Integrating Lean Manufacturing and TPM for Process Optimization in Bakery SMEs: A Case Study from Peru
1Bibliographic record
- Authors
- Roger Alberto Vásquez-García, Rubén Francisco Samanez-Coronel
- Year
- 2024
- Venue
- International Conference on Industrial Engineering and Operations Management (IEOM)
- Country
- Peru
- Segment
- Bakery and pasta
- Process family
- Forming, baking and cooking
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · — lines · — machines
- Observation period
- 120 days
- Data collection
- maintenance_records
- Intervention
Show the setting as described by the study
The validation scenario took place in a case study involving a bakery SME located in Peru, which specialized in producing various pastries and desserts, including cakes and soufflés.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 7High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—ovens and mixing machinesShow verbatim quote (Section 4.4)The MTBF (mean time between failures) increased from 24.33 hours to 61.33 hours, representing a 150% improvement in equipment reliability. | Equipment failure (breakdowns) | Time between events | 61.3 hours | Both extractors agreed |
—ovens and mixing machinesShow verbatim quote (Section 4.4)The MTTR (mean time to repair) improved from 5.10 hours in September to 3.33 hours by December, a 35% reduction. | Equipment failure (breakdowns) | Mean event duration | 3.33 hours | Both extractors agreed |
cakes that were overbaked or underbaked due to oven temperature fluctuationsovensShow verbatim quote (Section 4.4)Before maintenance training, the number of defective products, particularly cakes that were overbaked or underbaked due to oven temperature fluctuations, averaged 30 units per month. | Process defects (scrap and rework) | Number of events | 30.0 units/month | Both extractors agreed |
defective cakes due to improper proceduresShow verbatim quote (Section 4.5)The percentage of defective cakes due to improper procedures dropped from 9.52% to 3.85%, a reduction of over 60%. | Process defects (scrap and rework) | Defect rate | 3.85 % | Both extractors agreed |
defective cakes due to improper proceduresShow verbatim quote (Section 4.5)The percentage of defective cakes due to improper procedures dropped from 9.52% to 3.85%, a reduction of over 60%. | Process defects (scrap and rework) | Defect rate | 9.52 % | Both extractors agreed |
cakes that were overbaked or underbaked due to oven temperature fluctuationsovensShow verbatim quote (Section 4.4)This number dropped to 12 units per month after the operators were trained to monitor and maintain the ovens more effectively. | Process defects (scrap and rework) | Number of events | 12.0 units/month | Both extractors agreed |
—ovens and mixing machinesShow verbatim quote (Section 4.4)Prior to implementation, the bakery experienced an average of 101.15 minutes of machine downtime per week, resulting in the loss of 17 products per month. | Equipment failure (breakdowns) | Lost time | 101 min/week | Both extractors agreed |
—ovens and mixing machinesShow verbatim quote (Section 4.4)The MTTR (mean time to repair) improved from 5.10 hours in September to 3.33 hours by December, a 35% reduction. | Equipment failure (breakdowns) | Mean event duration | 5.10 hours | Single extractor |
—ovens and mixing machinesShow verbatim quote (Table 1)MTTR hours 4.27 3.5 3.33 -22.01% | Equipment failure (breakdowns) | Mean event duration | 4.27 hours | Single extractor |
—ovens and mixing machinesShow verbatim quote (Section 4.4)The MTBF (mean time between failures) increased from 24.33 hours to 61.33 hours, representing a 150% improvement in equipment reliability. | Equipment failure (breakdowns) | Time between events | 24.3 hours | Single extractor |
—Show verbatim quote (Table 1)Rate of reprocessed products % 23% 10% 13% -43.48% | Process defects (scrap and rework) | Defect rate | 23.0 % | Single extractor |
—Show verbatim quote (Table 1)Rate of reprocessed products % 23% 10% 13% -43.48% | Process defects (scrap and rework) | Defect rate | 13.0 % | Single extractor |
—Show verbatim quote (Table 1, Results section, page 10-11)the rate of order fulfillment improved significantly, rising from 77.81% to 91.23% | none | Share of planned time | 77.8 % | Single extractor |
searching for production tools and materialsShow verbatim quote (Section 4.3, page 11)the time spent searching for tools decreased from an average of 77 minutes per shift to 29 minutes, a 62% reduction | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 77.0 minutes | Single extractor |
oven overheating/shutdown, mixing machine blockagesovens, mixing machinesShow verbatim quote (Section 4.4, page 9)an average of 101.15 minutes of machine downtime per week, resulting in the loss of 17 products per month | Equipment failure (breakdowns) | Number of events | 17.0 units | Single extractor |
—Show verbatim quote (Table 1, Results section, page 10-11)the rate of order fulfillment improved significantly, rising from 77.81% to 91.23% | none | Share of planned time | 91.2 % | Single extractor |
searching for production tools and materials - after 5S implementationShow verbatim quote (Section 4.3, page 11)the time spent searching for tools decreased from an average of 77 minutes per shift to 29 minutes, a 62% reduction | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 29.0 minutes | Single extractor |
oven overheating/shutdown, mixing machine blockages - after autonomous maintenance trainingovens, mixing machinesShow verbatim quote (Section 4.4, page 9)reducing monthly product losses from 17 to 5 | Equipment failure (breakdowns) | Number of events | 5.00 units | Single extractor |
Observation units
- Bakery SME - whole plant · Whole line or unspecified equipment · After intervention
- Bakery SME - whole plant · Whole line or unspecified equipment · Baseline