Evaluasi Kinerja Mesin Screw Press Melalui Penerapan Total Productive Maintenance (TPM) di Pabrik Kelapa Sawit PT. XYZ: Performance Evaluation of Screw Press Machine through the Implementation of Total Productive Maintenance (TPM) at Palm Oil Mill of PT. XYZ

Open source

1Bibliographic record

Authors
Yuliana Ningsih, Muhammad Khudari, Titis Linangsari, Mufrida Zein, Ema Lestari
Year
2025
Venue
Jurnal Teknologi Agro-Industri
Country
Indonesia
Segment
Grain and oilseed milling
Process family
Slaughter, cutting and primary processing
Study type
Single case study
Extraction scope
Full text
Size
1 plants · — lines · 1 machines
Observation period
61 days
Data collection
maintenance_records
Intervention
Show the setting as described by the study
PT. XYZ merupakan perusahaan yang beroperasi di sektor perkebunan serta pengolahan kelapa sawit, dengan produk utama berupa minyak kelapa sawit mentah (Crude Palm Oil/CPO) dan minyak inti sawit (Palm Kernel Oil/PKO).

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—screw press
Show verbatim quote (Tabel 3)
Rata-rata 93,35 76,90 99,98 71,23
noneQuality100.0 %Both extractors agreed
—screw press
Show verbatim quote (Tabel 3)
Rata-rata 93,35 76,90 99,98 71,23
nonePerformance76.9 %Both extractors agreed
—screw press
Show verbatim quote (Tabel 3)
Rata-rata 93,35 76,90 99,98 71,23
noneAvailability93.4 %Both extractors agreed
—screw press
Show verbatim quote (Tabel 3)
Rata-rata 93,35 76,90 99,98 71,23
noneOEE71.2 %Both extractors agreed
Dirtyscrew press
Show verbatim quote (Tabel 2)
Desember 43.500.000 0,07 34.140 89,19% 0,014 6.090 99,98%
Process defects (scrap and rework)Defect rate0.0140 %Both extractors agreed
Downtimescrew press
Show verbatim quote (Tabel 1)
November 25 36.000 3.000 33.000 720 32.280 97,81
Equipment failure (breakdowns)Lost time720 menitSingle extractor
Downtimescrew press
Show verbatim quote (Tabel 1)
Desember 28 40.320 1.920 38.400 4.260 34.140 88,90
Equipment failure (breakdowns)Lost time4,260 menitSingle extractor
Planned Downtimescrew press
Show verbatim quote (Tabel 1)
November 25 36.000 3.000 33.000 720 32.280 97,81
Planned downtime (scheduled maintenance, breaks, no demand)Lost time3,000 menitSingle extractor
Planned Downtimescrew press
Show verbatim quote (Tabel 1)
Desember 28 40.320 1.920 38.400 4.260 34.140 88,90
Planned downtime (scheduled maintenance, breaks, no demand)Lost time1,920 menitSingle extractor
—Screw Press
Show verbatim quote (Table 1, page 5)
November | 25 | 36.000 | 3.000 | 33.000 | 720 | 32.280 | 97,81
Equipment failure (breakdowns)Lost time720 minSingle extractor
—Screw Press
Show verbatim quote (Table 1, page 6)
Desember | 28 | 40.320 | 1.920 | 38.400 | 4.260 | 34.140 | 88,90
Equipment failure (breakdowns)Lost time4,260 minSingle extractor
—Screw Press
Show verbatim quote (Table 1, page 5)
November | 25 | 36.000 | 3.000 | 33.000 | 720 | 32.280 | 97,81
Planned downtime (scheduled maintenance, breaks, no demand)Lost time3,000 minSingle extractor
—Screw Press
Show verbatim quote (Table 1, page 6)
Desember | 28 | 40.320 | 1.920 | 38.400 | 4.260 | 34.140 | 88,90
Planned downtime (scheduled maintenance, breaks, no demand)Lost time1,920 minSingle extractor
—Screw Press
Show verbatim quote (Table 2, page 6)
November | 29.800.000 | 0,07 | 32.280 | 64,62% | 0,014 | 4.172 | 99,98%
noneThroughput2.98 × 10⁷ kgSingle extractor
—Screw Press
Show verbatim quote (Table 2, page 6)
Desember | 43.500.000 | 0,07 | 34.140 | 89,19% | 0,014 | 6.090 | 99,98%
noneThroughput4.35 × 10⁷ kgSingle extractor

Observation units

  • Mesin screw press · Separation (centrifugation, filtration, membranes) · Baseline