On the Prediction of Spur Gear Maintainability in Bottling Machines based on Failure Data
1Bibliographic record
- Authors
- Enesi Yekini Salawu, Opeyemi Ernest Akerekan, Femi E. Adegbite, Olasehinde O. Nifemi, Samson O. Ongbali, Joseph O. Dirisu, Ogunkola B. Abiodun, Emmanuel O. Ajanaku
- Year
- 2026
- Venue
- Recent Progress in Science and Engineering
- Country
- —
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- — plants · — lines · 1 machines
- Observation period
- 365 days
- Data collection
- maintenance_records
- Intervention
Show the setting as described by the study
In bottling companies, spur gears play a vital role in ensuring efficient mechanical power transmission in bottling machines.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%. | 0 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
spur gear failurespur gearShow verbatim quote (Table 1)December 26.4 9 | Equipment failure (breakdowns) | Number of events | 9.00 events | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)December 26.4 9 | Equipment failure (breakdowns) | Mean event duration | 26.4 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)October 11.2 4 | Equipment failure (breakdowns) | Number of events | 4.00 events | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)October 11.2 4 | Equipment failure (breakdowns) | Mean event duration | 11.2 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)January 14.8 7 | Equipment failure (breakdowns) | Number of events | 7.00 events | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)January 14.8 7 | Equipment failure (breakdowns) | Mean event duration | 14.8 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 2)Total 106 2007.5 10000 | Equipment failure (breakdowns) | Lost time | 2,008 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)September 16.7 11 | Equipment failure (breakdowns) | Number of events | 11.0 events | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)September 16.7 11 | Equipment failure (breakdowns) | Mean event duration | 16.7 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)November 21.1 13 | Equipment failure (breakdowns) | Number of events | 13.0 events | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)November 21.1 13 | Equipment failure (breakdowns) | Mean event duration | 21.1 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)February 17.1 10 | Equipment failure (breakdowns) | Number of events | 10.0 events | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)February 17.1 10 | Equipment failure (breakdowns) | Mean event duration | 17.1 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)March 14.6 8 | Equipment failure (breakdowns) | Number of events | 8.00 events | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)March 14.6 8 | Equipment failure (breakdowns) | Mean event duration | 14.6 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 2)September 16.7 11 183.7 1040 75.4 | Equipment failure (breakdowns) | Lost time | 184 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)August 17.8 12 | Equipment failure (breakdowns) | Number of events | 12.0 events | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)August 17.8 12 | Equipment failure (breakdowns) | Mean event duration | 17.8 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)July 15.3 5 | Equipment failure (breakdowns) | Number of events | 5.00 events | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)July 15.3 5 | Equipment failure (breakdowns) | Mean event duration | 15.3 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)June 18.6 6 | Equipment failure (breakdowns) | Number of events | 6.00 events | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)June 18.6 6 | Equipment failure (breakdowns) | Mean event duration | 18.6 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)April 18 5 | Equipment failure (breakdowns) | Mean event duration | 18.0 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 2)November 21.1 13 274.3 1230 91.5 | Equipment failure (breakdowns) | Lost time | 274 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 2)December 26.4 9 237.6 850 100 | Equipment failure (breakdowns) | Lost time | 238 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 2)August 17.8 12 213.6 1130 65 | Equipment failure (breakdowns) | Lost time | 214 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 2)January 14.8 7 103.6 660 6.6 | Equipment failure (breakdowns) | Lost time | 104 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 1)Total 106 | Equipment failure (breakdowns) | Number of events | 106 events | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 2)February 17.1 10 171 940 16 | Equipment failure (breakdowns) | Lost time | 171 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 2)October 11.2 4 44.8 380 79.2 | Equipment failure (breakdowns) | Lost time | 44.8 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 2)March 14.6 8 116.8 750 23.5 | Equipment failure (breakdowns) | Lost time | 117 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 2)June 18.6 6 111.6 570 49 | Equipment failure (breakdowns) | Lost time | 112 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 2)May 24 16 384 1510 43.3 | Equipment failure (breakdowns) | Lost time | 384 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 2)July 15.3 5 76.5 470 53.7 | Equipment failure (breakdowns) | Lost time | 76.5 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 2)April 18 5 90 470 28.2 | Equipment failure (breakdowns) | Lost time | 90.0 h | Both extractors agreed |
spur gear failurespur gearShow verbatim quote (Table 2)January 14.8 7 103.6 660 6.6 | Equipment failure (breakdowns) | Share of loss events | 660 % | Single extractor |
spur gear failurespur gearShow verbatim quote (Table 2)February 17.1 10 171 940 16 | Equipment failure (breakdowns) | Share of loss events | 940 % | Single extractor |
spur gear failurespur gearShow verbatim quote (Table 2)March 14.6 8 116.8 750 23.5 | Equipment failure (breakdowns) | Share of loss events | 750 % | Single extractor |
spur gear failurespur gearShow verbatim quote (Table 2)April 18 5 90 470 28.2 | Equipment failure (breakdowns) | Share of loss events | 470 % | Single extractor |
spur gear failurespur gearShow verbatim quote (Table 2)May 24 16 384 1510 43.3 | Equipment failure (breakdowns) | Share of loss events | 1,510 % | Single extractor |
spur gear failurespur gearShow verbatim quote (Table 2)June 18.6 6 111.6 570 49 | Equipment failure (breakdowns) | Share of loss events | 570 % | Single extractor |
spur gear failurespur gearShow verbatim quote (Table 2)August 17.8 12 213.6 1130 65 | Equipment failure (breakdowns) | Share of loss events | 1,130 % | Single extractor |
spur gear failurespur gearShow verbatim quote (Table 2)September 16.7 11 183.7 1040 75.4 | Equipment failure (breakdowns) | Share of loss events | 1,040 % | Single extractor |
spur gear failurespur gearShow verbatim quote (Table 2)October 11.2 4 44.8 380 79.2 | Equipment failure (breakdowns) | Share of loss events | 380 % | Single extractor |
spur gear failurespur gearShow verbatim quote (Table 2)November 21.1 13 274.3 1230 91.5 | Equipment failure (breakdowns) | Share of loss events | 1,230 % | Single extractor |
spur gear failurespur gearShow verbatim quote (Table 2)December 26.4 9 237.6 850 100 | Equipment failure (breakdowns) | Share of loss events | 850 % | Single extractor |
Observation units
- Spur gear (bottling machine) · Whole line or unspecified equipment · Baseline