quote (Table 5)Storage 5 50 0,013889 0,20 % | Planned downtime (scheduled maintenance, breaks, no demand) | Share of lost time | 0.200 % | Single extractor |
—Show verbatim quote (Table 5)Storage 5 50 0,013889 0,20 % | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 50.0 s | Single extractor |
—Show verbatim quote (Table 5)Storage 5 50 0,013889 0,20 % | Planned downtime (scheduled maintenance, breaks, no demand) | Number of events | 5.00 events | Single extractor |
—Show verbatim quote (Table 6 - Setelah Perbaikan)Delay 13 5670 1,575 25,87 % | Idling and minor stops (micro-stops) | Share of lost time | 25.9 % | Single extractor |
—Show verbatim quote (Table 6)Delay 13 5670 1,575 25,87 % | Idling and minor stops (micro-stops) | Lost time | 5,670 s | Single extractor |
—Show verbatim quote (Table 6)Delay 13 5670 1,575 25,87 % | Idling and minor stops (micro-stops) | Number of events | 13.0 events | Single extractor |
—Show verbatim quote (Table 6)Transportasi 4 1.763,75 0,48993 8,05 % | Setup and adjustments | Share of lost time | 8.05 % | Single extractor |
—Show verbatim quote (Table 6)Transportasi 4 1.763,75 0,48993 8,05 % | Setup and adjustments | Lost time | 1,764 s | Single extractor |
—Show verbatim quote (Table 6)Transportasi 4 1.763,75 0,48993 8,05 % | Setup and adjustments | Number of events | 4.00 events | Single extractor |
—Show verbatim quote (Table 6)Inspeksi 2 690 0,19167 3,15 % | Process defects (scrap and rework) | Share of lost time | 3.15 % | Single extractor |
—Show verbatim quote (Table 6)Inspeksi 2 690 0,19167 3,15 % | Process defects (scrap and rework) | Lost time | 690 s | Single extractor |
—Show verbatim quote (Table 6)Inspeksi 2 690 0,19167 3,15 % | Process defects (scrap and rework) | Number of events | 2.00 events | Single extractor |
—Show verbatim quote (Table 6)Storage 5 50 0,01389 0,22 % | Planned downtime (scheduled maintenance, breaks, no demand) | Share of lost time | 0.220 % | Single extractor |
—Show verbatim quote (Table 6)Storage 5 50 0,01389 0,22 % | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 50.0 s | Single extractor |
—Show verbatim quote (Table 6)Storage 5 50 0,01389 0,22 % | Planned downtime (scheduled maintenance, breaks, no demand) | Number of events | 5.00 events | Single extractor |
Karyawan menyiapkan wadah untuk ragiShow verbatim quote (Table 4, Usulan Perbaikan for Activity A4)Karywan dapat menempatkan wadah ragi pada stasiun pembuatan adonan untuk mempersingkat waktu yang waktu awalnya sebesar 240 detik menjadi 120 detik | Setup and adjustments | Lost time | 120 s | Single extractor |
Observation units
- Agifa Roti production line · Whole line or unspecified equipment · Baseline