Machine Learning, MRP, and Lean Tools as an Internal Innovation Strategy to Improve Efficiency in a Bottling Company

Open source

1Bibliographic record

Authors
Haydee Manuelo, Hellyn Ruiz, Martin Saenz-Moron, Anita Straujuma
Year
2025
Venue
LACCEI International Multiconference on Entrepreneurship, Innovation and Regional Development (LEIRD)
Country
Peru
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
84 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
This format accounts for 94.48% of the company's total production volume, representing a critical point of intervention in its production management.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—sealing machine
Show verbatim quote (Section V.B.3)
After the implementation of autonomous maintenance, this value increased to 41.13 hours, representing an absolute improvement of 17.65 hours.
Equipment failure (breakdowns)Time between events41.1 hAdjudicated
—sealing machine
Show verbatim quote (Section V.B.3)
At the beginning of the study, the recorded MTBF was 23.48 hours.
Equipment failure (breakdowns)Time between events23.5 hAdjudicated
—
Show verbatim quote (Conclusions)
The application of the proposed management model increased production efficiency from 75% to 86%, evidencing an 11% improvement that contributed to reducing bottlenecks and optimizing installed capacity.
noneOEE86.0 %Both extractors agreed
—
Show verbatim quote (Section III / Table I)
Currently, the average efficiency of the production process is 75% (Table 1)
noneOEE75.0 %Both extractors agreed
—injection molding machine
Show verbatim quote (Table VII)
Availability (%) 89% 96% 97.17%
noneAvailability97.2 %Both extractors agreed
—injection molding machine
Show verbatim quote (Table VII)
Availability (%) 89% 96% 97.17%
noneAvailability89.0 %Both extractors agreed
lack of input
Show verbatim quote (Section III / Figure 1)
Figure 1 shows that stoppages due to lack of input represent the main cause of loss, accounting for 49% of the total, followed by defects in the finished product and mechanical failures in the blow molding machines, which together amount to 83% of the total impact.
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time49.0 %Single extractor
—
Show verbatim quote (Section III / Figure 1)
Figure 1 shows that stoppages due to lack of input represent the main cause of loss, accounting for 49% of the total, followed by defects in the finished product and mechanical failures in the blow molding machines, which together amount to 83% of the total impact.
Not classifiable from the reportShare of lost time83.0 %Single extractor
rework
Show verbatim quote (Section V.B.2 / Table VI)
In the initial process diagnosis, an inefficiency level of 19% was identified, reflecting high variability, rework, and bottlenecks.
Process defects (scrap and rework)Defect rate19.0 %Single extractor
rework
Show verbatim quote (Section V.B.2 / Table VI)
With the validation of the pilot test, this value was reduced to 13%, representing a relative improvement of 32% compared to the initial condition.
Process defects (scrap and rework)Defect rate13.0 %Single extractor
—injection molding machine
Show verbatim quote (Section V.B.3)
During the development of the pilot test, a machine availability of 97.71% was achieved, exceeding the proposed target by 1.171%, as indicated in [7].
noneAvailability97.7 %Single extractor
—blow molding machines
Show verbatim quote (Conclusions)
Autonomous maintenance raised the availability of blow moulding machines to 97.17% and improved the MTBF of the injection machine by 17.65 hours
noneAvailability97.2 %Single extractor
—
Show verbatim quote (Table VI, STANDARDIZED WORK METRIC RESULTS)
Standardized Work | Rework Rate (%) | 19% | 12% | 13%
Process defects (scrap and rework)Defect rate19.0 %Single extractor
lack of input
Show verbatim quote (Section V.B.1, Validation of MRP with Machine Learning)
The average stockout rate in 2024 was 30.47%, significantly affecting production due to supply shortages.
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time30.5 %Single extractor
—
Show verbatim quote (Table VI, STANDARDIZED WORK METRIC RESULTS)
Standardized Work | Rework Rate (%) | 19% | 12% | 13%
Process defects (scrap and rework)Defect rate13.0 %Single extractor
lack of input
Show verbatim quote (Section V.B.1, Validation of MRP with Machine Learning)
With the validation of the MRP during the first quarter of 2025, the indicator decreased to 20.60%
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time20.6 %Single extractor

Observation units

  • Sealing machine · Capping and seaming · After intervention
  • Sealing machine · Capping and seaming · Baseline
  • Whole plant · Whole line or unspecified equipment · After intervention
  • Whole plant · Whole line or unspecified equipment · Baseline
  • Injection molding machine · Forming, moulding and depositing · After intervention
  • Injection molding machine · Forming, moulding and depositing · Baseline
  • 8.5-liter bottling line · Whole line or unspecified equipment · Baseline
  • 8.5-liter bottling line · Whole line or unspecified equipment · After intervention
  • Blow molding machines · Forming, moulding and depositing · After intervention