Analysis Of Overall Equipment Effectiveness (OEE) Rice Milling Unit Machines to At CV Fajar Samudra

Open source

1Bibliographic record

Authors
Ismi Mashabai, Marisa Desita Ramdani, Ulfaturrahmi, Koko Hermanto
Year
2025
Venue
Metode Jurnal Teknik Industri
Country
Indonesia
Segment
Grain and oilseed milling
Process family
Slaughter, cutting and primary processing
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
182 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
Alur produksi mesin Rice Milling Unit diawali dari pengeringan dimana sebelum masuk proses pengeringan terlebih dulu dilakukan penimbangan selanjutnya dimasukan ke mesin dryer yang kemudian dimasukan ke Rice Milling Unit (RMU).

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Table 4 (Six Big Losses))
Oktober 2023 2,19 3,46 39,33 48,49 0,18
Process defects (scrap and rework)Share of lost time0.180 %Both extractors agreed
—
Show verbatim quote (Table 4 (Six Big Losses))
Oktober 2023 2,19 3,46 39,33 48,49 0,18
Reduced speedShare of lost time48.5 %Both extractors agreed
—
Show verbatim quote (Table 4 (Six Big Losses))
Oktober 2023 2,19 3,46 39,33 48,49 0,18
Idling and minor stops (micro-stops)Share of lost time39.3 %Both extractors agreed
—
Show verbatim quote (Table 4 (Six Big Losses))
Oktober 2023 2,19 3,46 39,33 48,49 0,18
Setup and adjustmentsShare of lost time3.46 %Both extractors agreed
—
Show verbatim quote (Table 4 (Six Big Losses))
Oktober 2023 2,19 3,46 39,33 48,49 0,18
Equipment failure (breakdowns)Share of lost time2.19 %Both extractors agreed
—
Show verbatim quote (Table 3 (Quality))
Okt-23 390.000 1.450 99,62%
noneQuality99.6 %Both extractors agreed
—
Show verbatim quote (Table 2 (Performance))
Okt-23 8,180 700,000 390,000 0,011 85,57 52,44
nonePerformance52.4 %Both extractors agreed
—
Show verbatim quote (Table 1 (Availability))
Okt-23 9.240 600 8,670 300 190 8,180 94,34%
noneAvailability94.3 %Both extractors agreed
—
Show verbatim quote (Section 3.4 (Nilai OEE))
Di peroleh rata-rata nilai OEE pada mesin rice milling unit sebesar 57,02%, masih jauh dari nilai OEE Institute Of Plant Maintenance yaitu 84%.
noneOEE57.0 %Both extractors agreed
—
Show verbatim quote (Table 1 (Availability))
Okt-23 9.240 600 8,670 300 190 8,180 94,34%
Planned downtime (scheduled maintenance, breaks, no demand)Lost time600 minSingle extractor
—
Show verbatim quote (Table 1 (Availability))
Okt-23 9.240 600 8,670 300 190 8,180 94,34%
Setup and adjustmentsLost time300 minSingle extractor
—
Show verbatim quote (Table 1 (Availability))
Okt-23 9.240 600 8,670 300 190 8,180 94,34%
Equipment failure (breakdowns)Lost time190 minSingle extractor
—
Show verbatim quote (Table 1 (Availability))
Nov-23 9.240 750 8,490 300 160 8,030 94,58%
noneAvailability94.6 %Single extractor
—
Show verbatim quote (Table 1 (Availability))
Nov-23 9.240 750 8,490 300 160 8,030 94,58%
Planned downtime (scheduled maintenance, breaks, no demand)Lost time750 minSingle extractor
—
Show verbatim quote (Table 1 (Availability))
Nov-23 9.240 750 8,490 300 160 8,030 94,58%
Equipment failure (breakdowns)Lost time160 minSingle extractor
—
Show verbatim quote (Table 1 (Availability))
Des-23 8.820 650 8,170 285 145 7,738 94,73%
noneAvailability94.7 %Single extractor
—
Show verbatim quote (Table 1 (Availability))
Des-23 8.820 650 8,170 285 145 7,738 94,73%
Planned downtime (scheduled maintenance, breaks, no demand)Lost time650 minSingle extractor
—
Show verbatim quote (Table 1 (Availability))
Des-23 8.820 650 8,170 285 145 7,738 94,73%
Setup and adjustmentsLost time285 minSingle extractor
—
Show verbatim quote (Table 1 (Availability))
Des-23 8.820 650 8,170 285 145 7,738 94,73%
Equipment failure (breakdowns)Lost time145 minSingle extractor
—
Show verbatim quote (Table 1 (Availability))
Jan-24 9.660 550 9,410 315 145 8,950 97,92%
noneAvailability97.9 %Single extractor
—
Show verbatim quote (Table 1 (Availability))
Jan-24 9.660 550 9,410 315 145 8,950 97,92%
Planned downtime (scheduled maintenance, breaks, no demand)Lost time550 minSingle extractor
—
Show verbatim quote (Table 1 (Availability))
Jan-24 9.660 550 9,410 315 145 8,950 97,92%
Setup and adjustmentsLost time315 minSingle extractor
—
Show verbatim quote (Table 1 (Availability))
Feb-24 8.820 690 8,130 285 160 7,685 94,52%
noneAvailability94.5 %Single extractor
—
Show verbatim quote (Table 1 (Availability))
Feb-24 8.820 690 8,130 285 160 7,685 94,52%
Planned downtime (scheduled maintenance, breaks, no demand)Lost time690 minSingle extractor
—
Show verbatim quote (Table 1 (Availability))
Mar-24 8.820 500 8,320 285 175 95,19%
noneAvailability95.2 %Single extractor
—
Show verbatim quote (Table 1 (Availability))
Mar-24 8.820 500 8,320 285 175 95,19%
Planned downtime (scheduled maintenance, breaks, no demand)Lost time500 minSingle extractor
—
Show verbatim quote (Table 1 (Availability))
Mar-24 8.820 500 8,320 285 175 95,19%
Equipment failure (breakdowns)Lost time175 minSingle extractor
—
Show verbatim quote (Table 2 (Performance))
Nov-23 8,030 495,000 320,000 0,016 61,64 63,76
nonePerformance63.8 %Single extractor
—
Show verbatim quote (Table 2 (Performance))
Des-23 7,738 490,000 315,000 0,015 63,32 61,06
nonePerformance61.1 %Single extractor
—
Show verbatim quote (Table 2 (Performance))
Jan-24 8,950 570,000 390,000 0,015 63,68 65,36
nonePerformance65.4 %Single extractor
—
Show verbatim quote (Table 2 (Performance))
Feb-24 7,658 505,000 295,000 0,015 65,71 56,99
nonePerformance57.0 %Single extractor
—
Show verbatim quote (Table 3 (Quality))
Nov-24 320.000 1.365 99,57%
noneQuality99.6 %Single extractor
—
Show verbatim quote (Table 3 (Quality))
Des-23 315.000 1.100 99,65%
noneQuality99.7 %Single extractor
—
Show verbatim quote (Table 3 (Quality))
Jan-24 390.000 1.575 99,59%
noneQuality99.6 %Single extractor
—
Show verbatim quote (Table 3 (Quality))
Mar-24 300.000 1.550 99,48%
noneQuality99.5 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
November 2023 1,88 3,53 32,03 59,58 0,25
Equipment failure (breakdowns)Share of lost time1.88 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
November 2023 1,88 3,53 32,03 59,58 0,25
Setup and adjustmentsShare of lost time3.53 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
November 2023 1,88 3,53 32,03 59,58 0,25
Idling and minor stops (micro-stops)Share of lost time32.0 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
November 2023 1,88 3,53 32,03 59,58 0,25
Reduced speedShare of lost time59.6 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
November 2023 1,88 3,53 32,03 59,58 0,25
Process defects (scrap and rework)Share of lost time0.250 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Desember 2023 1,77 3,48 32,12 57,05 0,20
Equipment failure (breakdowns)Share of lost time1.77 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Desember 2023 1,77 3,48 32,12 57,05 0,20
Setup and adjustmentsShare of lost time3.48 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Desember 2023 1,77 3,48 32,12 57,05 0,20
Idling and minor stops (micro-stops)Share of lost time32.1 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Desember 2023 1,77 3,48 32,12 57,05 0,20
Reduced speedShare of lost time57.1 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Desember 2023 1,77 3,48 32,12 57,05 0,20
Process defects (scrap and rework)Share of lost time0.200 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Januari 2024 1,54 3,34 28,69 61,49 0,25
Equipment failure (breakdowns)Share of lost time1.54 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Januari 2024 1,54 3,34 28,69 61,49 0,25
Setup and adjustmentsShare of lost time3.34 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Januari 2024 1,54 3,34 28,69 61,49 0,25
Idling and minor stops (micro-stops)Share of lost time28.7 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Januari 2024 1,54 3,34 28,69 61,49 0,25
Reduced speedShare of lost time61.5 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Febuari 2024 1,96 3,50 38,74 53,61 0,23
Equipment failure (breakdowns)Share of lost time1.96 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Febuari 2024 1,96 3,50 38,74 53,61 0,23
Setup and adjustmentsShare of lost time3.50 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Febuari 2024 1,96 3,50 38,74 53,61 0,23
Idling and minor stops (micro-stops)Share of lost time38.7 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Febuari 2024 1,96 3,50 38,74 53,61 0,23
Reduced speedShare of lost time53.6 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Febuari 2024 1,96 3,50 38,74 53,61 0,23
Process defects (scrap and rework)Share of lost time0.230 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Maret 2024 2,10 3,42 34,61 56,95 0,29
Equipment failure (breakdowns)Share of lost time2.10 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Maret 2024 2,10 3,42 34,61 56,95 0,29
Setup and adjustmentsShare of lost time3.42 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Maret 2024 2,10 3,42 34,61 56,95 0,29
Idling and minor stops (micro-stops)Share of lost time34.6 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Maret 2024 2,10 3,42 34,61 56,95 0,29
Reduced speedShare of lost time57.0 %Single extractor
—
Show verbatim quote (Table 4 (Six Big Losses))
Maret 2024 2,10 3,42 34,61 56,95 0,29
Process defects (scrap and rework)Share of lost time0.290 %Single extractor
v-belt mesin putus/kendorv-belt
Show verbatim quote (Section 1 (Pendahuluan))
Berdasarkan informasi dari pemilik perusahaan permasalahan yang terjadi pada mesin pengiling beras (Rice Milling Unit) yakni v-belt putus atau kendor sehingga mengakibatkan mesin berhenti dan tidak beroperasi + selama 4 jam.
Equipment failure (breakdowns)Mean event duration4.00 jamSingle extractor

Observation units

  • Rice Milling Unit · Milling and grinding · Baseline