Improvement Model for the Production Area to increase Labor Productivity through Lean Manufacturing tools in a bakery company

Open source

1Bibliographic record

Authors
Ana Paula Fouscas-Chang, Juan Adrian Lucero-Ugaz, Jorge Antonio Corzo-Chávez, Gino Viacava-Campos
Year
2026
Venue
LACCEI International Multi-Conference for Engineering, Education and Technology (LACCEI)
Country
Peru
Segment
Bakery and pasta
Process family
Forming, baking and cooking
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
—
Data collection
manual_logs
Intervention
Show the setting as described by the study
The company under study, dedicated to the production of healthy cookies made from Peruvian grains, exhibits a labor productivity of 1.46 kg/man-hour—less than half of the sector benchmark of 3 kg/man-hour—resulting in an annual economic impact of approximately 146817 USD.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 9Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Section II (Problem))
The indicator currently stands at 8.45%, which is alarmingly high compared to the industry acceptance limit of 3%
Process defects (scrap and rework)Defect rate8.45 %Both extractors agreed
format changeovers (changing from circular to rectangular cookies)
Show verbatim quote (Section II (Problem))
It was documented that the setup time averages 1.37 hours per day (82 minutes), consuming a significant portion of the available shift time.
Setup and adjustmentsLost time82.0 minBoth extractors agreed

Observation units

  • Cookie production line · Whole line or unspecified equipment · Baseline