Proposal to reduce material and product waste in a manufacturing process

Open source

1Bibliographic record

Authors
Vinicius Croque
Year
2021
Venue
Institutional Repository of the Federal Technological University of Paraná (RIUT) (Federal University of Technology – Paraná)
DOI
—
Country
—
Segment
Dairy products
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Abstract only
Size
1 plants · 1 lines · — machines
Observation period
—
Data collection
not_reported
Intervention
Show the setting as described by the study
used to analyze all losses related to plastic sheet and product of a yogurt filling process

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 5High risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
mechanical maintenance failures
Show verbatim quote (abstract)
view the decrease in machine downtime due to mechanical maintenance failures, which was 54 hours approximately, reducing to 20 hours, in a period of next comparison.
Equipment failure (breakdowns)Lost time20.0 hBoth extractors agreed
mechanical maintenance failures
Show verbatim quote (abstract)
view the decrease in machine downtime due to mechanical maintenance failures, which was 54 hours approximately, reducing to 20 hours, in a period of next comparison.
Equipment failure (breakdowns)Lost time54.0 hBoth extractors agreed

Observation units

  • Yogurt filling line · Filling · After intervention
  • Yogurt filling line · Filling · Baseline