Reducing Changeover Time Through SMED Methodology: A Review and Case Application in Beverage Bottling

Open source

1Bibliographic record

Authors
Nishchay Selot -
Year
2026
Venue
International Scientific Journal of Engineering and Management
Country
—
Segment
Dairy products
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Abstract only
Size
1 plants · 1 lines · — machines
Observation period
—
Data collection
not_reported
Intervention
Show the setting as described by the study
A primary case study applies SMED to a product changeover at a milk beverage bottling plant using Tetra Pak aseptic filling equipment.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 6High risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
product changeoverTetra Pak aseptic filling equipment
Show verbatim quote (Abstract)
The intervention reduced average changeover time from 40 minutes to approximately 28 minutes - a 30% reduction
Setup and adjustmentsLost time28.0 minBoth extractors agreed
product changeoverTetra Pak aseptic filling equipment
Show verbatim quote (Abstract)
The intervention reduced average changeover time from 40 minutes to approximately 28 minutes - a 30% reduction
Setup and adjustmentsLost time40.0 minBoth extractors agreed

Observation units

  • milk beverage bottling line (Tetra Pak aseptic filling) · Filling · After intervention
  • milk beverage bottling line (Tetra Pak aseptic filling) · Filling · Baseline