Included study
Performance Improvement Model Integrating Lean and Internet of things: AFoodProductionCase
1Bibliographic record
- Authors
- Sarita Giselle Benites, Linscy Taina Eustaquio, Víctor Núñez
- Year
- 2024
- Venue
- International Conference on Industrial and Business Engineering (ICIBE)
- Country
- Peru
- Segment
- Food manufacturing (unspecified or mixed)
- Process family
- Whole plant or unspecified
- Study type
- Before/after intervention
- Extraction scope
- Abstract only
- Size
- 1 plants · — lines · — machines
- Observation period
- —
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
The validation was carried out through a pilot scheme in a food company.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 2High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?The setting cannot be classified beyond "a food company". | 0 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Only post-intervention or only "best period" results are reported. | 0 / 2 |
| Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%. | 0 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Abstract)The results included an increase in throughput to 82% | none | Throughput | 82.0 % | Single extractor |
—Show verbatim quote (Abstract)an increase in quality to 85% | none | Quality | 85.0 % | Single extractor |
setup timeShow verbatim quote (Abstract)a 35% decrease in setup time | Setup and adjustments | Lost time | 35.0 % | Single extractor |
Observation units
- Pilot food company (Peru) · Whole line or unspecified equipment · After intervention

