Included study
Reducing Changeover Time Through SMED Methodology: A Review and Case Application in Beverage Bottling
1Bibliographic record
- Authors
- Nishchay Selot -
- Year
- 2026
- Venue
- International Scientific Journal of Engineering and Management
- Country
- —
- Segment
- Dairy products
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Abstract only
- Size
- 1 plants · 1 lines · — machines
- Observation period
- —
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
A primary case study applies SMED to a product changeover at a milk beverage bottling plant using Tetra Pak aseptic filling equipment.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 6High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
product changeoverTetra Pak aseptic filling equipmentShow verbatim quote (Abstract)The intervention reduced average changeover time from 40 minutes to approximately 28 minutes - a 30% reduction | Setup and adjustments | Lost time | 28.0 min | Both extractors agreed |
product changeoverTetra Pak aseptic filling equipmentShow verbatim quote (Abstract)The intervention reduced average changeover time from 40 minutes to approximately 28 minutes - a 30% reduction | Setup and adjustments | Lost time | 40.0 min | Both extractors agreed |
Observation units
- milk beverage bottling line (Tetra Pak aseptic filling) · Filling · After intervention
- milk beverage bottling line (Tetra Pak aseptic filling) · Filling · Baseline