Optimalisasi Maintenance Sebagai Upaya Meningkatkan Nilai Overall Performance Indicator (OPI) dengan Metode Kaizen pada PT. XYZ

Open source

1Bibliographic record

Authors
Andhy Rinanto
Year
2025
Venue
AL-JAZARI JURNAL ILMIAH TEKNIK MESIN
Country
Indonesia
Segment
Brewing, wine and spirits
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
274 days
Data collection
not_reported
Intervention
Show the setting as described by the study
PT. XYZ merupakan perusahaan yang memproduksi produk minuman alkohol dan non-alkohol.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Abstrak)
pada bulan September 2023 atau selama week 39 sampai dengan week 42 nilai OPI pada bottling line PT. XYZ sebesar 63,3%
noneOEE63.3 %Single extractor
—
Show verbatim quote (Tabel 12)
Okt-23 73,66 87,27 99,79 64,14 Sebelum
noneOEE64.1 %Single extractor
—
Show verbatim quote (Tabel 12)
Nov-23 74,36 85,37 99,69 63,28
noneOEE63.3 %Single extractor
—
Show verbatim quote (Tabel 12)
Des-23 67,07 97,58 99,87 65,36
noneOEE65.4 %Single extractor
—
Show verbatim quote (Tabel 12)
Jan-24 71,30 89,47 99,79 63,66
noneOEE63.7 %Single extractor
—
Show verbatim quote (Tabel 12)
Feb-24 68,19 93,29 99,61 63,37
noneOEE63.4 %Single extractor
—
Show verbatim quote (Tabel 12)
Okt-23 73,66 87,27 99,79 64,14 Sebelum
noneAvailability73.7 %Single extractor
—
Show verbatim quote (Tabel 12)
Nov-23 74,36 85,37 99,69 63,28
noneAvailability74.4 %Single extractor
—
Show verbatim quote (Tabel 12)
Des-23 67,07 97,58 99,87 65,36
noneAvailability67.1 %Single extractor
—
Show verbatim quote (Tabel 12)
Jan-24 71,30 89,47 99,79 63,66
noneAvailability71.3 %Single extractor
—
Show verbatim quote (Tabel 12)
Feb-24 68,19 93,29 99,61 63,37
noneAvailability68.2 %Single extractor
—
Show verbatim quote (Tabel 12)
Okt-23 73,66 87,27 99,79 64,14 Sebelum
nonePerformance87.3 %Single extractor
—
Show verbatim quote (Tabel 12)
Nov-23 74,36 85,37 99,69 63,28
nonePerformance85.4 %Single extractor
—
Show verbatim quote (Tabel 12)
Des-23 67,07 97,58 99,87 65,36
nonePerformance97.6 %Single extractor
—
Show verbatim quote (Tabel 12)
Jan-24 71,30 89,47 99,79 63,66
nonePerformance89.5 %Single extractor
—
Show verbatim quote (Tabel 12)
Feb-24 68,19 93,29 99,61 63,37
nonePerformance93.3 %Single extractor
—
Show verbatim quote (Tabel 12)
Okt-23 73,66 87,27 99,79 64,14 Sebelum
noneQuality99.8 %Single extractor
—
Show verbatim quote (Tabel 12)
Nov-23 74,36 85,37 99,69 63,28
noneQuality99.7 %Single extractor
—
Show verbatim quote (Tabel 12)
Des-23 67,07 97,58 99,87 65,36
noneQuality99.9 %Single extractor
—
Show verbatim quote (Tabel 12)
Feb-24 68,19 93,29 99,61 63,37
noneQuality99.6 %Single extractor
—
Show verbatim quote (Tabel 4)
1 Okt-23 14,88 498,65 2,98%
Equipment failure (breakdowns)Share of planned time2.98 %Single extractor
—
Show verbatim quote (Tabel 4)
2 Nov-23 6,68 492,37 1,36%
Equipment failure (breakdowns)Share of planned time1.36 %Single extractor
—
Show verbatim quote (Tabel 4)
3 Des-23 18,68 285,57 6,54%
Equipment failure (breakdowns)Share of planned time6.54 %Single extractor
—
Show verbatim quote (Tabel 4)
4 Jan-24 20,07 394,02 5,09%
Equipment failure (breakdowns)Share of planned time5.09 %Single extractor
—
Show verbatim quote (Tabel 4)
5 Feb-24 30,23 338,98 8,92%
Equipment failure (breakdowns)Share of planned time8.92 %Single extractor
—
Show verbatim quote (Tabel 5)
1 Okt-23 3,83 498,65 0,77%
Setup and adjustmentsShare of planned time0.770 %Single extractor
—
Show verbatim quote (Tabel 5)
2 Nov-23 3,88 492,37 0,79%
Setup and adjustmentsShare of planned time0.790 %Single extractor
—
Show verbatim quote (Tabel 5)
3 Des-23 4,93 285,57 1,73%
Setup and adjustmentsShare of planned time1.73 %Single extractor
—
Show verbatim quote (Tabel 5)
4 Jan-24 5,77 394,02 1,46%
Setup and adjustmentsShare of planned time1.46 %Single extractor
—
Show verbatim quote (Tabel 5)
5 Feb-24 2,33 338,98 0,69%
Setup and adjustmentsShare of planned time0.690 %Single extractor
—
Show verbatim quote (Tabel 6)
1 Okt-23 112,65 498,65 22,59%
Idling and minor stops (micro-stops)Share of planned time22.6 %Single extractor
—
Show verbatim quote (Tabel 6)
2 Nov-23 115,68 492,37 23,49%
Idling and minor stops (micro-stops)Share of planned time23.5 %Single extractor
—
Show verbatim quote (Tabel 6)
3 Des-23 70,42 285,57 24,66%
Idling and minor stops (micro-stops)Share of planned time24.7 %Single extractor
—
Show verbatim quote (Tabel 6)
4 Jan-24 87,25 394,02 22,14%
Idling and minor stops (micro-stops)Share of planned time22.1 %Single extractor
—
Show verbatim quote (Tabel 6)
5 Feb-24 75,26 338,98 22,20%
Idling and minor stops (micro-stops)Share of planned time22.2 %Single extractor
—
Show verbatim quote (Tabel 7)
1 Okt-23 498,65 367,29 15.225.385 0,000021 9,54%
Reduced speedShare of planned time9.54 %Single extractor
—
Show verbatim quote (Tabel 7)
2 Nov-23 492,37 366,13 14.846.066 0,000021 11,04%
Reduced speedShare of planned time11.0 %Single extractor
—
Show verbatim quote (Tabel 7)
3 Des-23 285,57 191,54 8.877.873 0,000021 1,79%
Reduced speedShare of planned time1.79 %Single extractor
—
Show verbatim quote (Tabel 7)
4 Jan-24 394,02 280,93 11.939.560 0,000021 7,66%
Reduced speedShare of planned time7.66 %Single extractor
—
Show verbatim quote (Tabel 7)
5 Feb-24 338,98 231,16 10.243.393 0,000021 4,73%
Reduced speedShare of planned time4.73 %Single extractor
—
Show verbatim quote (Tabel 8)
1 Okt-23 32,592 0,000021 498,65 0,14%
Process defects (scrap and rework)Share of planned time0.140 %Single extractor
—
Show verbatim quote (Tabel 8)
2 Nov-23 46,497 0,000021 492,37 0,20%
Process defects (scrap and rework)Share of planned time0.200 %Single extractor
—
Show verbatim quote (Tabel 8)
3 Des-23 11,438 0,000021 285,57 0,08%
Process defects (scrap and rework)Share of planned time0.0800 %Single extractor
—
Show verbatim quote (Tabel 8)
4 Jan-24 25,275 0,000021 394,02 0,13%
Process defects (scrap and rework)Share of planned time0.130 %Single extractor
—
Show verbatim quote (Tabel 8)
5 Feb-24 40,459 0,000021 338,98 0,25%
Process defects (scrap and rework)Share of planned time0.250 %Single extractor
—
Show verbatim quote (Tabel 1)
1 Okt-23 522 23,35 498,65
Planned downtime (scheduled maintenance, breaks, no demand)Lost time23.4 jamSingle extractor
—
Show verbatim quote (Tabel 1)
2 Nov-23 514 21,63 492,37
Planned downtime (scheduled maintenance, breaks, no demand)Lost time21.6 jamSingle extractor
—
Show verbatim quote (Tabel 1)
3 Des-23 296 10,43 285,57
Planned downtime (scheduled maintenance, breaks, no demand)Lost time10.4 jamSingle extractor
—
Show verbatim quote (Tabel 1)
4 Jan-24 413 18,98 394,02
Planned downtime (scheduled maintenance, breaks, no demand)Lost time19.0 jamSingle extractor
—
Show verbatim quote (Tabel 1)
5 Feb-24 365 26,02 338,98
Planned downtime (scheduled maintenance, breaks, no demand)Lost time26.0 jamSingle extractor
—
Show verbatim quote (Tabel 3)
1 Okt-23 3,83 14,88 112,65 131,36
Equipment failure (breakdowns)Lost time14.9 jamSingle extractor
—
Show verbatim quote (Tabel 3)
2 Nov-23 3,88 6,68 115,68 126,24
Equipment failure (breakdowns)Lost time6.68 jamSingle extractor
—
Show verbatim quote (Tabel 3)
3 Des-23 4,93 18,68 70,42 94,03
Equipment failure (breakdowns)Lost time18.7 jamSingle extractor
—
Show verbatim quote (Tabel 3)
4 Jan-24 5,77 20,07 87,25 113,09
Equipment failure (breakdowns)Lost time20.1 jamSingle extractor
—
Show verbatim quote (Tabel 3)
5 Feb-24 2,33 30,23 75,26 107,82
Equipment failure (breakdowns)Lost time30.2 jamSingle extractor
—
Show verbatim quote (Tabel 3)
1 Okt-23 3,83 14,88 112,65 131,36
Setup and adjustmentsLost time3.83 jamSingle extractor
—
Show verbatim quote (Tabel 3)
2 Nov-23 3,88 6,68 115,68 126,24
Setup and adjustmentsLost time3.88 jamSingle extractor
—
Show verbatim quote (Tabel 3)
3 Des-23 4,93 18,68 70,42 94,03
Setup and adjustmentsLost time4.93 jamSingle extractor
—
Show verbatim quote (Tabel 3)
4 Jan-24 5,77 20,07 87,25 113,09
Setup and adjustmentsLost time5.77 jamSingle extractor
—
Show verbatim quote (Tabel 3)
5 Feb-24 2,33 30,23 75,26 107,82
Setup and adjustmentsLost time2.33 jamSingle extractor
—
Show verbatim quote (Tabel 3)
1 Okt-23 3,83 14,88 112,65 131,36
Idling and minor stops (micro-stops)Lost time113 jamSingle extractor
—
Show verbatim quote (Tabel 3)
2 Nov-23 3,88 6,68 115,68 126,24
Idling and minor stops (micro-stops)Lost time116 jamSingle extractor
—
Show verbatim quote (Tabel 3)
3 Des-23 4,93 18,68 70,42 94,03
Idling and minor stops (micro-stops)Lost time70.4 jamSingle extractor
—
Show verbatim quote (Tabel 3)
4 Jan-24 5,77 20,07 87,25 113,09
Idling and minor stops (micro-stops)Lost time87.3 jamSingle extractor
—
Show verbatim quote (Tabel 3)
5 Feb-24 2,33 30,23 75,26 107,82
Idling and minor stops (micro-stops)Lost time75.3 jamSingle extractor
Total Downtime
Show verbatim quote (Tabel 3)
1 Okt-23 3,83 14,88 112,65 131,36
Not classifiable from the reportLost time131 jamSingle extractor
Total Downtime
Show verbatim quote (Tabel 3)
2 Nov-23 3,88 6,68 115,68 126,24
Not classifiable from the reportLost time126 jamSingle extractor
Total Downtime
Show verbatim quote (Tabel 3)
3 Des-23 4,93 18,68 70,42 94,03
Not classifiable from the reportLost time94.0 jamSingle extractor
Total Downtime
Show verbatim quote (Tabel 3)
4 Jan-24 5,77 20,07 87,25 113,09
Not classifiable from the reportLost time113 jamSingle extractor
Total Downtime
Show verbatim quote (Tabel 3)
5 Feb-24 2,33 30,23 75,26 107,82
Not classifiable from the reportLost time108 jamSingle extractor
—
Show verbatim quote (Kesimpulan)
Pada diagram pareto menunjukkan bahwa persentase penurunan efektivitas mesin akibat adanya idling and minor stoppages losses adalah sebesar 63,59%.
Idling and minor stops (micro-stops)Share of lost time63.6 %Single extractor
—
Show verbatim quote (Tabel 9)
Mar 443,5 54,77 388,73 304,61 78,36%
noneAvailability78.4 %Single extractor
—
Show verbatim quote (Tabel 9)
Apr 371,5 36,78 334,72 233,37 69,72%
noneAvailability69.7 %Single extractor
—
Show verbatim quote (Tabel 9)
Mei 430,5 49,6 380,9 289,59 76,03%
noneAvailability76.0 %Single extractor
—
Show verbatim quote (Tabel 9)
Jun 253 10,23 242,77 188,72 77,74%
noneAvailability77.7 %Single extractor
—
Show verbatim quote (Tabel 10)
1 Mar-24 11.937.419 47.500 304,61 82,50%
nonePerformance82.5 %Single extractor
—
Show verbatim quote (Tabel 10)
2 Apr-24 10.424.277 47.500 233,37 94,04%
nonePerformance94.0 %Single extractor
—
Show verbatim quote (Tabel 10)
3 Mei-24 12.000.318 47.500 289,59 87,24%
nonePerformance87.2 %Single extractor
—
Show verbatim quote (Tabel 10)
4 Jun-24 7.668.919 47.500 188,72 85,55%
nonePerformance85.6 %Single extractor
—
Show verbatim quote (Tabel 11)
1 Mar-24 11.937.419 30,784 99,74%
noneQuality99.7 %Single extractor
—
Show verbatim quote (Tabel 11)
2 Apr-24 10.424.277 32,103 99,69%
noneQuality99.7 %Single extractor
—
Show verbatim quote (Tabel 11)
3 Mei-24 12.000.318 31,995 99,73%
noneQuality99.7 %Single extractor
—
Show verbatim quote (Tabel 11)
4 Jun-24 7.668.919 18,387 99,76%
noneQuality99.8 %Single extractor
—
Show verbatim quote (Tabel 12)
Mar-24 78,36 82,50 99,74 64,48 Proses Perbaikan
noneOEE64.5 %Single extractor
—
Show verbatim quote (Tabel 12)
Apr-24 69,72 94,04 99,69 65,36
noneOEE65.4 %Single extractor
—
Show verbatim quote (Tabel 12)
Mei-24 76,03 87,24 99,73 66,15 Setelah
noneOEE66.2 %Single extractor
—
Show verbatim quote (Tabel 12)
Jun-24 77,74 85,55 99,76 66,34
noneOEE66.3 %Single extractor
—
Show verbatim quote (Tabel 9)
Mar 443,5 54,77 388,73 304,61 78,36%
Planned downtime (scheduled maintenance, breaks, no demand)Lost time54.8 jamSingle extractor
—
Show verbatim quote (Tabel 9)
Apr 371,5 36,78 334,72 233,37 69,72%
Planned downtime (scheduled maintenance, breaks, no demand)Lost time36.8 jamSingle extractor
—
Show verbatim quote (Tabel 9)
Mei 430,5 49,6 380,9 289,59 76,03%
Planned downtime (scheduled maintenance, breaks, no demand)Lost time49.6 jamSingle extractor
—
Show verbatim quote (Tabel 9)
Jun 253 10,23 242,77 188,72 77,74%
Planned downtime (scheduled maintenance, breaks, no demand)Lost time10.2 jamSingle extractor

Observation units

  • Bottling line · Whole line or unspecified equipment · Baseline
  • Bottling line · Whole line or unspecified equipment · After intervention