Penerapan Konsep Lean Manufacturing Untuk Redesign Tata Letak Fasilitas Dengan Pendekatan Value Stream Mapping Pada UMKM Roti Agifa

Open source

1Bibliographic record

Authors
Ridwan Adi Setiabudi, Nabila Kurnia Ramadhani, Eko Apriyana, Fadila Woro Wulandari, Dista Amelia
Year
2025
Venue
JURNAL TEKNIK MESIN INDUSTRI ELEKTRO DAN INFORMATIKA
Country
Indonesia
Segment
Bakery and pasta
Process family
Forming, baking and cooking
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 2 machines
Observation period
—
Data collection
manual_logs
Intervention
Show the setting as described by the study
Produk yang dihasilkan berupa bahan dasar roti manis, pada proses produksinya masih tradisional tanpa menggunakan bantuan mesin hanya pada saat proses pembakaran saja menggunakan oven berbahan bakar gas dan mixer untuk membuat adonan.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Table 5 - Sebelum Perbaikan)
Delay 13 7.500 2,083333 31,07 %
Idling and minor stops (micro-stops)Share of lost time31.1 %Single extractor
—
Show verbatim quote (Table 5)
Delay 13 7.500 2,083333 31,07 %
Idling and minor stops (micro-stops)Lost time7,500 sSingle extractor
—
Show verbatim quote (Table 5)
Delay 13 7.500 2,083333 31,07 %
Idling and minor stops (micro-stops)Number of events13.0 eventsSingle extractor
—
Show verbatim quote (Table 5)
Transportasi 4 2.150 0,597222 8,90 %
Setup and adjustmentsShare of lost time8.90 %Single extractor
—
Show verbatim quote (Table 5)
Transportasi 4 2.150 0,597222 8,90 %
Setup and adjustmentsLost time2,150 sSingle extractor
—
Show verbatim quote (Table 5)
Transportasi 4 2.150 0,597222 8,90 %
Setup and adjustmentsNumber of events4.00 eventsSingle extractor
—
Show verbatim quote (Table 5)
Inspeksi 2 690 0,191667 2,85 %
Process defects (scrap and rework)Share of lost time2.85 %Single extractor
—
Show verbatim quote (Table 5)
Inspeksi 2 690 0,191667 2,85 %
Process defects (scrap and rework)Lost time690 sSingle extractor
—
Show verbatim quote (Table 5)
Inspeksi 2 690 0,191667 2,85 %
Process defects (scrap and rework)Number of events2.00 eventsSingle extractor
—
Show verbatim quote (Table 5)
Storage 5 50 0,013889 0,20 %
Planned downtime (scheduled maintenance, breaks, no demand)Share of lost time0.200 %Single extractor
—
Show verbatim quote (Table 5)
Storage 5 50 0,013889 0,20 %
Planned downtime (scheduled maintenance, breaks, no demand)Lost time50.0 sSingle extractor
—
Show verbatim quote (Table 5)
Storage 5 50 0,013889 0,20 %
Planned downtime (scheduled maintenance, breaks, no demand)Number of events5.00 eventsSingle extractor
—
Show verbatim quote (Table 6 - Setelah Perbaikan)
Delay 13 5670 1,575 25,87 %
Idling and minor stops (micro-stops)Share of lost time25.9 %Single extractor
—
Show verbatim quote (Table 6)
Delay 13 5670 1,575 25,87 %
Idling and minor stops (micro-stops)Lost time5,670 sSingle extractor
—
Show verbatim quote (Table 6)
Delay 13 5670 1,575 25,87 %
Idling and minor stops (micro-stops)Number of events13.0 eventsSingle extractor
—
Show verbatim quote (Table 6)
Transportasi 4 1.763,75 0,48993 8,05 %
Setup and adjustmentsShare of lost time8.05 %Single extractor
—
Show verbatim quote (Table 6)
Transportasi 4 1.763,75 0,48993 8,05 %
Setup and adjustmentsLost time1,764 sSingle extractor
—
Show verbatim quote (Table 6)
Transportasi 4 1.763,75 0,48993 8,05 %
Setup and adjustmentsNumber of events4.00 eventsSingle extractor
—
Show verbatim quote (Table 6)
Inspeksi 2 690 0,19167 3,15 %
Process defects (scrap and rework)Share of lost time3.15 %Single extractor
—
Show verbatim quote (Table 6)
Inspeksi 2 690 0,19167 3,15 %
Process defects (scrap and rework)Lost time690 sSingle extractor
—
Show verbatim quote (Table 6)
Inspeksi 2 690 0,19167 3,15 %
Process defects (scrap and rework)Number of events2.00 eventsSingle extractor
—
Show verbatim quote (Table 6)
Storage 5 50 0,01389 0,22 %
Planned downtime (scheduled maintenance, breaks, no demand)Share of lost time0.220 %Single extractor
—
Show verbatim quote (Table 6)
Storage 5 50 0,01389 0,22 %
Planned downtime (scheduled maintenance, breaks, no demand)Lost time50.0 sSingle extractor
—
Show verbatim quote (Table 6)
Storage 5 50 0,01389 0,22 %
Planned downtime (scheduled maintenance, breaks, no demand)Number of events5.00 eventsSingle extractor
Karyawan menyiapkan wadah untuk ragi
Show verbatim quote (Table 4, Usulan Perbaikan for Activity A4)
Karywan dapat menempatkan wadah ragi pada stasiun pembuatan adonan untuk mempersingkat waktu yang waktu awalnya sebesar 240 detik menjadi 120 detik
Setup and adjustmentsLost time120 sSingle extractor

Observation units

  • Agifa Roti production line · Whole line or unspecified equipment · Baseline
  • Agifa Roti production line · Whole line or unspecified equipment · After intervention