Optimalisasi Maintenance Sebagai Upaya Meningkatkan Nilai Overall Performance Indicator (OPI) dengan Metode Kaizen pada PT. XYZ
1Bibliographic record
- Authors
- Andhy Rinanto
- Year
- 2025
- Venue
- AL-JAZARI JURNAL ILMIAH TEKNIK MESIN
- Country
- Indonesia
- Segment
- Brewing, wine and spirits
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- 274 days
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
PT. XYZ merupakan perusahaan yang memproduksi produk minuman alkohol dan non-alkohol.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Abstrak)pada bulan September 2023 atau selama week 39 sampai dengan week 42 nilai OPI pada bottling line PT. XYZ sebesar 63,3% | none | OEE | 63.3 % | Single extractor |
—Show verbatim quote (Tabel 12)Okt-23 73,66 87,27 99,79 64,14 Sebelum | none | OEE | 64.1 % | Single extractor |
—Show verbatim quote (Tabel 12)Nov-23 74,36 85,37 99,69 63,28 | none | OEE | 63.3 % | Single extractor |
—Show verbatim quote (Tabel 12)Des-23 67,07 97,58 99,87 65,36 | none | OEE | 65.4 % | Single extractor |
—Show verbatim quote (Tabel 12)Jan-24 71,30 89,47 99,79 63,66 | none | OEE | 63.7 % | Single extractor |
—Show verbatim quote (Tabel 12)Feb-24 68,19 93,29 99,61 63,37 | none | OEE | 63.4 % | Single extractor |
—Show verbatim quote (Tabel 12)Okt-23 73,66 87,27 99,79 64,14 Sebelum | none | Availability | 73.7 % | Single extractor |
—Show verbatim quote (Tabel 12)Nov-23 74,36 85,37 99,69 63,28 | none | Availability | 74.4 % | Single extractor |
—Show verbatim quote (Tabel 12)Des-23 67,07 97,58 99,87 65,36 | none | Availability | 67.1 % | Single extractor |
—Show verbatim quote (Tabel 12)Jan-24 71,30 89,47 99,79 63,66 | none | Availability | 71.3 % | Single extractor |
—Show verbatim quote (Tabel 12)Feb-24 68,19 93,29 99,61 63,37 | none | Availability | 68.2 % | Single extractor |
—Show verbatim quote (Tabel 12)Okt-23 73,66 87,27 99,79 64,14 Sebelum | none | Performance | 87.3 % | Single extractor |
—Show verbatim quote (Tabel 12)Nov-23 74,36 85,37 99,69 63,28 | none | Performance | 85.4 % | Single extractor |
—Show verbatim quote (Tabel 12)Des-23 67,07 97,58 99,87 65,36 | none | Performance | 97.6 % | Single extractor |
—Show verbatim quote (Tabel 12)Jan-24 71,30 89,47 99,79 63,66 | none | Performance | 89.5 % | Single extractor |
—Show verbatim quote (Tabel 12)Feb-24 68,19 93,29 99,61 63,37 | none | Performance | 93.3 % | Single extractor |
—Show verbatim quote (Tabel 12)Okt-23 73,66 87,27 99,79 64,14 Sebelum | none | Quality | 99.8 % | Single extractor |
—Show verbatim quote (Tabel 12)Nov-23 74,36 85,37 99,69 63,28 | none | Quality | 99.7 % | Single extractor |
—Show verbatim quote (Tabel 12)Des-23 67,07 97,58 99,87 65,36 | none | Quality | 99.9 % | Single extractor |
—Show verbatim quote (Tabel 12)Feb-24 68,19 93,29 99,61 63,37 | none | Quality | 99.6 % | Single extractor |
—Show verbatim quote (Tabel 4)1 Okt-23 14,88 498,65 2,98% | Equipment failure (breakdowns) | Share of planned time | 2.98 % | Single extractor |
—Show verbatim quote (Tabel 4)2 Nov-23 6,68 492,37 1,36% | Equipment failure (breakdowns) | Share of planned time | 1.36 % | Single extractor |
—Show verbatim quote (Tabel 4)3 Des-23 18,68 285,57 6,54% | Equipment failure (breakdowns) | Share of planned time | 6.54 % | Single extractor |
—Show verbatim quote (Tabel 4)4 Jan-24 20,07 394,02 5,09% | Equipment failure (breakdowns) | Share of planned time | 5.09 % | Single extractor |
—Show verbatim quote (Tabel 4)5 Feb-24 30,23 338,98 8,92% | Equipment failure (breakdowns) | Share of planned time | 8.92 % | Single extractor |
—Show verbatim quote (Tabel 5)1 Okt-23 3,83 498,65 0,77% | Setup and adjustments | Share of planned time | 0.770 % | Single extractor |
—Show verbatim quote (Tabel 5)2 Nov-23 3,88 492,37 0,79% | Setup and adjustments | Share of planned time | 0.790 % | Single extractor |
—Show verbatim quote (Tabel 5)3 Des-23 4,93 285,57 1,73% | Setup and adjustments | Share of planned time | 1.73 % | Single extractor |
—Show verbatim quote (Tabel 5)4 Jan-24 5,77 394,02 1,46% | Setup and adjustments | Share of planned time | 1.46 % | Single extractor |
—Show verbatim quote (Tabel 5)5 Feb-24 2,33 338,98 0,69% | Setup and adjustments | Share of planned time | 0.690 % | Single extractor |
—Show verbatim quote (Tabel 6)1 Okt-23 112,65 498,65 22,59% | Idling and minor stops (micro-stops) | Share of planned time | 22.6 % | Single extractor |
—Show verbatim quote (Tabel 6)2 Nov-23 115,68 492,37 23,49% | Idling and minor stops (micro-stops) | Share of planned time | 23.5 % | Single extractor |
—Show verbatim quote (Tabel 6)3 Des-23 70,42 285,57 24,66% | Idling and minor stops (micro-stops) | Share of planned time | 24.7 % | Single extractor |
—Show verbatim quote (Tabel 6)4 Jan-24 87,25 394,02 22,14% | Idling and minor stops (micro-stops) | Share of planned time | 22.1 % | Single extractor |
—Show verbatim quote (Tabel 6)5 Feb-24 75,26 338,98 22,20% | Idling and minor stops (micro-stops) | Share of planned time | 22.2 % | Single extractor |
—Show verbatim quote (Tabel 7)1 Okt-23 498,65 367,29 15.225.385 0,000021 9,54% | Reduced speed | Share of planned time | 9.54 % | Single extractor |
—Show verbatim quote (Tabel 7)2 Nov-23 492,37 366,13 14.846.066 0,000021 11,04% | Reduced speed | Share of planned time | 11.0 % | Single extractor |
—Show verbatim quote (Tabel 7)3 Des-23 285,57 191,54 8.877.873 0,000021 1,79% | Reduced speed | Share of planned time | 1.79 % | Single extractor |
—Show verbatim quote (Tabel 7)4 Jan-24 394,02 280,93 11.939.560 0,000021 7,66% | Reduced speed | Share of planned time | 7.66 % | Single extractor |
—Show verbatim quote (Tabel 7)5 Feb-24 338,98 231,16 10.243.393 0,000021 4,73% | Reduced speed | Share of planned time | 4.73 % | Single extractor |
—Show verbatim quote (Tabel 8)1 Okt-23 32,592 0,000021 498,65 0,14% | Process defects (scrap and rework) | Share of planned time | 0.140 % | Single extractor |
—Show verbatim quote (Tabel 8)2 Nov-23 46,497 0,000021 492,37 0,20% | Process defects (scrap and rework) | Share of planned time | 0.200 % | Single extractor |
—Show verbatim quote (Tabel 8)3 Des-23 11,438 0,000021 285,57 0,08% | Process defects (scrap and rework) | Share of planned time | 0.0800 % | Single extractor |
—Show verbatim quote (Tabel 8)4 Jan-24 25,275 0,000021 394,02 0,13% | Process defects (scrap and rework) | Share of planned time | 0.130 % | Single extractor |
—Show verbatim quote (Tabel 8)5 Feb-24 40,459 0,000021 338,98 0,25% | Process defects (scrap and rework) | Share of planned time | 0.250 % | Single extractor |
—Show verbatim quote (Tabel 1)1 Okt-23 522 23,35 498,65 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 23.4 jam | Single extractor |
—Show verbatim quote (Tabel 1)2 Nov-23 514 21,63 492,37 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 21.6 jam | Single extractor |
—Show verbatim quote (Tabel 1)3 Des-23 296 10,43 285,57 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 10.4 jam | Single extractor |
—Show verbatim quote (Tabel 1)4 Jan-24 413 18,98 394,02 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 19.0 jam | Single extractor |
—Show verbatim quote (Tabel 1)5 Feb-24 365 26,02 338,98 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 26.0 jam | Single extractor |
—Show verbatim quote (Tabel 3)1 Okt-23 3,83 14,88 112,65 131,36 | Equipment failure (breakdowns) | Lost time | 14.9 jam | Single extractor |
—Show verbatim quote (Tabel 3)2 Nov-23 3,88 6,68 115,68 126,24 | Equipment failure (breakdowns) | Lost time | 6.68 jam | Single extractor |
—Show verbatim quote (Tabel 3)3 Des-23 4,93 18,68 70,42 94,03 | Equipment failure (breakdowns) | Lost time | 18.7 jam | Single extractor |
—Show verbatim quote (Tabel 3)4 Jan-24 5,77 20,07 87,25 113,09 | Equipment failure (breakdowns) | Lost time | 20.1 jam | Single extractor |
—Show verbatim quote (Tabel 3)5 Feb-24 2,33 30,23 75,26 107,82 | Equipment failure (breakdowns) | Lost time | 30.2 jam | Single extractor |
—Show verbatim quote (Tabel 3)1 Okt-23 3,83 14,88 112,65 131,36 | Setup and adjustments | Lost time | 3.83 jam | Single extractor |
—Show verbatim quote (Tabel 3)2 Nov-23 3,88 6,68 115,68 126,24 | Setup and adjustments | Lost time | 3.88 jam | Single extractor |
—Show verbatim quote (Tabel 3)3 Des-23 4,93 18,68 70,42 94,03 | Setup and adjustments | Lost time | 4.93 jam | Single extractor |
—Show verbatim quote (Tabel 3)4 Jan-24 5,77 20,07 87,25 113,09 | Setup and adjustments | Lost time | 5.77 jam | Single extractor |
—Show verbatim quote (Tabel 3)5 Feb-24 2,33 30,23 75,26 107,82 | Setup and adjustments | Lost time | 2.33 jam | Single extractor |
—Show verbatim quote (Tabel 3)1 Okt-23 3,83 14,88 112,65 131,36 | Idling and minor stops (micro-stops) | Lost time | 113 jam | Single extractor |
—Show verbatim quote (Tabel 3)2 Nov-23 3,88 6,68 115,68 126,24 | Idling and minor stops (micro-stops) | Lost time | 116 jam | Single extractor |
—Show verbatim quote (Tabel 3)3 Des-23 4,93 18,68 70,42 94,03 | Idling and minor stops (micro-stops) | Lost time | 70.4 jam | Single extractor |
—Show verbatim quote (Tabel 3)4 Jan-24 5,77 20,07 87,25 113,09 | Idling and minor stops (micro-stops) | Lost time | 87.3 jam | Single extractor |
—Show verbatim quote (Tabel 3)5 Feb-24 2,33 30,23 75,26 107,82 | Idling and minor stops (micro-stops) | Lost time | 75.3 jam | Single extractor |
Total DowntimeShow verbatim quote (Tabel 3)1 Okt-23 3,83 14,88 112,65 131,36 | Not classifiable from the report | Lost time | 131 jam | Single extractor |
Total DowntimeShow verbatim quote (Tabel 3)2 Nov-23 3,88 6,68 115,68 126,24 | Not classifiable from the report | Lost time | 126 jam | Single extractor |
Total DowntimeShow verbatim quote (Tabel 3)3 Des-23 4,93 18,68 70,42 94,03 | Not classifiable from the report | Lost time | 94.0 jam | Single extractor |
Total DowntimeShow verbatim quote (Tabel 3)4 Jan-24 5,77 20,07 87,25 113,09 | Not classifiable from the report | Lost time | 113 jam | Single extractor |
Total DowntimeShow verbatim quote (Tabel 3)5 Feb-24 2,33 30,23 75,26 107,82 | Not classifiable from the report | Lost time | 108 jam | Single extractor |
—Show verbatim quote (Kesimpulan)Pada diagram pareto menunjukkan bahwa persentase penurunan efektivitas mesin akibat adanya idling and minor stoppages losses adalah sebesar 63,59%. | Idling and minor stops (micro-stops) | Share of lost time | 63.6 % | Single extractor |
—Show verbatim quote (Tabel 9)Mar 443,5 54,77 388,73 304,61 78,36% | none | Availability | 78.4 % | Single extractor |
—Show verbatim quote (Tabel 9)Apr 371,5 36,78 334,72 233,37 69,72% | none | Availability | 69.7 % | Single extractor |
—Show verbatim quote (Tabel 9)Mei 430,5 49,6 380,9 289,59 76,03% | none | Availability | 76.0 % | Single extractor |
—Show verbatim quote (Tabel 9)Jun 253 10,23 242,77 188,72 77,74% | none | Availability | 77.7 % | Single extractor |
—Show verbatim quote (Tabel 10)1 Mar-24 11.937.419 47.500 304,61 82,50% | none | Performance | 82.5 % | Single extractor |
—Show verbatim quote (Tabel 10)2 Apr-24 10.424.277 47.500 233,37 94,04% | none | Performance | 94.0 % | Single extractor |
—Show verbatim quote (Tabel 10)3 Mei-24 12.000.318 47.500 289,59 87,24% | none | Performance | 87.2 % | Single extractor |
—Show verbatim quote (Tabel 10)4 Jun-24 7.668.919 47.500 188,72 85,55% | none | Performance | 85.6 % | Single extractor |
—Show verbatim quote (Tabel 11)1 Mar-24 11.937.419 30,784 99,74% | none | Quality | 99.7 % | Single extractor |
—Show verbatim quote (Tabel 11)2 Apr-24 10.424.277 32,103 99,69% | none | Quality | 99.7 % | Single extractor |
—Show verbatim quote (Tabel 11)3 Mei-24 12.000.318 31,995 99,73% | none | Quality | 99.7 % | Single extractor |
—Show verbatim quote (Tabel 11)4 Jun-24 7.668.919 18,387 99,76% | none | Quality | 99.8 % | Single extractor |
—Show verbatim quote (Tabel 12)Mar-24 78,36 82,50 99,74 64,48 Proses Perbaikan | none | OEE | 64.5 % | Single extractor |
—Show verbatim quote (Tabel 12)Apr-24 69,72 94,04 99,69 65,36 | none | OEE | 65.4 % | Single extractor |
—Show verbatim quote (Tabel 12)Mei-24 76,03 87,24 99,73 66,15 Setelah | none | OEE | 66.2 % | Single extractor |
—Show verbatim quote (Tabel 12)Jun-24 77,74 85,55 99,76 66,34 | none | OEE | 66.3 % | Single extractor |
—Show verbatim quote (Tabel 9)Mar 443,5 54,77 388,73 304,61 78,36% | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 54.8 jam | Single extractor |
—Show verbatim quote (Tabel 9)Apr 371,5 36,78 334,72 233,37 69,72% | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 36.8 jam | Single extractor |
—Show verbatim quote (Tabel 9)Mei 430,5 49,6 380,9 289,59 76,03% | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 49.6 jam | Single extractor |
—Show verbatim quote (Tabel 9)Jun 253 10,23 242,77 188,72 77,74% | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 10.2 jam | Single extractor |
Observation units
- Bottling line · Whole line or unspecified equipment · Baseline
- Bottling line · Whole line or unspecified equipment · After intervention