Evaluasi Kinerja Mesin Screw Press Melalui Penerapan Total Productive Maintenance (TPM) di Pabrik Kelapa Sawit PT. XYZ: Performance Evaluation of Screw Press Machine through the Implementation of Total Productive Maintenance (TPM) at Palm Oil Mill of PT. XYZ
1Bibliographic record
- Authors
- Yuliana Ningsih, Muhammad Khudari, Titis Linangsari, Mufrida Zein, Ema Lestari
- Year
- 2025
- Venue
- Jurnal Teknologi Agro-Industri
- Country
- Indonesia
- Segment
- Grain and oilseed milling
- Process family
- Slaughter, cutting and primary processing
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · — lines · 1 machines
- Observation period
- 61 days
- Data collection
- maintenance_records
- Intervention
Show the setting as described by the study
PT. XYZ merupakan perusahaan yang beroperasi di sektor perkebunan serta pengolahan kelapa sawit, dengan produk utama berupa minyak kelapa sawit mentah (Crude Palm Oil/CPO) dan minyak inti sawit (Palm Kernel Oil/PKO).
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—screw pressShow verbatim quote (Tabel 3)Rata-rata 93,35 76,90 99,98 71,23 | none | Quality | 100.0 % | Both extractors agreed |
—screw pressShow verbatim quote (Tabel 3)Rata-rata 93,35 76,90 99,98 71,23 | none | Performance | 76.9 % | Both extractors agreed |
—screw pressShow verbatim quote (Tabel 3)Rata-rata 93,35 76,90 99,98 71,23 | none | Availability | 93.4 % | Both extractors agreed |
—screw pressShow verbatim quote (Tabel 3)Rata-rata 93,35 76,90 99,98 71,23 | none | OEE | 71.2 % | Both extractors agreed |
Dirtyscrew pressShow verbatim quote (Tabel 2)Desember 43.500.000 0,07 34.140 89,19% 0,014 6.090 99,98% | Process defects (scrap and rework) | Defect rate | 0.0140 % | Both extractors agreed |
Downtimescrew pressShow verbatim quote (Tabel 1)November 25 36.000 3.000 33.000 720 32.280 97,81 | Equipment failure (breakdowns) | Lost time | 720 menit | Single extractor |
Downtimescrew pressShow verbatim quote (Tabel 1)Desember 28 40.320 1.920 38.400 4.260 34.140 88,90 | Equipment failure (breakdowns) | Lost time | 4,260 menit | Single extractor |
Planned Downtimescrew pressShow verbatim quote (Tabel 1)November 25 36.000 3.000 33.000 720 32.280 97,81 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 3,000 menit | Single extractor |
Planned Downtimescrew pressShow verbatim quote (Tabel 1)Desember 28 40.320 1.920 38.400 4.260 34.140 88,90 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 1,920 menit | Single extractor |
—Screw PressShow verbatim quote (Table 1, page 5)November | 25 | 36.000 | 3.000 | 33.000 | 720 | 32.280 | 97,81 | Equipment failure (breakdowns) | Lost time | 720 min | Single extractor |
—Screw PressShow verbatim quote (Table 1, page 6)Desember | 28 | 40.320 | 1.920 | 38.400 | 4.260 | 34.140 | 88,90 | Equipment failure (breakdowns) | Lost time | 4,260 min | Single extractor |
—Screw PressShow verbatim quote (Table 1, page 5)November | 25 | 36.000 | 3.000 | 33.000 | 720 | 32.280 | 97,81 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 3,000 min | Single extractor |
—Screw PressShow verbatim quote (Table 1, page 6)Desember | 28 | 40.320 | 1.920 | 38.400 | 4.260 | 34.140 | 88,90 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 1,920 min | Single extractor |
—Screw PressShow verbatim quote (Table 2, page 6)November | 29.800.000 | 0,07 | 32.280 | 64,62% | 0,014 | 4.172 | 99,98% | none | Throughput | 2.98 × 10⁷ kg | Single extractor |
—Screw PressShow verbatim quote (Table 2, page 6)Desember | 43.500.000 | 0,07 | 34.140 | 89,19% | 0,014 | 6.090 | 99,98% | none | Throughput | 4.35 × 10⁷ kg | Single extractor |
Observation units
- Mesin screw press · Separation (centrifugation, filtration, membranes) · Baseline